Вы находитесь на странице: 1из 6

30 kV Distribution Feeder lines from 110/30kV Nyabihu Substation

Vol V: Technical Specifications


Page1 of 7

T-S-13-06TECHNICAL SCHEDULES / STEEL TOWERS


SN STEEL TOWERS UNIT Employer Contractor
1. PROJECT REQUIREMENTS
All standard accessories, including those not indicated in
this Specification, shall be furnished.
The detailed work to be performed by Employer or
Contractor shall be as follows:
Design X
Fabrication & Manufacture per Specifications X
Shop Tests X
Packing and Delivery to Port of Loading X
Delivery from Port of Entry to Site or REG stockyard X
Unloading X
45
Storage, Moving X
Checking all parts at Site or REG Stockyard * X X
Unpacking (at Site) X
Connection Bolts, Nuts & Washers X
Anchor Bolts, Palnuts X
Base Plates X
Climbing Ladders X
Ground Wire Crossarm (w/ Hoisting Lugs) X
Steel Pole Sections X
Ground Wire Lugs X
Touch-Up Paint/Galvanizing X
Spare Bolts, Nuts, Washers and Palnuts X
Anchor Setting Templates X
Markings/Numerals X
Field Testing * X X
Installation/Erection X X
Quality Assurance Control X X
The services of a competent field service engineer or
(is, is not)
technician is required under this contract.

45
Note: To be witnessed by both Employer and Contractor or their representatives.

Date
30 kV Distribution Feeder lines from 110/30kV Nyabihu Substation
Vol V: Technical Specifications
Page2 of 7

Employer's Contractor's
SN STEEL TOWERS UNIT
Requirement Data
46
2. TECHNICAL DATA
2.1 Site Conditions and Environment
The expected environmental and meteorological
conditions for the location of the Steel Tower installation
2.1.1
are same as related in 2.1 (T-S-12-01 Technical
Schedules / GeneralDesign Criteria)
2.2 Quantities
The quantities of conductors and its accessories required
2.2.1 under thiscontract are indicated in the Schedule of
Quantities
2.3 Technical Characteristics and Requirements
The Employer requirements are indicated below. The
Contractor shall indicate his data corresponding to the
2.3.1
said Employer's requirements to facilitate evaluation and
to compare Contractor's compliance to the specification.
2.3.2 Steel Tower/Pole Technical Features and Characteristics
2.3.2.1 Type (Specify single or double circuit tower) Single
2.3.2.2 Type/size of conductors applied ACSR 120/20
2.3.2.3 No. of conductors applied per phase One (1)
2.3.2.4 No./Type/size of overhead earth wire applied NA
2.3.2.5 No./Type/size of overhead optical earth wire applied One (1)
2.3.2.6 If optical earth wire specify weight (kg) -
2.3.3 Applicable standards used -
Structural grade of steel used for structural members
2.3.3.1 -
(grade ASTMA36, ASTM A572, high strength steel)
2.3.3.2 If other than ASTM standard, specify yield point value -
Provided with the following applicable accessories (Yes,
2.3.4
No)
2.3.4.1 Insulator attachment Yes
2.3.4.2 OPGW attachments Yes
2.3.4.3 Step bolts Yes
2.3.4.4 Foundation setting templates (for towers) Yes
2.3.4.5 Open holes for installation of danger plates & helicopter
Yes
patrol number (Yes, No)
2.3.4.6 Anti Climbing device Yes
2.3.4.7 Anti theft bolts to level above ground (m) 4m
2.3.4.8 Guarding device against birds (Yes/No) Yes
2.3.4.9 Structural steel shall be galvanized (Yes, No) Yes
Note: Contractor shall coordinate with manufacturer of
OPGW, all data/parameters necessary in his design of
steel towers
2.3.5 Steel Towers Design, Wind and Weight Spans
2.3.5.1 Tower Type A Suspension
2.3.5.1.1 Angle of Deviation 0 degrees
2.3.5.1.2 Basic Span 300m

46
Note: The Tenderer is required to provide all the information required under the column "Contractor's Data".
nternational standard.

Date
30 kV Distribution Feeder lines from 110/30kV Nyabihu Substation
Vol V: Technical Specifications
Page3 of 7

Employer's Contractor's
SN STEEL TOWERS UNIT
Requirement Data
2.3.5.1.3 Wind Span 300 m
2.3.5.1.4 Weight Span max 450 m
2.3.5.1.5 Weight Span min 25 m
2.3.5.2 Tower Type TA1 Tension
2.3.5.2.1 Angle of Deviation 0 - 40 degrees
2.3.5.2.2 Basic Span 300m
2.3.5.2.3 Wind Span 300 m
2.3.5.2.4 Weight Span max 450m
2.3.5.2.5 Weight Span min -350 m
2.3.5.3 Tower Type TDead end& Terminal
2.3.5.3.1 Section/ Terminal 90 degrees
2.3.5.3.2 Basic Span 300m
2.3.5.3.3 Wind Span 300 m
2.3.5.3.4 Weight Span max 550 m
2.3.5.3.5 Weight Span min -550 m
2.3.5.4 Tower Type A SpecialSuspension (Long span)
2.3.5.4.1 Angle of Deviation 0 degrees
2.3.5.4.2 Basic Span 450m
2.3.5.4.3 Wind Span 450 m
2.3.5.4.4 Weight Span max 675 m
2.3.5.4.5 Weight Span min 25 m
2.3.5.5 Tower Type TA1 Special Tension
2.3.5.5.1 Angle of Deviation 0 - 40 degrees
2.3.5.5.2 Basic Span 700m
2.3.5.5.3 Wind Span 700 m
2.3.5.5.4 Weight Span max 1050 m
2.3.5.5.5 Weight Span min -550 m
Note 1: Minimum weight spans to be calculated according
to appurtenant loading conditions and clearance
requirements.
Note 2: TowersTA1 & TA1 Special are also to be
designed considering the tower in uplift situations with a
negative weight span of respectively 350 m& 550m.
Note 3: Stated Wind - and Weight spans at maximum
deviation angle

