10. Others
A. Materials Recovery Facility (MRF) Design
Specifications: Used for solid waste management;
i. Daily solid waste generation By proponent
ii. Holding Tank for wastes
iii. Area of MRF
Used for rainwater catchment;
B. Cistern Tank Design
By proponent (or consultant)
Specifications:
CALCULATIONS NEEDED
i. Annual Rainfall Area
(available from Pag-Asa)
𝑽𝒐𝒍𝒖𝒎𝒆 = 𝑨𝒏𝒏𝒖𝒂𝒍 𝒓𝒂𝒊𝒏𝒇𝒂𝒍𝒍 𝒅𝒂𝒕𝒂 𝒙 𝑻𝒐𝒕𝒂𝒍 𝑹𝒐𝒐𝒇 𝑨𝒓𝒆𝒂 𝒙 𝟎. 𝟏𝟓
ii. Total Roof Area
iii. Cistern Tank Volume
*0.15 is a constant from the National Building Code
By proponent
11. Affidavit of No Complaint (can be a Barangay Resolution from LGU,
or notarized form from the proponent)
Note: Make sure that the gross floor area (GFA) does not exceed 5.0 hectares, otherwise, a more tedious process and
documentary requirement will have to be done in securing the ECC (full blown EIA is required). The cost that the proponent
must shoulder will be about 200,000-700,000.
GFA = land area + floor area above and below the ground floor