Вы находитесь на странице: 1из 59

SPECIFICATION AND BILL OF QUANTITIES

FOR
B + G + 5 MIXED USE BUILDING

SUMMERY

SUPPER STRUCTURE
1. CONCRETE WORKS Birr 382,948.56
2. BLOCK WORKS Birr 176,343.04
3. ROOFING Birr 31,490.00
4. ALUMINUM WORKS Birr 3,676,896.20
5. FINISHING WORKS Birr 2,961,803.74
6. GLAZING Birr 250,935.20
7. PAINTING Birr 199,727.74
8.SANITARY INSTALLATION Birr 247,107.78
9.ELECTRICAL INSTALLATION Birr 1,016,985.00
10. LIFT INSTALLATION Birr 1,802,371.52

TOTAL Birr 10,363,660.22


CONTINGECY 10% Birr 1,036,366.02
VAT 15% Birr 1,710,003.94
GRAND TOTAL Birr 13,110,030.18
ARCHITECTURAL TAKEOFF SHEET
FOR Abenet residence
No Length Hight Total Remark No Length
block work
basement HCB plaster
200mm thick HCB
1 25.28 3 75.84 2 25.28
-1 1 2.2 -2.2 Door -2 1
-1 0.9 2.2 -1.98 Door -2 0.9
Total sum 71.66 m2
Total sum
No Length Hight Total Remark
basement No Length
10cm Gypsum wall
Gypsum plast
1 23.225 3 69.675
Total sum 69.68 m2 2 23.225
Total sum
No Length Hight Total Remark
block work
ground floor No Length
200mm thick HCB
1 41.902 3 125.706 rc. Element pla
-1 5.2 2.45 -12.74 window
1 57.13
-1 1.5 2.45 -3.675 window 7 11.578
-1 0.9 2.2 -1.98 Door -1 8.145
Total sum 107.31 m2 18 2.3
Total sum

No Length Hight Total Remark No Length


ground
150mm thick HCB HCB plaster

1 23.037 3 69.111 2 23.037


-4 0.9 2.2 -7.92 Door 2 5.2
-2 1 0.6 -1.2 window -2 1.5
-1 2.63 0.6 -1.578 window -2 0.9
6 1.162 0.8 5.5776
63.9906 m2 2 43.197
-8 0.9
-4 1
No Length Hight Total Remark -2 2.63
ground
10cm Gypsum wall

1 35.587 3 106.761 No Length


106.761 m2
Gypsum plast

2 35.587

No Length Hight Total Remark No Length


block work
first floor
200mm thick HCB HCB plaster
1 44.692 3 134.076 2 44.692
-1 5.2 2.45 -12.74 window -2 5.2
-2 1.5
-1 1.5 2.45 -3.675 window -2 0.9
-1 0.9 2.2 -1.98 Door 2 18.24
Total sum 115.68 m2 -8 0.9
-4 1
-2 2.63
No Length Hight Total Remark Total sum
first floor
150mm thick HCB
No Length
1 18.24 3 54.72
-4 0.9 2.2 -7.92 Door Gypsum plast
-2 1 0.6 -1.2 window
-1 2.63 0.6 -1.578 window
44.022 m2 2 47.29

No Length Hight Total Remark


first floor
10cm Gypsum wall

1 47.29 3 141.87
141.87 m2

No Length Hight Total Remark No Length


block work
second floor
200mm thick HCB HCB plaster
1 52.332 3 156.996 2 55.972
-1 5.2 2.45 -12.74 window -2 5.2
-2 1.5
-1 1.5 2.45 -3.675 window -2 0.9
-1 0.9 2.2 -1.98 Door 2 18.24
Total sum 138.60 m2 -8 0.9
-4 1
-2 2.63
No Length Hight Total Remark Total sum
second floor
150mm thick HCB
No Length
1 18.24 3 54.72
-4 0.9 2.2 -7.92 Door Gypsum plast
-2 1 0.6 -1.2 window
-1 2.63 0.6 -1.578 window
44.022 m2 2 39.809

No Length Hight Total Remark


second floor
10cm Gypsum wall

1 39.809 3 119.427
119.427 m2

No Length Hight Total Remark No Length


block work
third floor
200mm thick HCB HCB plaster
1 51.612 3 154.836 2 51.612
-1 5.2 2.45 -12.74 window -2 5.2

-1 1.5 2.45 -3.675 window -2 1.5


-1 0.9 2.2 -1.98 Door -2 0.9
Total sum 136.44 m2 2 20.51
-8 0.8
-4 1
No Length Hight Total Remark -2 1.8
third floor -2 2.63
150mm thick HCB Total sum
1 23.14 3 69.42
-4 0.8 2.2 -7.04 Doors
-2 1 0.6 -1.2 window
-1 1.8 2.2 -3.96 Door
-1 2.63 0.6 -1.578 window
55.642 m2
No Length Hight Total Remark No Length
block work
Fourth and Fifth floor Fourth and Fifth flo
200mm thick HCB HCB plaster
1 52.332 3 156.996 2 55.972
-1 5.2 2.45 -12.74 window -2 5.2

