Вы находитесь на странице: 1из 15

1 2 3 4 5 6 7 8

© Copyright 2010 ABB. All rights reserved.

A A

Project Overview

B
Project name JIIPE Gardu C1-SafePlus +FFF+ B

Customer name Java Integrated Industrial and Port Estate (JIIPE)

Order Number 502020379


C C

Product SafePlus 12/24


Rated voltage 24kV
Normal voltage 20kV
Busbar rated current 630A
D D

Rated frequency 50Hz

Manufacturer address No.12 Jingyuan Street


Beijing Economic-Technological Development Area
E E
Beijing,100176,P.R.China
Telephone (8610) 6781 8000
Fax (8610) 6781 8004
F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. =
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 +
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name Project Overview
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page 1
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676 Pages 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2010 ABB. All rights reserved.

A Table of Contents A

Drawing Number Page Description Page Position Page NO. Pages


1 1YVS808676 Project Overview 1 1 2
2 1YVS808676 Table of contents 2 2 2
3 1YVS808676 Symbol Legend OVW-SLD-A1 A1 2
4 1YVS808676 Single Line Drawing OVW-SLD-A2 A2 2
5 1YVS808676 Front View Drawing OVW-FVD-A1 A1 3
6 1YVS808676 Side View Drawing Detail OVW-FVD-A2 A2 3
B B
7 1YVS808676 Side View Drawing Detail OVW-FVD-A3 A3 3
8 1YVS808676 Foundation Drawing OVW-FFD-A1 A1 1
9 1YVS808676-A01 F unit auxiliary contact MLD-A01-1 1 7
10 1YVS808676-A01 F unit open coil MLD-A01-2 2 7
11 1YVS808676-A01 F unit open coil MLD-A01-3 3 7
12 1YVS808676-A01 Device connection diagram MLD-A01-4 4 7
13 1YVS808676-A01 Terminal diagram MLD-A01-5 5 7
14 1YVS808676-A01 Terminal diagram MLD-A01-6 6 7
C C
15 1YVS808676-A01 Part list MLD-A01-7 7 7

D D

E E

F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. =
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 +
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name Table of contents
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page 2
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676 Pages 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2010 ABB. All rights reserved.

A A

Symbol Description

Circuit Breaker(CB)
B B

Disconnector Switch(DS)

Earthing Switch(ES)

Load Break Switch(LBS)

M Motor Operation
C C

Voltage Indicator

Relay Trip Coil

BR Protection Relay

Current Transformer

D Potential Transformer D

Potential Transformer fuse

External Bushing with Busbar

V Voltage Meter

Fuse
E E

F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = OVW
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + SLD
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name Symbol Legend
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page A1
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676 Pages 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2010 ABB. All rights reserved.

A A

Ir Limited by fuse Ir Limited by fuse Ir Limited by fuse


Isc 21kA Isc 21kA Isc 21kA

B B

10A 10A 10A

C C

D D

Unit A01 A02 A03


Panel Name F F F
Secondary Drawing 1 1YVS808676-A01 1YVS808676-A01 1YVS808676-A01
Nameplate INCOMING OUTGOING TO TRAFO OUTGOING(SPARE)

E E

F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = OVW
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + SLD
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name Single Line Drawing
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page A2
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676 Pages 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2010 ABB. All rights reserved.

A A

B O I O I O I B
1.45
bar
SF6

O I O I O I
1806

C C

D D

E E
1022

ABB-MVE data ABB-MVE data ABB-MVE data ABB-MVE data

A01 A02 A03


F PANEL NAME F F F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = OVW
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + FVD
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name Front View Drawing
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page A1
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676 Pages 3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2010 ABB. All rights reserved.

A A
751

B B

C C

1806
1641

260 1336

D D
595

E E

PANELS:
A01,A03

F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = OVW
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + FVD
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name Side View Drawing Detail
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page A2
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676 Pages 3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2010 ABB. All rights reserved.

A A
751

B B

C C

1806
260 1336

D D
595

E E

PANELS:
A02

F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = OVW
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + FVD
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name Side View Drawing Detail
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page A3
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676 Pages 3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2010 ABB. All rights reserved.

