REQUIREMENTS Prior to online application PROCUREMENT/REMARKS


1. Geotagged photos of project site
In WGS84 format (deg-min-sec)
(taken for the last 30 days)
2. Topographic map of impact/affected areas (at least 1 km If in flat areas, vicinity map indicating the project location is
from the project site) required instead
3. Certification from LGU on the compatibility of proposed
project existing land use plan From LGU (CPDO/MPDO); must be commercial zoning
e.g. Zoning Certificate (commercial)
Must show the location of wastewater treatment facility,
4. Site Development (SDP) signed by registered professionals material recovery facility, hazardous waste storage, and
cistern tank (signed by a registered professional)
5. Project/Plant Layout signed by registered professionals Other items not shown in SDP
6. Schematic Diagram of Wastewater Treatment Facility
(WTF)
Specifications/Design should have:
By proponent
i. Daily Waste water flow rate
ii. Volume Capacity of WTF
iii. WTF Treatment Efficiency
By proponent; For genset (more on noise) must be enclosed
7. Schematic Diagram of Air Pollution Control Facility
and indicate that there is a muffler
8. Organizational Chart in charge on environmental
By proponent
concerns

9. Proof of Authority over the project site (land title, lease


contract, deed of absolute sale, etc) Land title
Other possible documents:

10. Others
A. Materials Recovery Facility (MRF) Design
Specifications: Used for solid waste management;
i. Daily solid waste generation By proponent
ii. Holding Tank for wastes
iii. Area of MRF
Used for rainwater catchment;
B. Cistern Tank Design
By proponent (or consultant)
Specifications:
CALCULATIONS NEEDED
i. Annual Rainfall Area
(available from Pag-Asa)
𝑽𝒐𝒍𝒖𝒎𝒆 = 𝑨𝒏𝒏𝒖𝒂𝒍 𝒓𝒂𝒊𝒏𝒇𝒂𝒍𝒍 𝒅𝒂𝒕𝒂 𝒙 𝑻𝒐𝒕𝒂𝒍 𝑹𝒐𝒐𝒇 𝑨𝒓𝒆𝒂 𝒙 𝟎. 𝟏𝟓
ii. Total Roof Area
iii. Cistern Tank Volume
*0.15 is a constant from the National Building Code
By proponent
11. Affidavit of No Complaint (can be a Barangay Resolution from LGU,
or notarized form from the proponent)

Note: Make sure that the gross floor area (GFA) does not exceed 5.0 hectares, otherwise, a more tedious process and
documentary requirement will have to be done in securing the ECC (full blown EIA is required). The cost that the proponent
must shoulder will be about 200,000-700,000.

GFA = land area + floor area above and below the ground floor