-1 1.5 2.45 -3.675 window -2 1.5


-1 0.9 2.2 -1.98 Door -2 0.9
Total sum 277.20 m2 4 15.61
-16 0.9
-8 1
No Length Hight Total Remark -4 2.63
Fourth and Fifth floor Total sum
150mm thick HCB
No Length
2 15.61 3 93.66 Fourth and Fifth flo
-8 0.9 2.2 -15.84 Door Gypsum plast
-4 1 0.6 -2.4 window
-2 2.63 0.6 -3.156 window
144.528 m2 2 39.809

No Length Hight Total Remark


Fourth and Fifth floor
10cm Gypsum wall

1 39.809 3 119.427
238.854 m2

No Length
plasterin
int &ext
1 2495.52
-1 121.41
-1 367.15
No Length Hight Total Remark No
basment
floor finish
Ceramic
1 19.30 1 19.3 store 1
1 7.50 1 7.5 shope
6 6.50 1 39 shope
1 9.00 1 9 shope
Total sum 74.80 m2

No Length Hight Total Remark


for all floor
floor finish
granite
6 2.23 1 13.38 landing
6 2.50 1 15 landing
Total sum 28.38 m2

No Length Hight Total Remark


for all floor
steps
granite
102 1.50 1 153 raiser
102 1.50 1 153 thread
Total sum 306.00 ml

No Length Hight Total Remark No


ground
floor finish
Ceramic
1 7.7 1 7.7 shop 1
2 8 1 16 shop
5 6 1 30 shop
1 6.2 1 6.2 shop
1 9.5 1 9.5 toilet
3 7 1 21 shop
3 7.5 1 22.5 shop
1 57 1 57 corridor
1 12 1 12 corridor
181.9 m2

No Length Hight Total Remark


ground
floor finish
marble
1 6.70 1 6.7 lobby
Total sum 6.70 m2

No Length Hight Total Remark


ground
floor finish
marble
6 4.90 1 29.4 raiser
6 4.90 1 29.4 thread
Total sum 58.80 ml

No Length Hight Total Remark No


first
floor finish
Ceramic
7 7 1 49 shop 1
4 7.5 1 30 shop 1
2 6 1 12 shop
2 8 1 16 shop
1 6.7 1 6.7 shop
1 5.6 1 5.6 shop
1 9.5 1 9.5 toilet
1 48.7 1 48.7 corridor
1 15.6 1 15.6 corridor
193.1 m2

No Length Hight Total Remark No


for 2nd, 4th,5th floor, for 2
floor finish
Ceramic
7 7 1 49 shop 1
4 7.5 1 30 shop 1
2 6 1 12 shop
2 8 1 16 shop for 2nd, 4th,5th floo
1 3.2 1 3.2 corridor
1 5.6 1 5.6 shop
1 9.5 1 9.5 toilet
1 48.7 1 48.7 corridor
1 15.6 1 15.6 corridor
189.6 m2
for 2nd, 4th,5th floor, 568.8 m2
No Length Hight Total Remark No
third floor
floor finish
Ceramic
1 177.6 1 177.6 resturant 1
1 12.6 1 12.6 store
1 9.5 1 9.5 toilet
199.7 m2

No Length Hight Total Remark


all floor
wall finish
Ceramic
6 13.49 1.5 121.41
121.41 m2

No Length Hight Total Remark


all floor
for toilet & retaining wall
WATER PROOFING
6 9.5 1 57 resturant
1 27.22 3 81.66 retainig wall
138.66 m2
Hight Total Remark No Length Hight Total
basement basement
HCB plastering HCB plastering
Ceiling
3 151.68 1 79.53 1 79.53
2.2 -4.4 Door 1 193.33 1 193.33
2.2 -3.96 Door 1 197.83 1 197.83
1 388.66 1 388.66
Total sum 143.32 m2 1 201.93 1 201.93
1061.28
Hight Total Remark
basement
Gypsum plastering

3 139.35
Total sum 139.35 m2

Hight Total Remark


basement
rc. Element plastering

3 171.39
3 243.138 lift shaft
0.6 -4.887 window
1.5 62.1
Total sum 471.74 m2

Hight Total Remark


ground
HCB plastering

3 138.222
2.45 25.48 window
2.45 -7.35 window
2.2 -3.96 Door

3 259.182
2.2 -15.84 Door
0.6 -2.4 window
0.6 -3.156 window

390.178 m2

Hight Total Remark


ground
Gypsum plastering

3 213.522
213.522 m2

Hight Total Remark


block work
first floor
HCB plastering
3 268.152
2.45 -25.48 window
2.45 -7.35 window
2.2 -3.96 Door
3 109.44
2.2 -15.84 Door
0.6 -2.4 window
0.6 -3.156 window
Total sum 319.41 m2

Hight Total Remark


first floor
Gypsum plastering

3 283.74
283.74 m2

Hight Total Remark


block work
second floor
HCB plastering
3 335.832
2.45 -25.48 window
2.45 -7.35 window
2.2 -3.96 Door
3 109.44
2.2 -15.84 Door
0.6 -2.4 window
0.6 -3.156 window
Total sum 387.09 m2

