Академический Документы
Профессиональный Документы
Культура Документы
Resource Persons
Prof. Devdas Menon, Department of Civil Engineering,
IIT Madras.
Prof. A. Meher Prasad, Department of Civil Engineering,
IIT Madras. GFRG Hostel building under construction at
IIT Tirupati campus
Sri. P. Gopinathan, Director, RBS India.
R Sreedharan, Director, Terravision Consultants Ltd , Organised by :
Chennai
Organisers
Patron : Coordinator :
Prof. K N Satyanarayana Prof. A. Meher Prasad
Director Department of Civil Engineering
IIT Tirupati IIT Madras Indian Institute of Technology Indian Institute of Technology
Ph: (0877) 2500 337 Ph: (044) 2257 4260 Madras, Tirupati,
Tamil Nadu, India Andhra Pradesh, India
About the course Now, the technology has gained popular acceptance. Short – Term Course on
Glass Fibre Reinforced Gypsum (GFRG) panel is a relatively However, the success of the technology depends on DESIGN AND CONSTRUCTION OF GFRG
new building product, gaining popularity in the construction efficient and knowledgeable personnel who have sufficient BUILDINGS
sector across the globe, especially in India. These panels, exposure to GFRG building construction. This course aims
with the advantages of rapidity, sustainability and to train professionals with the details of design and June 18 – 20, 2018
affordability, have been identified as a potential solution to construction of GFRG buildings, including waterproofing REGISTRATION FORM
address the problem of housing shortage. treatment. The three day course also intends to provide
GFRG panels, infilled with reinforced concrete (RC), can be exposure to various activities involved in GFRG Name: …………………………………………………………………………...….
used in the construction of various structural members such construction, through a full day training in the ongoing Qualification: B. Arch B. Tech M. Tech
as walls, slabs, staircases, parapet walls, etc. The extensive construction of IIT Tirupati campus.
Specialisation: ..…………………………………………………………………
research works carried out at IIT Madras, has evaluated the Course Contents
structural performance of GFRG walls infilled with RC, Age: ..................... Gender: ……………………………....
General introduction on GFRG panels
GFRG-RC slabs & GFRG stilted construction as well as long Basic analysis and design details of GFRG structural Work Experience
term durability and sustainability of these building systems. elements (Wall, Slab etc.,) and building systems 1. Designation:……........................... Year(s): .................
Building Materials & Technology Promotion Council Details of GFRG construction 2. Designation:……........................... Year(s): .................
(BMTPC), with the support of IIT Madras, has already Preparatory works for GFRG building construction
Present Organisation: ……………………………………………………….
published ‘GFRG/Rapidwall Building Structural Design Details on construction tools & tackles,
Manual’, ‘Manual on Waterproofing of GFRG/Rapidwall professionals and manpower required Organisation Address: ………………………………………………………
Buildings’ and ‘Schedule of Items & Rate Analysis for GFRG Erection and concreting of GFRG wall panels ………………………………………………………………………………………….
construction’ to aid architects, structural engineers, Construction of GFRG – RC slabs
……………………………..…………………………PIN:…………………………
construction engineers and builders in the structural Finishing works
design, planning and estimation of GFRG buildings. In Dos and don’ts in construction Mobile:…………………………… Email: …………………………………….
addition, a Manual on method of construction, IS codes on Waterproofing of GFRG buildings Give details of previous work / learning experience on
Specification for GFRG panels and Design of GFRG buildings Training on GFRG construction in IIT Tirupati campus GFRG / prefabricated/ conventional building construction,
are under the final stage of approval. if any: ………………………………………………..…………………………..…
Course Objectives
GFRG building system and method of construction have …………………………………………………………………………………….……
To familiarise with the GFRG construction methodology
been adapted to suit the Indian conditions. So far, more …………………………………………………………………………………….……
with due focus on the difference from the conventional
than 800 GFRG buildings have been constructed in India,
construction. ………………………………………………………………………………….………
including 40 affordable housing units built by BMTPC,
To understand the sequence of construction and good ………………………………………………………………………………….………
Ministry of Housing and Urban Affairs at Nellore, Andhra
construction practices to be followed at site.
Pradesh. Currently, 5 hostel buildings of 4 to 5 storeys and
To ensure quality construction by moulding the aspiring
one residential apartment (1.4 lakh sq. ft built area) in IIT
engineers/supervisors specialising in GFRG
Tirupati Transit Campus are being constructed using GFRG Date Signature
construction.
panels.