‘ConocoPhillips 2012 FEL-0 Projects Project # 3 (PWR - 810/091-11) - Increase Capacity & Reliability of DU-8059/8060, Estimate Basis Project Narative Summary ‘The purpose of this project isto increase the capacity and improve the reliability of the Crude Unit Debutanizer TopsReflux Pumps DU-8059 and DU-8060, These identical pumps operate one ata time and provide both the reflux and tops make fr the Debutanizer operation, Current capacity of each pump is approximately 4100 BPD. However, with rocent improvements in the Primary Tower operation, Crude rate has increased. The Primary Tops make can now outpace the capacity ofthe Crude Unit Debutanizer resulting in the unwanted diversion of some of the Primary Tops tothe Coker Debutanizer at high Crude rates, To completely eliminate this diversion of Primary Tops to the Coker requires a total capacity ofthe Debutanizer Tops/Reflux Pumps of about 7000 BPD. Additionally, these pumps experience poor reliability, are no longer manufactured and are difficult to service. ‘Maximum capacity for the existing pumps at end ofthe performance cuve is $280 BPD with AP of 265 psi (compared to 309 psi at design point capacity of 4100 BPD). To achieve the 7000 BPD capacity will definitly require replacement of the pumps. Replacement will also solve the reliability issue with the existing pumps For FEL-O itis assumed thatthe pumps will be replaced. The suction piping is also to be replaced (inrease by one pip size) as par of the pump replacements to minimize suction line pressure drop. uring the next phase of the project, the hydraulics cf the discharge Piping/efux piping should also be evaluated to see if t may need upsizing to reduce pressure drop and save on pup AP requirements Project Requirements Piping Requirements: ‘+ DU-8039/8060 Suction Piping (© 10” (o replace 8") — approximately 100°, Sch 40, CS, 150% © 8" (to replace 6") approximately 25°, Sch 40, CS, 150% Equipment Requirements: ‘Two new pumps to replace existing DU-8059/8060 to meet following neminal requirements Capacity, gpm 208 (7000 BPD) Rated Capacity, gpm 225 AP, psi 5310 (current pump valve) Fluid Conditions ‘Flowing Temp, °F 80 + .G.@PT 059 Calculated BHP 81 (at 50% eff of existing pumps) Calculated BHP 90 (350 psi AP, 50% eff) Ksadian vas Attachments ‘* P&ID C-410-Y-1081 Crude Distillation Unit DU-5 Debutanizer Overhead Condensers PAID C-410-Y-1030 Crude Distillation Unit DU- Debutanizer Plot Plan C-410-W-001 SH7 Carson Plant Crude Unit Plot Plan C-410-W-001 SH8 (DW-11133) Carson Plan Crude Unit (Upper Levels) XSadoian SUPERSEDES ORAWING OW-11048 & SUPERSEDES DRAWING DW-11047 conoaitatpe | y-iox0 va Labehimln FH BP Ore, imme = rd a ‘a Jam worse ee on ores mats sane ‘watts, © Qi ‘ R $80 4 # i juss DEQUTRNER agcum, sTaveTURE juste 4 aye SLEW LOOKING west DeBuTAMLZER Accu, sTAUCTURE, EL G4 A808 STE EQUIPMENT LOCATION PLAN DISTILLING UNIT No. 5 ENERGY CONS. MODIFICATIONS, i selet ries Tin

Вам также может понравиться