Hight Total Remark


second floor
Gypsum plastering

3 238.854
238.854 m2

Hight Total Remark


block work
third floor
HCB plastering
3 309.672
2.45 -25.48 window

2.45 -7.35 window


2.2 -3.96 Door
3 123.06
2.2 -14.08 Doors
0.6 -2.4 window
2.2 -7.92 Door
0.6 -3.156 window
Total sum 368.39 m2
Hight Total Remark
block work
Fourth and Fifth floor
HCB plastering
3 335.832
2.45 -25.48 window

2.45 -7.35 window


2.2 -3.96 Door
3 187.32
2.2 -31.68 Door
0.6 -4.8 window
0.6 -6.312 window
Total sum 887.14 m2

Hight Total Remark


Fourth and Fifth floor
Gypsum plastering

3 238.854
477.708 m2

Hight Total Remark


all floor
plastering
int &ext
1 2495.516
1 -121.41
1 -367.15
2006.956 m2
Length Hight Total Remark
basement
skirting

98.035 1 98.035
196.07 ml

Length Hight Total Remark


ground
skirting

169.576 1 169.576
339.152 ml
Length Hight Total Remark
first
skirting

38.163 1 38.163
147.892 1 147.892
372.11 ml

Length Hight Total Remark


for 2nd, 4th,5th floor,
skirting

38.163 1 38.163
147.892 1 147.892
372.11 ml
for 2nd, 4th,5th floor, 1116.33 ml
Length Hight Total Remark
third floor
skirting

65.46 1 65.46
65.46 ml
Remark
stering
ing
basement
ground
first
2nd & 4th
3rd
m2
SUB - STRUCTURE
No of
Drg.No Location Ref No Dia Length No of bar member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20

Column 0.00 0.00


C-1 16 3.15 8 13 0.00 0.00 327.60
8 1.3 22 13 371.8 0.00 0.00 0.00
0 0.00 0.00 0.00
Beam 0 0.00 0.00 0.00
B-1 16 9.5 3 2 0 0.00 0.00 0.00 57.00
16 5.65 3 2 0 0.00 0.00 0.00 33.90
14 11.1 3 2 0 0.00 0.00 66.60
14 2.82 3 2 0 0.00 0.00 16.92
8 1.2 77 2 184.8 0.00 0.00 0.00
0 0.00 0.00 0.00
B-2 16 2.6 2 4 0 0.00 0.00 0.00 20.80
16 2.6 2 4 0 0.00 0.00 0.00 20.80
16 7.2 3 4 0 0.00 0.00 0.00 86.40
16 6.3 3 4 0 0.00 0.00 0.00 75.60
16 3 2 4 0 0.00 0.00 0.00 24.00
8 1.2 31 4 148.8 0.00 0.00 0.00
0 0.00 0.00 0.00
SLAB 0 0.00 0.00 0.00
Ground floor Axis A-B/1-6 10 17.28 27 2 0 933.12 0.00 0.00
10 8.38 101 2 0 1,692.76 0.00 0.00
0 0.00 0.00 0.00
Total Length 705.4 2,625.88 #REF! 83.52 646.10 0.00
Unit Wt.(kg/mL) 0.222 0.395 0.62 0.89 1.21 1.58 2.47
Total Weight 0 278.633 1,620.17 #REF! 100.98 1,020.19 0.00
No of
Drg.No Location Ref No Dia Length No of bar member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20
concrete work

No Length Width Height Total Remark


13 0.3 0.3 3.15 3.6855 column m3
2 15 0.3 0.4 3.6 beam m3
4 5.2 0.3 0.4 2.496 beam m3
1 15.2 5.4 1 82.08 slab m2
10 m3
slab 82 m2

form work

No Length Width Height Total Remark


13 1.2 1 3.15 49.14 column
4 15 1 0.4 24 beam
2 15 0.3 1 9 beam
8 5.2 1 0.4 16.64 beam
4 5.2 0.3 1 6.24 beam
1 15.2 5.4 1 82.08 slab
187 m2

No of
Drg.No Location Ref No Dia Length No of bar member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20

20 3.70 12 6 0.00 0.00 0.00 266.40


16 3.70 48 6 0.00 1,065.60
10 6.07 16 12 1,165.82

0.00
Total Length #REF! 1,165.82 #REF! #REF! 1,065.60 266.40
Unit Wt.(kg/mL) 0.222 0.395 0.62 0.89 1.21 1.58 2.47
Total Weight 0 #REF! 719.31 #REF! #REF! 1,682.58 657.21
No of
Drg.No Location Ref No Dia Length No of bar member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20
37.75 37.75 37.75

BIRR 27,154.08 63,517.49 24,809.63

concrete work

Length Width Height width Total Remark


1 6.07 18 0.15 16.3944 shear wall
16 m3
2500
form work 40,986.00 birr

Length Width Height Total Remark


2 6.07 18 218.592 shear wall
219 m2
210.00
45,904.32 birr

total birr 202,371.52


Dia24

0
3.552
0
Dia24

Dia24

0
3.552
0
No Length Hight Total Remark
all floor
hand rail

7 3.02 1 21.14 around lift shaft


6 4.6 1 27.6 axis 2 & 3
5 2 1 10 b/n axis B-C
58.74 ml

No Length Hight Total Remark No Length Hight


all floor all floor
Window lintel

1 5.1 2 W-1 1 5.1 2


4 5.1 2.7 W-2 4 5.1 2.7
1 4.3 2 W-3 1 4.3 2
4 4.3 2.7 W-4 4 4.3 2.7
5 1.46 3 W-5 5 1.46 3
1 1.46 2 W-6 1 1.46 2
4 2 1.5 W-7 4 2 1.5
6 1.2 3 W-8 6 1.2 3
7 2.63 0.8 W-9 7 2.63 0.8
12 1 3 W-10 12 1 3
1 1 0.6 W-11 1 1 0.6
1 13.2 0.8 W-12 1 13.2 0.8