Tests and Experience Requirements


Test Requirements
Mechanical test on the material used required (Yes, No) Yes
Mill Certificate required (Yes, No) Yes
Galvanizing test to be performed (Yes, No) Yes
Embrittlement tests required (Yes, No) Yes
Trial assembly of prototype structure required in the
presence of
Yes
Full Scale Tower Test required (Yes, No) Yes

Date
30 kV Distribution Feeder lines from 110/30kV Nyabihu Substation
Vol V: Technical Specifications
Page4 of 7

Employer's Contractor's
SN STEEL TOWERS UNIT
Requirement Data
If Yes, specify tower type(s) MAL and MBL
Three
Additional Tests
If additional tests are required, these shall be as follows:

Material and
The manufacturer should have been in the business of
manufacturing distribution line towers for a rated voltage 10
of 30 kV and above for not less than : (years)
The material offered should have been in the actual
service for not less than: (years) NA

Submittals
Contractor shall answer Yes, if documents are submitted
with his proposal. If yes, indicate what portion of the
document proposed, i. e. page no., volume no., etc.
Preliminary structural design showing analysis and
Yes
calculation of pole design (Yes, No)

Computerized input data and output results (Yes, No) Yes


Tower design diagrams showing dimension, nodes and
coordinates (Yes, No) Yes
Properties of Structural Steel used if other than NPC
specified standard (Yes, No) Yes
Preliminary design of foundation (Yes, No) Yes
Foundation loads showing assumptions (Yes, No) Yes
Clearance diagram drawn on the tower configuration Yes
Sag-tension computations for the conductors used Yes
Proposed time bar schedule to meet submission of
drawings, delivery, installation and commissioning Yes
schedules (Yes, No)
Certified Design Test Reports Yes
Reference Lists Yes
QA Program and ISO 9001 Certification or 9002 as
Yes
appropriate.
All other data requested in the Specifications Yes
Shipping and Packing
Shipping Limitations
Packing
Each crate, box or package must have a packing list and
in addition to the usual and customary marks, the
following identifying marks shall be included:
1. Rwanda Energy Group(REG)
2. Project ID ("Name of line")
3. Destination
4. Case No.
5. Gross Weight (kg)
6. Net Weight (kg)
7. Dimension (L x W x H)
Also in addition to the usual packaging of towers and its

Date
30 kV Distribution Feeder lines from 110/30kV Nyabihu Substation
Vol V: Technical Specifications
Page5 of 7

Employer's Contractor's
SN STEEL TOWERS UNIT
Requirement Data
components, towers shall be neatly placed and arranged
inside an open top returnable steel container. This will
prevent towers and its components from any losses due
to pilferage and/or being misplaced during transhipment,
loading and unloading at the port of entry and
transporting to its final destination. The steel container
shall be returned back to the port of shipment by the
Contractor at no extra cost to the Employer. Cost of this
work to be done by the Contractor should be included in
the bid price of towers and its components.
Spares and Spare Parts
The Contractor shall provide spare towers for the Project.
It is understood that these spares will be used only by the
Employer incase of damage or failure outside the
warranty period. The Contractor therefore is obliged to
provide sufficient quantities as replacement for failures
during construction and the duration of the warranty
period. Spare steel towers are to be part of the supply as
indicated in the Schedule of Quantities.
Tools
No particular tools would be required for the supply of
Steel Towers

Date
30 kV Distribution Feeder lines from 110/30kV Nyabihu Substation
Vol V: Technical Specifications
Page6 of 7

Employer's Contractor's
SN STEEL TOWERS UNIT
Requirement Data
OTHER TECHNICAL DATA TO BE FIILED-IN BY THE
CONTRACTOR
The Contractor furnished data and information are
included in this Specification to indicate the guaranteed
performance data, predicted performance, interface
requirements and construction features of all Contractor
furnished equipment. The accuracy of such information
and the compatibility of such information with overall
performance requirements specified by the Employer are
the sole responsibility of the Contractor.
Environmental Considerations
In accordance with the Design Basis, the operating
environment for this installation
(will, will not) affect the life expectancy of the
components used in this equipment. If there be an effect,
the following components will be affected as follows:
Component: Effect:

Other Technical Data for the Steel Towers


Name of Manufacturer -
Country of Origin -
Guaranteed heights (mm) and weights (kg)
Tower Type A Suspension
Basic m 18.5
+2 m body extension m 20.5
+4 m body extension m 22.5
+6 m body extension m 24.5
Tower Type TA1 Tension
Basic m 16.3
+2 m body extension m 18.3
+4 m body extension m 20.3
+6 m body extension m 22.3
Tower Type T Tension & terminal
Basic m 16.3
+2 m body extension m 18.3
Tower Type A Special Suspension
Basic m 19.5
+2 m body extension m 21.5
+4 m body extension m 23.5
+6 m body extension m 25.5
Tower Type TA1 Special Tension
Basic m 19.5
+2 m body extension m 21.5
+4 m body extension m 23.5
+6 m body extension m 25.5

Date

Вам также может понравиться