A A

B B
10# steel channel
ø 15
253.5

C C
751
30
253.5
107

D A D

E E

UNIT A B
1-WAY 297 371
2-WAY 622 696
3-WAY 947 1021
4-WAY 1272 1346
5-WAY 1597 1671
F 6-WAY 1922 1996 F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = OVW
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + FFD
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name Foundation Drawing
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page A1
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676 Pages 1
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2010 ABB. All rights reserved.
Single Line Diagram

A A

/2.5:C
/2.6:C

/2.6:C

/2.3:C
/2.7:C
1 3 1 3 1 3
Auxiliary Contact of LBS
-S7.1 2 4 -S7.2 2 4 -S7.3 2 4

B B

/3.4:C
/3.4:C

/3.5:C
/3.5:C
1 3 1 3
Auxiliary Contact of E.S.
-S10.1 2 4 -S10.2 2 4

A
-Y1
/2.3:D B
Open Coil

C C

/3.6:C
1 3
Auxiliary contact of Fuse blown
-S9 2 4

D D

E E

F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = MLD
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + A01
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name F unit auxiliary contact
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page 1
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676-A01 Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2010 ABB. All rights reserved. Open control Load Break Switch Status

A A
-X3 1 -X3 3 -X3 5 -X3 7

-F1
2 1
1A

-X1 63 -X1 62 -X1 61 -X3 41-X3 42

-X1 2 -X1 1 -X1 12 -X1 11


B 110V DC B

-X1 66 -X1 65 -X1 64 -X3 43-X3 44

-S7.3
/1.6:A 4
C C

1 3 1 3
-X1 27 -X3 25
-S7.1 -S7.1 -S7.2 -S7.2
/1.6:A /1.6:A /1.6:A /1.6:A
2 4 2 4
Remote signal
-X1 57 -X3 26
X4:A

D D

A
-Y1
B

-X1 32 -X1 31 -X1 42 -X1 41


X4:B

E E

-X3 2 -X3 4 -X3 6 -X3 8

F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = MLD
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + A01
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name F unit open coil
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page 2
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676-A01 Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2010 ABB. All rights reserved. Earthing Switch Status Fuse Status

A A
-X3 9 -X3 11 -X3 13 -X3 15 -X3 17

-X1 4 -X1 3 -X1 14 -X1 13 -X1 28


B B

C C

1 3 1 3 3
-S10.1 -S10.1 -S10.2 -S10.2 -S9
/1.6:B /1.6:B /1.6:B /1.6:B /1.6:D
2 4 2 4 4

D D

-X1 34 -X1 33 -X1 44 -X1 43 -X1 58

E E

-X3 10 -X3 12 -X3 14 -X3 16 -X3 18

F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = MLD
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + A01
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name F unit open coil
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page 3
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676-A01 Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Device Connection Diagram


© Copyright 2010 ABB. All rights reserved.

A A
-F1 -S10.1
2 -Y1:X4:B 2 -X1:34
1 -X1:63 3 -X1:3
4 -X1:33

-S7.1
1 -X1:2 -S10.2
2 -X1:32 1 -X1:14
B B
3 -X1:1 2 -X1:44
4 -X1:31 3 -X1:13
4 -X1:43

-S7.2
1 -X1:12 -Y1
2 -X1:42 X4:A -X1:57
3 -X1:11 X4:B -F1:2
C C
4 -X1:41

-S7.3
1
2
3 -X1:66
4 -X1:27
D D

-S9
1
2
3 -X1:28
4 -X1:58

E E

-S10.1
1 -X1:4

F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = MLD
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + A01
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name Device connection diagram
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page 4
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676-A01 Pages 7
1 2 3 4 5 6 7 8
F
E
B

C
A

D
© Copyright 2010 ABB. All rights reserved.

B
A
C

Rev. Code
Terminal diagram Terminal Strip

1
1

=MLD+A01-X1

Date
2017.10.19
2017.10.30
2017.11.13
Terminal
Cable number External Target Brideg Bar Terminal Type Internal Target Cable number Terminal position
Number

Name
Leo
Leo
Leo
-X3:3 1 MA2.5/5 -S7.1:3 /2.6:B

-X3:1 2 MA2.5/5 -S7.1:1 /2.5:B

Customer
-X3:11 3 MA2.5/5 -S10.1:3 /3.4:B

Contract No.
-X3:9 4 MA2.5/5 -S10.1:1 /3.4:B

2
2

-X3:7 11 MA2.5/5 -S7.2:3 /2.7:B

-X3:5 12 MA2.5/5 -S7.2:1 /2.6:B

-X3:15 13 MA2.5/5 -S10.2:3 /3.5:B

-X3:13 14 MA2.5/5 -S10.2:1 /3.5:B

-X3:25 27 MA2.5/5 -S7.3:4 /2.3:C

-X3:17 28 MA2.5/5 -S9:3 /3.6:B

-X3:4 31 MA2.5/5 -S7.1:4 /2.6:E

Java Integrated Industrial and Port Estate (JIIPE)