No Length Hight Total Remark No Length Hight


all floor all floor
Door lintel

27 0.9 2.2 D-1 27 0.9 2.2


1 2 2.5 D-2 1 2 2.5
1 1.8 2.2 D-3 1 1.8 2.2

No Length Hight Total Remark


all floor
glazing

1 5.1 2 10.2 W-1


4 5.1 2.7 55.08 W-2
1 4.3 2 8.6 W-3
4 4.3 2.7 46.44 W-4
5 1.46 3 21.9 W-5
1 1.46 2 2.92 W-6
4 2 1.5 12 W-7
6 1.2 3 21.6 W-8
7 2.63 0.8 14.728 W-9
12 1 3 36 W-10
1 1 0.6 0.6 W-11
1 13.2 0.8 10.56 W-12
240.628 m2

No Length Hight Total Remark


all floor
Door
glazing
27 0.9 2.2 26.73 D-1
1 2 2.5 2.5 D-2
1 1.8 2.2 1.98 D-3
31.21 m2

No Length Hight Total Remark No Length Hight


all floor all floor
for curtain wall Aluminum work
glazing alumimum partition
1 17.8 3 53.4 basement 1 44.27 3
1 12.675 3 38.025 ground 1 54.425 3
1 11.3 3 33.9 first floor 3 54.425 3
3 11.3 3 101.7 2nd,4th&5th 1 9.75 3
1 11.3 3 33.9 3rd floor
260.925 m2

No Length Hight
No Length Hight Total Remark all floor
all floor Aluminum cladding
roofing alumimum partition
1 230.1 1 230.1 1 112.33 1
230.1 m2 1 80.62 1
1 90.6 1
No Length Hight Total Remark 1 83.6 1
all floor
for curtain wall
glazing
1 111.2 1 111.2 right elevation
1 71.2 1 71.2 rare elevation
1 173.1 1 173.1 front elevation
355.5 m2
Total Remark
all floor
lintel

5.1 W-1
20.4 W-2
4.3 W-3
17.2 W-4
7.3 W-5
1.46 W-6
8 W-7
7.2 W-8
18.41 W-9
12 W-10
1 W-11
13.2 W-12
115.57 ml

Total Remark
all floor
lintel

24.3 D-1
2 D-2
1.8 D-3
28.1 ml
Total Remark
all floor
Aluminum work
lumimum partition
132.81 ground
163.275 first floor
489.825 2nd,4th&5th
29.25 3rd floor

815.16 m2

Total Remark
all floor
luminum cladding
lumimum partition
112.33 right elevation
80.62 rare elevation
90.6 front elevation
83.6 left elevation
367.15 m2
Item
No. Description Unit Qty. Rate

1. CONCRETE WORKS
Reinforced concrete in C-25, using 360kg
cement/m³ for OPC as per mix design
1.1 instruction , filled into formworks and
vibrated around rod reinforcement. Steel
and formworks measured separately.
a) Elevation Column m³ 3.6855 2500
b) floor beam m³ 6.096 2500
c) 180mm slab m2 82.08 2500
Provide, cut and fix in position sawn zigba
1.2 or steel or the combination of both
formworks to:-
a) Elevation Column m2 49.14 210
b) roof beam m 2
55.88 210
c) 180mm slab m2 82.08 210
fyk = 400mpa, Steel reinforcement
according to drawing. Price includes
1.3
cutting, bending, placing in position and
tying wires.
a) Dia. 8mm. deformed bar. kg 278.633 37.75
b) Dia. 10mm. ditto. kg 1620.168 37.75
c) Dia. 12mm. ditto. kg 0 37.75
c) Dia. 14mm. ditto. kg 100.9757 37.75
d) Dia. 16mm. ditto. kg 1020.192 37.75

TOTAL CARRIED TO SUMMARY ...................................................


2. BLOCK WORK

200mm thick HCB external and internal


wall bedded in cement sand mortar mix
2.10 m2 846.90 150.00
(1:4) ratio. Price shall include all the
necessary civil assistant works.

2.20 Ditto but 150mm thick m2 352.20 140.00

TOTAL CARRIED TO SUMMARY ...................................................

3. ROOFING
3.1 Roof cover in G-30 CIS fixed to zigba
purlin with dome headed galvanized nail
and washers. Purlin at c/c 90 cm
measured separetly and roof cover
measured in horizontal projection.
m² 134.00 235.00
TOTAL CARRIED TO SUMMARY ...................................................
4. ALUMINUM WORKS
Doors & Windows are manufactured from
best quality 1.8mm thick wooden color
Aluminum profile, as per the consultant
approval and window door schedule. Unit
price shall include door stopper, 5mm thick
tinted glazing, hinges, best quality ASSA -
ABLOY or equivalent lock with handle, and
all other necessary accessories.

