Diseñar la sarta de perforación considerando el punto neutro cuando este el 80 % de longitud del

porta mechas.
Datos del pozo: Datos del PM1:
1
Prof = 3250 m OD = 6 2
,,

1
ϕP = 8 2
,, ID = 2,,

Over Poll = 1000 lb Peso = 102.3 lb/ft


ρ p r u e b a = 10 lb/gal Cantidad = 6 piezas

ρl o d o = 8.8 lb/gal Datos del PM2:

1
WOB = 10 ton OD = 6 4
,,

∆P = 200 psi ID = 2,,


Profcasing = 2800 m Peso = 93.3 lb/ft
Datos de las Barras Pesadas:
OD = 5 ,,

ID = 3,,
Peso = 49.3 lb/ft
Cantidad = 24 piezas
Datos de la TP2:
1
OD = 4 2
,,

ID = 3.826,,
Peso = 16.6 lb/ft
Grado = S-135 (EIU)
Tool Joint
1
D=6 4
,,

3
d=2 4
,,

11
DTE = 4 16
,,
a) Calcular el número de porta mechas
ρl o d o WO B
BF = 1-( ) #PM =
65.4 W P M * L p i e z a * B F * 0.8

8.9 22046.2
BF = 1-( ) = 0.8639 #PM = = 10.39 >
65.4 102.3 * 30 * 0.8639* 0.8

6 piezas
WPM1, Real = Cantidad*LpIeza*WPM*BF
WPM1, Real = 6*30*102.3*0.8639 = 15907.855 lb/ft
%PM = WOB/ WPM1, Real = (22046.2/15907.855)*100
%PM = 138.587 %
Wnecesario = WOB/0.8
∆W = Wnecesario - Wreal
22046.2
∆W = - 15907.855 = 11649.895 lb/ft
0.8

W P M 2 ,  R e al
WPM2, Real = Cantidad*LpIeza*WPM2*BF → Cantidad =
Lpi e za * W P M 2* B F

11649.895   l b
Cantidad = = 4.81 → 5 piezas
30 * 93.3 * 0.8639

WPM2, Real = 5*30*93.3*0.8639 = 12090.2805 lb/ft


W OB
% PN =
W P M 1+W P M 2

22046.2
% PN = *100% = 78.74 %
15907.855  + 12090.2805    

b) Encontrar los pesos reales de la tubería

O D 2−I D 2
Wcuerpo TP2 = * 2748
1029.4
4.5, ,2−3.826 ,,2
Wcuerpo TP2 = * 2748 = 14.98 lb/ft
1029.4

W u p s et
Wajustado TP2 = Wcuerpo +
29.4

8.10
Wajustado TP2 = 14.98 + = 15.25 lb/ft
29.4

LTool Joint = 17 in

WTool Joint = 0.222*L*(D2- d2) + 0.167*(D3- D3T E ) – 0.501*d2*(D-DTE)

WTool Joint = 0.222*17*(6.252- 2.752) + 0.167*(6.253- 4.68753) – 0.501*2.752*(6.25-4.6875)


WTool Joint = 136.5320 lb/ft
L+2.253 * ( D−DT E )
Lajustada =
12

17+ 2.253* ( 6.25−4.6875 )


Lajustada = = 1.71 ft
12

W a j u s t a d a * 29.4+ W T o ol   J o i n t
WTotal aprox =
29.4 + La j u s t a d a

15.25 * 29.4+136.5320
WTotal aprox = = 18.8 lb/ft
29.4+1.71

c) Calcular la longitud admisible de la tubería de perforación


( T A d m T P 2 * 0.9 )−M O P W P M 1 * L P M 1 +W P M 2 * L P M 2 +W H W * LH W
LTP2 = −
W T P2* B F W T P2

( 330558* 0.9 )−100000 102.3 * 180+ 93.3 * 150+ 49.3* 720


LTP2 = −
18.8 * 0.8639 18.8

LTP2 = 11749.1025 ft