Customer : Xylem water solution Project : Sitaramapuram PO NO. : 835803
2 Before painting surface finish report is not available for Surface finish was not checked. Same will be checked in
set 1 & 2. further set.
3 After painting DFT observed 180-200 µm instead of Final coat is balance, same will be done before dispatch.
200-250 µm in set 1 & 2.
4 Some grinding marks need to be repaired on assemblies Will be completed before dispatch
of set 2