4.1 WINDOW
a) Type -W1 Window size 510 x 200cm pcs 1.00 24480.00
b) Type-W2 Window size 510 x 270cm pcs 4.00 33048.00
c) Type -W3 window size 430 x200cm pcs 1.00 20640.00
d) Type -W4 window size 430x 270cm pcs 12.00 27864.00
e) Type-W5 window size 146x 300cm pcs 5.00 10512.00
f) Type -W6 window size 146x 200cm pcs 1.00 7008.00
g) Type -W7 window size 200x 150cm pcs 4.00 7200.00
h) Type -W8 window size 120x 300cm pcs 6.00 8640.00
i) Type -W9 window size 263x 80cm pcs 7.00 5049.60
j) Type -W10 window size 100x 300cm pcs 12.00 7200.00
k) Type -W11 window size 100x 60cm pcs 1.00 1440.00
l) Type -W12 window size 1320x 80cm pcs 1.00 25344.00

4.2 DOOR
a) Type -D1 Door size 90x 220cm pcs 27.00 4752.00
a) Type -D2 Door size 200x 250cm pcs 1.00 12000.00
a) Type -D3 Door size 180x 220cm pcs 1.00 9504.00

4.3 Supply and fix Almunium cladding as per m2


the detailed drawing. Price includes all 367.15
accessories. 1700.00
4.4 Supply and fix Almunium partition wall m2
for internal wall as per the detailed 815.16
drawing. Price includes all accessories. 2500.00
4.5 Supply and fix Almunium hand rail and
vertical frames with 10mm structural clear
glass to stair steps all according to the ml 58.74
detailed drawing. Price includes all
accessories. 1100.00

TOTAL CARRIED TO SUMMARY ...................................................


5. FINISHING WORKS
Finishing work shall include all surface
pre-cleaning , preparation application of
the finishing ,cleaning and polishing at the
end of the finishing works.

5.10 Apply three coats of plastering in cement


mortar (1:3). Price shall include pre-
cleaning and preparation of the surface.

a) To internal and external HCB wall m2 2,006.96 135


b) To shear wall & stair cases m2 471.74 135
c) To concrete ceilings m2
1,061.28 135
Ditto but two coats to receive ceramic 2
m
wall tiles 121.41 135
5.20 Apply gypsum plastering to all internal m²
wall. 1353.17 45
5.3 Non skide ceramic wall tile stuck to all m²
bath room walls using cement sand mortar
1:1 mix to a full floor high level . Price shall
includes filler & polishing the surface from
any dirt's. The material color , size & type
shall be approved by the consultant before
preceding a works.
121.41 350
5.4 Supply & fix non-slippery high end m²
ceramic floor tile fixed to bathroom &
kitchen floor using cement sand mortar 1:3
mix. Price shall includes appropriate
waterproof filler & polishing of the surface
from any dirt's. The material color , size &
type shall be approved by the consultant
before preceding a works.

1218.30 650
5.5 Supply and lay Marble tile flooring. The m²
pattern of the tile and the entire work shall
be approved by the engineer. Price shall
include cement mortar (1:3) bed and
grouting. 6.70 1100.00
5.6 Supply and lay 8x80 mm heavy duty ml
ceramic skirting. Price shall include mortar
backing. 972.79 230.00
5.7 supply and fix C-20 lintel. Price shall ml
include formwork and reinforcement.
143.67 360.00
5.8 supply and fix marble trushold for doors ml
28.10 600.00
5.9 Supply and fix marble window cill ml 115.57 600.00
5.1 Granite slab steps thread & riser
bedded in cement mortar 1:3
a) Thread, ml 153.00 600.00
b) Riser, ml 153.00 600.00
c) landing m² 28.38 1100.00
5.11 Marble slab steps thread & riser bedded
in cement mortar 1:3
a) Thread, ml 29.40 700.00
b) Riser, ml 29.40 700.00
5.12 Supply and construct 10cm thick Gypsum m²
board wall partition for Internal walls .
676.59 1400.00

TOTAL CARRIED TO SUMMARY ...................................................

6. GLAZING
6.10
Supply and fix 4 mm thick clear glass.
Price shall include approved quality putty.
m² 271.84 400.00
6.20
Supply and fix 5 mm thick flamed glass for
curtain walls. Price shall include approved
quality putty.
m² 355.50 400.00
TOTAL CARRIED TO SUMMARY ...................................................

7. PAINTING
7.10 Apply three coats of plastic emulsion paint m²
to internal and external walls plastered wall
surface.
2,006.96 40.00
7.20 Ditto but to RC ceiling and soffits of m²
stair case 1,294.77 40.00
7.30 Ditto but to gypsum board m² 1,353.17 50.00
TOTAL CARRIED TO SUMMARY ...................................................

