No Drawing Date Types of work

New Scan Formatting


Gina ager
1 OFFICE SITE PLAN AND STORE 
2 PVC PIPE SHADE 
3 WATER SERVICE OFFICE 
4 SITE PLAN 
5 GENERAL PIPE LAYOUT 
6 GENERAL PIPE LAYOUT DETAIL 1 
7 GENERAL PIPE LAYOUT DETAIL 2 
8 GENERAL PIPE LAYOUT DETAIL 3 
9 GENERAL PIPE LAYOUT DETAIL 4 
10 WATER POINT PLAN AND SECTION 
11 WATER POINT FENCE AND PIPE SCHEMATIC 
12 GRAVITY MAIN LAYOUT 
13 RISING MAIN LAYOUT 
14 CROSSINGS, ANCHOR BLOCK, TRENCH WIDTH 
15 TYPICAL CROSSING SUPPORTS 
16 SINGLE AIR VALVE AND TYPICAL WASHOUT 
17 150m3/ CAPACITY COLLECTION CHAMBER 
PLAN AND SECTION

18 150m3/ CAPACITY COLLECTION CHAMBER 


REINFORCEMENT DETAIL

19 150m3/ CAPACITY COLLECTION CHAMBER 


SECTION AND DETAILS

20 COLLECTION CHAMBER AND PUMP HOUSE 


21 COLLECTION CHAMBER AND PUMP HOUSE 
22 PUMP STATION AND COLLECTION CHAMBER SITE 
PLAN
23 STANDARD GUARD HOUSE PLAN AND 
SECTION
24 100m3 RESERVIOR PLAN AND SECTION 
25 100m3 RESERVIOR REINFORCEMENT DETAIL 
26 100m3 RESERVIOR INLET, OUTLET, 
OVERFLOW & DRAIN
27 RESERVOIR LADDER DETAIL 
28 ERA STANDARD RC PIPE CULVERTS 
29 ERA STANDARD TYPICAL CROSS SECTIONS 
30 ERA STANDARD TRAFFIC SIGNS 
31 ERA STANDARD GUTTERS AND DITCHES 
32 SPRING CAPPING AT EGZIARAB 1 
33 SPRING CAPPING AT EGZIARAB 2 
Total 15 1 17
Koga Converted
1 Architectural Drawings 18
Total 18
Welmel Yadot Gadula irr. Proj.
1 GADULA PMU,ROADS ADN SETELLMENT LAYOUT 
2 GADULA PROJECT MANEGEMENT UNIT AND 
ACCESS ROAD LAYOUT
3 GADULA PROJECT MANEGEMENT UNIT SITE 
LAYOUT
4 WELMEL PMU,ROADS AND SETELLMENT LAYOUT 
5 WELMEL PROJECT MANEGEMENT UNIT AND 
ACCESS ROAD LAYOUT
6 WELMEL PROJECT MANEGEMENT UNIT SITE 
LAYOUT
7 YADOT PMU,ROADS ADN SETELLMENT LAYOUT 

8 YADOT PROJECT MANEGEMENT UNIT SITE 


LAYOUT
9 YADOT PROJECT MANEGEMENT UNIT SITE 
LAYOUT
Total 3 6
Circular Night Storage
1 Pipe and Road Layout 
2 80m3 RESERVIOR PLAN AND SECTION 
3 35m3 RESERVIOR PLAN AND SECTION 
Total 3