ESTADO FISICO-FINANCIERO DE OBRA EJECUTADA POR OLENNA EN EL NUEVO AEROPUERTO INTERNACIONAL DE LA CIUDAD DE MEXICO
10% POR ESTIMAR Y COBRAR 10% DE FONDO
LOSAS POR ESTIMACION ARMADO HABILITADO ESTIMADO ARMADO Y HABILITADO FACTURADO Y COBRADO
TOTAL POR FALTA DE REVISION DE GARANTIA
TOTAL TONELADAS
TOTAL
TONELADAS
TON PENDIENTES A TOTAL EJECUTADO ARMADO
ESTIMACION No. DE LOSA ARMADO ESTIMADO HABILITADO HABILITADO ESTIMADO IVA INCLUIDO TON IVA INCLUIDO TON IVA INCLUIDO ESTIMACION
EN ARMADO REVISION HABILITADO
TONELADAS 5,974.04 128.11 5,974.04 1,626.61 $ 11,110,891.31 $ 12,888,633.92 7,484.00 $11,599,770.53 128.11 $ 240,744.31 $ 1,288,863.39
TOTAL DE TONELADAS 6,102.15 1,626.62
P.U. $1,620.00 $880.94 COBRADO
TOTAL $9,885,483.70 $1,432,952.86 IMPORTE $ 9,999,802.18
IVA $1,581,677.39 $229,272.46 IVA $ 1,599,968.35
IMPORTE PARCIAL $11,467,161.09 $1,662,225.32 TOTAL CON IVA $ 11,599,770.53
IMPORTE TOTAL
$13,129,386.41
EJECUTADO IVA INCLUIDO
17 FALTA TERMINAR REVISION POR PARTE DE ICA POR COBRAR
73 REVISADAS AL 100% POR PARTE DE ICA IMPORTE $ 1,318,627.33
51 LOSAS COLADAS IVA $ 210,980.37
2 LOSAS EN PROCESO DE ARMADO TOTAL CON IVA $ 1,529,607.70