8.SANITARY INSTALLATION
11.1.1 Supply & install Polypropelene, PP-R
Pipes and Fittings, PN 20, for cold and
hot water distribtion to all sanitary
fixures according to the drawing
complete with the necessary pieces
such as tees, bends, unions, etc. The
unit price shall include all necessary
assistance to the installation works
such as supports for horizontal and
vertical pipes, chiseling of walls, slabs,
beams, floors, etc. and closing them
with concrete or cement mortar to
normal condition. The installation shall
be tested at a pressure of 10 kg/scm
at the expense of the contractor.
Diameter 20 mm m.l 102.00 85.00
11.1.2 Supply & fix Gate Valves on PP-R Pipe
lines
complete with PP- union, CP brass head /
hand wheel.
Diameter 20 mm No. 32.00 135.00
11.2.0 Supply and fix the following fixtures
according to detail drawing.All fixtures
which differs from that specified below is
subject to the owner's approval, based on
samples, catalogues and brochures
presented by the contractor....Unit Price
shall include all the necessary fixing
brackets or hooks and all assistance civil
works such as chiseling of walls, floors,
beams etc.
11.2.1 a) Hand wash basins( oval shape double
bowl)
i) Type : RAK
Model :
Approximate size : In the Catalogue
Colour : As per the Architect's
preference
Or Equivalent approved by the engineer No 12.00 4,800.00
11.2.2 Ditto item No 1.1 above but with single No
bowl 6.00 3,200.00
11.2.3 Supply and fix wash down water closets
made of white vitreous china with plastic
seat and cover including low flush cistern
Complete with all necessary accessories..
i) Type : RAK
Approximate size : In the Catalogue
Colour : As per the Architect's
preference
Or Equivalent approved by the engineer No 12.00 3,900.00
11.2.4 Supply and fix toilet paper holder made of No
white vitreous china with necessary
accessories. 12.00 180.00
11.2.5 Supply and fix crystal glass mirrors No
with copper back protection, size 500/400
mm including chrome plated brass mirror
clips with chrome plated screws . Price
shall also include approved quality shelves.
12.00 480.00
1.2.11 Supply and fix stainless steel sink with No
double bowl as where shown on the
drawing. Complete with chrome plated
chain, plug, chrome plated faucet, P-smell
trap and with all necessary accessories.
1.00 4,200.00
1.2.13 Supply and fix floorSize:-
gully 1500 x 600 mm
of approved No
quality, complete with P-smell trap and all
other necessary fittings & accessories. 13.00 690.00

1.2.14 Supply and fix floor approved


quality clean out as where shown on the
drawing price shall also include all the
necessary accessories.
Size:- Dia. 50 mm No 4.00 125.00
1.2.15 Supply and install vent caps
made of rigid uPVC PN6 to be connected to
the roof terminal of vent pipe as shown on
the riser diagram, complete with all the
necessary sealings,gaskets to roof water
proofing membrane including stainless
steel screws/as required and all other
accessories.
Dia 110mm ml 23.60 180.00
1.2.16 Supply ,install and commissioning
water meter of approved quality with gate
valves before and after water meter as
where shown on the drawing.
i) Dia. 25 mm No 1.00 2,500.00
11.3.1 Supply & install soil waste and vent
pipe in
horizontal branches and vertical stacks
made of
rigid plastic pipes (PVC) of approved
standard
including all ncessary fitting, such as
bends
Y.T clean outs, increasing and reducing
pieces
with tight joints as shown on the drawing.
All
horizontal branches shall be laid in
a slope of
2%. The unit price shall include all
necessary
masonry assistance such as
chiseling of walls.
slabs, beams floor etc. and closing them
with
concrete or cement mortar.
Diameter 50 mm m.l. 41.60 75.00
Diameter 110 mm m.l. 122.40 76.00
Diameter 160 mm m.l. 5.00 288.00
11.3.2 Supply and install diameter 80mm rigid PVC
down pipe secured to wall with pipe fixing
brackets
at 150cm interval roof draing strainers etc. m.l. 70.00 100.00
11.4.0 Roof Reservoir for Domestic Use
11.4.1 Supply install & commission fiberglass
or equivalent elivated water reserviors for
domestic water supply. Price shall include
all the necessary pipe connection and all
other accessories
Total Effective Volume= 3m3 No 2.00 7,500.00
11.4.2 25mm dia. Float valve No 1.00 250.00
11.4.3 Provide dia. 20mm PPR overflow pipe to ml
water tank. 6.00 105.00
11.4.4 Provide dia. 20mm PPR drain pipe to No
water tank. 2.00 105.00
Supply and fix bronze gate valves of
approved quality with adaptors and
necessary accessories.
i) On pipe inlet point to tank, dia.20mm. No 2.00 340.00
ii) On water distribution pipe after tank, No
dia.20mm 2.00 340.00
iii) On drain pipe of the tank, dia. 20mm No 2.00 340.00
11.5.0 7.2m3 Septic Tank
11.5.1 Supply and construct 7.2mcu
capacity Septic Tank in stone masonry
wall on 200mm thick bottom RC slab , and
200mm roof slab in R.Concrete as detailed
in the drawing complete with all inlet,
outlet and other pipe pieces shown in the
drawing.
.5.1.1 Earth Works (incl. 50cm warking space)
a/ Excavate for septic tank to depth of m3
1500mm
from natural ground level. 14.70 90.00
b/ Ditto, but exceeding 1500mm but not m3
exceeding 3000mm. 15.00 90.00
` c/ Ditto, but exceeding 3000mm but m 3

not exceeding 4500mm. 15.00 90.00


d/ Back fill round S.Tank from excavated m 3

material in 200mm compacted layer.


