Tensioned Projects
Jamie McKenzie
• Definition
D fi iti off structure
t t performance
f
• Documentation status
• Coordination
• D i P
Design Program
• Certification
What aspects
p of the existing
g design
g
will the PT contractor
review/change?
i / h ?
• Depends
D d on ththe ttype off project
j t
• Ieff / Igross
g ((for buildings)
g )
• Concrete grade / volume / thickness
• R t i td
Restraint design
i
• Rebar content
Eureka Tower
• Conforming design
• Reinforced slabs
Eureka Tower
• Conforming design:
• PT Slab on Ground
• Only perimeter reinforcement
Tarago
g Water Tanks
• Non conforming design (steel)
• Material savings Steel Î Concrete
• Programme savings
• Driving force TIME & COST
PT in Buildings
g
• Builders & developers request for PT
alternative
• Save
• $
• Time
• Materials
Dam Walls
• P
Project
j t Engineers
E i tto coordinate
di t with
ith contractors
t t
• Involve a PT contactor early
y