3
3

-X3:2 32 MA2.5/5 -S7.1:2 /2.5:E

-X3:12 33 MA2.5/5 -S10.1:4 /3.4:E

-X3:10 34 MA2.5/5 -S10.1:2 /3.4:E

Checked
Prepared
-X3:8 41 MA2.5/5 -S7.2:4 /2.7:E

Project name
-X3:6 42 MA2.5/5 -S7.2:2 /2.6:E

-X3:16 43 MA2.5/5 -S10.2:4 /3.5:E

ZhiGang Liu
TingTing Long
-X3:14 44 MA2.5/5 -S10.2:2 /3.5:E

4
4

-X3:26 57 MA2.5/5 -Y1:X4:A /2.3:D

-X3:18 58 MA2.5/5 -S9:4 /3.6:E

Date
-X3:41 61 MA2.5/5 /2.3:B

Approved
62 MA2.5/5 /2.3:B

JIIPE Gardu C1-SafePlus +FFF+


63 MA2.5/5 -F1:1 /2.3:B

2017.9.26
-X3:43 64 MA2.5/5 /2.3:B

LiPing Chai
65 MA2.5/5 /2.3:B

66 MA2.5/5 -S7.3:3 /2.3:B

5
5

Title

Co.Ltd., Beijing
6
6

Terminal diagram
ABB High Voltage Switchgear
Doc. No.
Order No.

7
7

502020379

1YVS808676-A01
+
=
A01
MLD

8
8

Page
Pages
7
5
F
E
B

C
A

D
F
E
B

C
A

D
© Copyright 2010 ABB. All rights reserved.

B
A
C

Rev. Code
Terminal diagram Terminal Strip

1
1

=MLD+A01-X3

Date
2017.10.19
2017.10.30
2017.11.13
Terminal
Cable number External Target Brideg Bar Terminal Type Internal Target Cable number Terminal position
Number

Name
Leo
Leo
Leo
1 MA2.5/5 -X1:2 /2.5:A

2 MA2.5/5 -X1:32 /2.5:E

Customer
3 MA2.5/5 -X1:1 /2.6:A

Contract No.
4 MA2.5/5 -X1:31 /2.6:E

2
2

5 MA2.5/5 -X1:12 /2.6:A

6 MA2.5/5 -X1:42 /2.6:E

7 MA2.5/5 -X1:11 /2.7:A

8 MA2.5/5 -X1:41 /2.7:E

9 MA2.5/5 -X1:4 /3.4:A

10 MA2.5/5 -X1:34 /3.4:E

11 MA2.5/5 -X1:3 /3.4:A

Java Integrated Industrial and Port Estate (JIIPE)

3
3

12 MA2.5/5 -X1:33 /3.4:E

13 MA2.5/5 -X1:14 /3.5:A

14 MA2.5/5 -X1:44 /3.5:E

Checked
Prepared
15 MA2.5/5 -X1:13 /3.5:A

Project name
16 MA2.5/5 -X1:43 /3.5:E

17 MA2.5/5 -X1:28 /3.6:A

ZhiGang Liu
TingTing Long
18 MA2.5/5 -X1:58 /3.6:E

4
4

25 MA2.5/5 -X1:27 /2.3:C

26 MA2.5/5 -X1:57 /2.3:D

Date
41 MA2.5/5 -X1:61 /2.3:B

Approved
42 MA2.5/5 /2.3:B

JIIPE Gardu C1-SafePlus +FFF+


43 MA2.5/5 -X1:64 /2.3:B

2017.9.26
44 MA2.5/5 /2.3:B

LiPing Chai

5
5

Title

Co.Ltd., Beijing
6
6

Terminal diagram
ABB High Voltage Switchgear
Doc. No.
Order No.

7
7

502020379

1YVS808676-A01
+
=
A01
MLD

8
8

Page
Pages
7
6
F
E
B

C
A

D
1 2 3 4 5 6 7 8

Parts List
© Copyright 2010 ABB. All rights reserved.

A Name Description MFR. SAP type Position A


1 -F1 Fuse terminal ABB /2.2:A

2 -S7.1 Aux. contact ABB /1.6:A

3 -S7.2 Aux. contact ABB /1.6:A

4 -S7.3 Aux. contact ABB /1.6:A

5 -S9 Aux. contact ABB /1.6:D

6 -S10.1 Aux. contact ABB /1.6:B


B B

7 -S10.2 Aux. contact ABB /1.6:B

8 -Y1 Open coil ABB /2.3:D

C C

D D

E E

F F
Prepared ZhiGang Liu Date 2017.9.26 Title Order No. = MLD
C 2017.11.13 Leo Customer Checked TingTing Long Approved LiPing Chai 502020379 + A01
B 2017.10.30 Leo Java Integrated Industrial and Port Estate (JIIPE) Project name Part list
A 2017.10.19 Leo Contract No. JIIPE Gardu C1-SafePlus +FFF+ ABB High Voltage Switchgear Doc. No. Page 7
Rev. Code Date Name Co.Ltd., Beijing 1YVS808676-A01 Pages 7
1 2 3 4 5 6 7 8