11.00 302.00
e/ Cart away surplus excavated material m3
to a distance not exceeding 2 km from site.
44.70 60.73
.5.1.2 Concrete Works Reinforced concrete class
C-25 with a minimum cement of
360kg/mcu of concrete placed and vibrated
around reinforcement are measured
separatey.
a/ 5cm thick lean concrete m2 9.00 32.00
b/ In 20mm cover slab m 2
7.00 460.00
c/ In 200mm bottom slab slab m2 7.00 460.00
d/ Size 75x75x8cm removable
manhole cover with handle. No. 1.00 350.00
.5.1.3 Reinforcement
Intermediate grade steel reinforcement
form all concrete works.
a/ Dia. 12 mm deformed bars. kg 89.00 37.75
.5.1.4 Form Work
Provide, cut and fix in position sawn zigba
form works for.
a/ Soffit form work for reinforced m2
concrete cover slab. 9.00 210.00
.5.1.5 Masonrt Work
a/ supply and construct 50cm thick wall m3
form hard and sound rachitic masonry
rock for all external walls. 12.00 1,600.00
11.6.0 Manhole
11.6.1 supply and fix diameter 600mm concrete No
manholes price shall include excavation
and all necessary works therto 2.00 800.00
TOTAL CARRIED TO SUMMARY ...................................................

9. ELECTRICAL INSTALLATION

Supply and install :-

1 Manhole and PVC Pipe

1.10 Manhole in bricks and with concrete base No


internally of 400x400x500mm including
concrete cover with lifting hole. 4.00 2,500.00

1.20 110 mm diameter. ml 60.00 75.00

1.30 25 mm diameter. ml 400.00 25.00

2 Low Voltage System Earth

2.10 20x2400mm earth rod. No 1.00 2,500.00

2.20 1x16sq mm bare copper earth conductor ml


from MSB transformer and generator
earthing terminals to earth rods in PVC
pipe 25mm diameter. 18.00 3,500.00

3 Low Voltage Switch Board

3.10 Main Switch Board MSB in sheet steel


enclosure, floor standing with lockable door
including bus bars of 125 Amp, 3 Phase
rating, neutral and earth bars, connection
terminals, complete and consisting of:-

1 pc 25A, MCB, 1 Phase


7 pc 25A, MCB, 3 Phase
2 pc 20A, MCB, 1 Phase
No 1.00 25,000.00

4 Distribution Boards
4.10 Flush mounting distribution Board, MLPP-
B with lockable door and including bus
bars of 25Amp/1Phase, all necessary fixing
and connecting accessories, complete and
consisting:-
3 pc 16A, MCB, 1 Phase
4 pc 10A, MCB, 1 Phase No 1.00 4,500.00

4.20 Flush mounting distribution Board, MLPP-


G with lockable door and including bus
bars of 25Amp/3Phase, all necessary fixing
and connecting accessories, complete and
consisting:-
5 pc 16A, MCB, 1 Phase
6 pc 10A, MCB, 1 Phase No 1.00 6,000.00

4.30 Flush mounting distribution Board, MLPP-


1, MLPP-2, MLPP-4, and MLPP-5 with
lockable door and including bus bars of
25Amp/3Phase, all necessary fixing and
connecting accessories, complete and
consisting:-
6 pc 16A, MCB, 1 Phase
6 pc 10A, MCB, 1 Phase No 4.00 6,500.00

4.40 Flush mounting distribution Board, MLPP-


3 with lockable door and including bus
bars of 25Amp/3Phase, all necessary fixing
and connecting accessories, complete and
consisting:-
3 pc 20A, MCB, 1 Phase
3 pc 16A, MCB, 1 Phase
3 pc 10A, MCB, 1 Phase No 1.00 5,000.00

5 Feeder Power Cables

Multi-core power cable copper conductor,


PVC/PVC, color coded, in CABLE SHAFT
and PVC conduits, connected and tested,
all as specified and as shown on drawings

CABLES
5.10 3x35/16+1x16mm sq. m 100.00 750.00

5.20 5x6mm sq. m 300.00 250.00


5.30 3x6mm sq. m 50.00 125.00

5.40 3x4mm sq. m 100.00 95.00

6 Light Points

6.10 Flush mounted light points fed through No


2
PVC insulated conductors of 2x2.5mm
inside PVC conduits of 13mm diameter,
including junction boxes with covers and
insulating screw cap connectors, complete
296.00 500.00

7 Flush Mounted Switches

7.10 Flush mounting single switch No 85.00 135.00

7.20 Flush mounting two way switch No 2.00 155.00

7.30 Flush mounting double switch No 24.00 150.00

7.40 Flush mounting intermidiate switch No 6.00 250.00

8 Flush Mounted Socket Outlet Points

8.10 16A/1P socket outlet points fed through No


PVC insulated conductors of 3x2.5mm2
inside PVC conduit of 16mm diameter including
junction boxes with covers and insulating screw
cap connectors.
210.00 600.00

8.20 20A/1P socket outlet points fed through No


PVC insulated conductors of 3x4mm inside2

PVC conduit of 16mm diameter including


junction boxes with covers and insulating screw
cap connectors.
3.00 600.00

9 Flush Mounted Socket Outlets

9.10 Flush mounting socket outlet of 16A No


1Phase. 210.00 150.00

9.20 Flush mounting socket outlet of 20A No


1Phase. 3.00 850.00
10 Telephone, and Tv System

10.10 Telephon, and Tv system only conduits of No


16mm diameter, pulling wire, boxes,
terminals all as shown on the drawings. 72.00 750.00

10.20 Flush mounting Tele, and Tv outlet No 72.00 250.00

11 Light Fittings and Lamps


Connected and tested including lamps
and accessories complete, all as specified or
described in lighting fittings schedule and
as shown on the drawings.

