PRIMER NIVEL
EJE:PISO:TR NUDO/CLARO
AMO
NUDO
1-1: A-B'
CLARO
L DE VIGA
en cm ejej a eje 386
NUDO
1 2
b h Mu Mu 1/4 Mmáx tramo
ITEM
cm cm (Tonf-m) (Kgf.cm)
30 50 M(-) 6.92 692341.00
30 50 M(+) 4.26 425685.00
30 50 M(-) 1.75 175084.50
214656.50
30 50 M(+) 0.46 45703.50
30 50 M(-) 8.59 858626.00
30 50 M(+) 4.72 471890.00
3 4 5 6 7 8
mf SECCIÓN RECTUGULAR capas
MOMENT. PARA ρb
TRABAJAR
Mcr 1.2*Mcr #
692341.00 362284.42 434741.30 692341.00 0.022 1
425685.00 362284.42 434741.30 434741.30 0.022 1
214656.50 362284.42 434741.30 434741.30 0.022 1
214656.50 362284.42 434741.30 434741.30 0.022 1
858626.00 362284.42 434741.30 858626.00 0.022 1
471890.00 362284.42 434741.30 471890.00 0.022 1
9 10 11 12 13 14
d As requerido (
reforsamient a As ρ ρmin ρmax
o
cm sim. Refor.
sim. Refor. 43.778 3.41 4.35 0.0033 0.0024 0.0165 4.35
sim. Refor. 43.778 2.11 2.69 0.0020 0.0024 0.0165 3.17
sim. Refor. 43.778 2.11 2.69 0.0020 0.0024 0.0165 3.17
sim. Refor. 43.778 2.11 2.69 0.0020 0.0024 0.0165 3.17
sim. Refor. 43.778 4.28 5.46 0.0042 0.0024 0.0165 5.46
sim. Refor. 43.778 2.30 2.93 0.0022 0.0024 0.0165 3.17
15 16 17 18 19 20 21 22
N de Barras - tracción - sim. As - sim.
As requerido (cm2) Momento Resist
Refor. Refor.
23 24 25 26 27 28 29 30 31 32
Momento Resistente
As FINAL bmin
M Resistente (kg -cm) Verificación
814403 OK 22.48
CORRECTO
814403 OK 22.48
814403 CORRECTO OK 22.48
814403 CORRECTO OK 22.48
814403 seguir cal 22.48
CORRECTO
814403 OK 22.48
33 34 35 36
BASTÓN - TRACCIÓN - SIMPLEMENTE R
As completar delta As VER. MAX
CUANTÍA
¿REQUIERE
BASTÓN?
cm
NO
NO
NO
NO
SI -0.30 0.99 OK
NO
37 38 39 40 41 42
MPLEMENTE REFORSADO
Dist.
ALFA MOM B. MÍN PRIMERA BASTON Long.de baston (cm)
Teórica
43 44 45 46 47 48 49 50 51 52 53 54
Dist.
ALFA MOM B. MÍN SEGUNDO BASTON Long.de baston (cm)
Teórica
55 56 57 58 59 60 61 62 63 64 65 66 67
BASTÓN - COMPRESIÓN - DOBLEMENTE REFORSADO
Dist.
¿REQUIERE As completar delta As ALFA MOM Teórica
BASTÓN POR
COM.? cm cm (SAP) cm 1/2 5/8 3/4
NO Err:511 0.00
NO Err:511 0.00
NO Err:511 0.00
NO Err:511 0.00
NO Err:511 0.00
NO Err:511 0.00
68 69 70 71 72 73 74 75 76 77
Longitud de baston (cm) VER MOM
78 79 80 81 82 83 84 85 86 87 88 89 90 91
ACERO TOTAL DE LA VIGA
103 104 105 106 107 108 109 110 111 112 113
As Superior As inferior
S M- I M+ S M- I M+
5.16 5.16 6.45 5.16
114 115 116 117 118 119 120 121 122 123 124
d sup d sup LONG inicio fin
Øacero=
1/2 d m- dm+ d m- dm+ M sup M inf M supe Minf
0.5 44.4 44.4 44.4 44.4 386 826642.1075 826642.1075 1020968.717 826642.1075
125 126 127 128 129 130 131 132 133 134
135 136
Datos de la Viga
F'c = 210 Kg/cm2 Momentos Apoyo Izquierdo
long a restar Fy = 4200 Kg/cm2
Momento Resistente Superior8.27
0.4 φ= 0.9 Momento Resistente Inferior8.27
Estribos 3/8 pulg
1.27
Diámetro de Barra Menor
V Máximo 14.31Tn
X 3.46m
V afuera de Z.C.
Zona de Confinamiento 100
7767.7657219218 6.6 Zona Central 146
to@22cm
IVEL
Valores de Cortante
Cortantes Casos Espaciamiento Condiciones
Vu 13.32Tn d/4=NO CUMPLE
Vn 15.67Tn S 48.68 10*db=NO CUMPLE
Vc 10.23Tn Caso 3 24*de=NO CUMPLE
8
Zona de Confinamiento @12.00 cm