D.M. CONSUNJI, INC.

DAILY CONSTRUCTION REPORT

PROJECT PASAY TRENCHLESS PIPELAYING


WEATHER

DATE April 21, 2018 2400 HRS

FAIR
DAY Saturday
CLOUDY
060 HRS
1600 HRS

RAINY

STORMY
1200 HRS

ACTIVITIES LOCATION QUANTITY REMARKS

A. ACTIVITIES

B. MANPOWER PHASE OF WORK

C. EQUIPMPENT PHASE OF WORK

D. PROBLEMS ENCOUNTERED

MANPOWER AND EQUIPMENT AT SITE SEE ATTACHMENT 1.0


MATERIAL DELIVERIES AT SITE SEE ATTACHMENT 2.0
PROBLEMS ENCOUNTERED AND SOLUTIONS TAKEN SEE ATTACHMENT 3.0

PREPARED BY: > CONCURRED BY:

Mar Bautista Celso Evangelista


Field Engineer PROJECT IN- CHARGE

APPROVED BY:

_______________________
CONSTRUCTION MANAGER

OP-C-071-0
D.M Consunji, Inc.
D.M. CONSUNJI, INC.
DAILY CONSTRUCTION REPORT

PROJECT PASAY TRENCHLESS PIPELAYING


WEATHER
DATE March 3, 2018 2400 HRS

FAIR
DAY Saturday
CLOUDY
060 HRS
1600 HRS

RAINY

STORMY
1200 HRS

ACTIVITIES LOCATION QUANTITY REMARKS

A. ACTIVITIES

1 Purlins Installation for Roof Trusses Temporary Facility 3m x 9m = 27 sq.m

2 Installation of Floor Joist Temporary Facility 3m x 9m = 27 sq.m

3 Test Pit Pit 3 3m x 9m = 27 sq.m

B. MANPOWER PHASE OF WORK

A 2 - Project in Charge Temfacil

1 - Project Super Intendent Temfacil

1 - Field Engineer Temfacil

1 - Surveyor Temfacil

6 - Carpenter Temfacil

2 - Mason Temfacil

5 - Labor Temfacil

2 - Welder Temfacil

1 - Backhoe Operator Temfacil

B 3 - Labor Pit 3

1 - Skidloader Operator Pit 3

C. EQUIPMPENT PHASE OF WORK

A 1 unit - Welding Machine Temfacil


1 unit - Backhoe

B 1 unit - Skidloader Pit 3


1 unit - Concrete Cutter
1 unit - Mini Dump Truck

D. PROBLEMS ENCOUNTERED

MANPOWER AND EQUIPMENT AT SITE SEE ATTACHMENT 1.0


MATERIAL DELIVERIES AT SITE Tramo SEE ATTACHMENT 2.0
PROBLEMS ENCOUNTERED AND SOLUTIONS TAKEN SEE ATTACHMENT 3.0

> CONCURRED BY:


PREPARED BY:
Celso Evangelista
Mar Bautista PROJECT IN- CHARGE
Field Engineer

APPROVED BY:

Noel Villanueva
CONSTRUCTION MANAGER

OP-C-071-0 D.M Consunji, Inc.