NOTE

I. Supply of all fittings are by the Client,


II. An average Unit price is considered for

cost estimation,
III. The price of all fittings under this item
to be
EXCLUDED in the contract agreement.

11.10 Lighting fittings and lamps complete


No 296.00 1,000.00

TOTAL CARRIED TO SUMMARY ...................................................

10 PASSENGER LIFT
A 480KG, 6persons Traction Passenger lift,
type OTIS, SCHNDLER, or equivalent, and
subject to the engineers/consultants
approval, custom made for the shaft size
approved by the architect. including all
structural (construction of shear
walls),mechanical and electrical accessories
to be supplied, erected and commissioned
by a nominated sub-contractor, with the
following minimum requirements

Stops:- 7
Operation:-full collective/duplex control

Entrance:-one side
Speed:-1.0m/s
Travel distance:- 21m
Power Supply:-380/221,50HZ
Drive:-VVVF variable voltage and
variable frequency control drive )
Cabin material:-wall,car and landing door
all stainless steel.
Floor cover:-lined with wear resistance
PVC,floor to floor height 3.2m
Lighting:-indirect fluorescent ligting
EMergency light:-battery operated
Car/Landing doors:- automatic telescopic
Power room:- at the top floor
Cabine display:-digital car position and
direction indicators
Over load indicators,light
and buzzer
Wait/Stop push button
Alarm button
Key out of service
Fan switch
Communication:-Interphone/Intercome
Bell push button for
EMergency
Arrival gong
Hand rail:-3sides surface
mirror:-3sides/half
Counter weight:-As per standard
Outer Displays:-Digital number car postion
and direction indicators all floors call panel
up and down
Ventilation:-Natural grill and fan
Guide rail:-Steel profile according to the
standard.
Wire Protection:- According to the
standard.
EMergency device:-Automatic emergency
rescue device when power fails included
wth approved type battery.
Price includes all scaffolding,painting and
other civil works.
Lift machine room provided
Power panel with all controls
Heat resistnt Power cables
Light points
Socket outlets
Shaft light
Provide approved lift shaft lighting with
control switch in machine room, as shown
on the drawing
Pit Socket
Provide one twin socket outlet connected to
16A/1ph /Icu=6KA,branch circuit
supplying no other socket outlet inside the
pit.(EBCS-10,1995 section 21.14.2.4)
To control the lift for upward and
downward movEMet
Counter weight option=Sefty gear on
counter LS 1 1,802,371.52
NOTE:- Regardless of provided
architectural, and associated civil works
shaft design, the cotractor should take, and
verify all the necessary measurement on
site before commencEMent of passanger lift
erection.
TOTAL CARRIED TO SUMMARY ...................................................
Amount

9213.75
15240
205200

10319.4
11734.8
17236.8

10518.39575
61161.34049
0
3811.83192
38512.244225

382,948.56

127,034.40

49,308.64

176,343.04

31,490.00
31,490.00
24,480.00
132,192.00
20,640.00
334,368.00
52,560.00
7,008.00
28,800.00
51,840.00
35,347.20
86,400.00
1,440.00
25,344.00

128,304.00
12,000.00
9,504.00
-

624,155.00

2,037,900.00

64,614.00

3,676,896.20
270,939.06
63,685.04
143,272.80

16,390.35

60,892.83

42,493.50

791,895.00
7,370.00

223,742.16

51,721.20

16,860.00
69,342.00

91,800.00
91,800.00
31,218.00

20,580.00
20,580.00

947,221.80

2,961,803.74

108,735.20

142,200.00
250,935.20

80,278.24

51,790.80
67,658.70
199,727.74
8,670.00

4,320.00

57,600.00

19,200.00
46,800.00

2,160.00

5,760.00

4,200.00

8,970.00

500.00

4,248.00

2,500.00
3,120.00
9,302.40
1,440.00

7,000.00

15,000.00
250.00

630.00

210.00

680.00

680.00
680.00
1,323.00

1,350.00

1,350.00

3,322.00

2,714.63

288.00
3,220.00
3,220.00

350.00

3,359.75

1,890.00

19,200.00

1,600.00
247,107.78

10,000.00

4,500.00

10,000.00

2,500.00

63,000.00

25,000.00
4,500.00

6,000.00

26,000.00

5,000.00

75,000.00

75,000.00
6,250.00

9,500.00

148,000.00

11,475.00

310.00

3,600.00

1,500.00

126,000.00

1,800.00

31,500.00

2,550.00
54,000.00

18,000.00

296,000.00

1,016,985.00
1,802,371.52

1,802,371.52
sanitary

No Length Hight Total Remark


all floor
Door

27 0.9 2.2 D-1


1 2 2.5 D-2
1 1.8 2.2 D-3

Вам также может понравиться