OBSERVATION NOTE

Name of the work : Sewerage & Drainage Network in Vivekananda Road Catchment(Part of ward 113
& 114) in Borough XI Including Operation and Maintenance of the Pumping Station
Contract Package No : KEIIP/NCB/TR-2/SD-11/2015-16

Location : 1) CHAKDHA HIGH SCHOOL


2) PURBA ANANDA PALLY
ISSUE STATUS ACTION OUR REMARKS
CLARIFICATION
A) Camp Site Labor camp Overall Noted.
Management: at pirpukur housekeeping in
1)Proper Sanitation condition- has clean labor camp is
gender specific toilet toilet. Kitchen satisfactory,
2)Drainage and discharge into with need to be
neighboring areas LPG,separate maintained
3)Solid waste Management dinning
4)Drinking water management arrangements
5)Non-cutting of trees etc.They
6)Cooking area, mode of fuel depend upon
(LPG/Kerosene/Wooden boring water
Chullah) for drinking
purpose
B) PERSONNEL SAFETY Partial Need to be Helmets,
Use of ear plugs, nose Satisfactory. improved gumboots,
mask,helmet,gloves,gumboots, Often urgently reflector
Reflector jacket, safety belt etc workers are jackets have
at working site noted in bare been provided
feet, without to workers and
reflector labours are
jacket, using during
helmet work.

C) CONSTRUCTION Construction Need to be Effort has


WASTE waste (scrap arranged already made to
Removal/disposal of iron, wooden properly improve
overburden/surplus log) noted in housekeeping of
stack yard area
earth/stone , sludge materials/ scatter
and scattered
reuse in other projects. manner at material has
Disposal of hazardous waste to stack yard stacked properly.
reg.recycler without any The place is
demarcation demarcated
with caution
tape.
D) CONSTRUCTION Construction It should be Effort has
MATERIAL material placed in the made to stack
Whether stored under covered noted beside area without the material
condition, area demarcated / the road disturbing local properly.
no . Slope should be avoided neighborhood Construction
material has
been removed
from road side
and it will be
maintained in
future.
E) FUEL STORAGE Fuel storage Special care Effort has been
Separate storage of fuels and area has must be taken to made to stop
other flammable material. metal tray prevent oil the spillage of
Placement of fuels over tray beneath and spillage. oil.
concrete
flooring. Still
some
spillages
noticed
F) ACCESS TO Access to Need to be done Now the access
CAMP/WORK SITE labor camp is urgently of the site is
ok. While it is fully ok and we
required to will maintain.
be improved
in few of the
pipe laying
sites
G) CARRY OUT Monitoring Need to be done Environmental
ENVIRONMENTAL due in april urgently monitoring has
MONITORING (AIR, 2018 been done. We
WATER, NOISE) AS PER will submit the
SCHEDULE EMP(LAST report shortly.
DATE)
H) AWARENESS Health camp Report to be Awareness
PROGRAM ON to be submitted to program will be
HIV/AIDS, HEALTH organized for DSC office conducted
CAMP, BANNING OF unskilled ASAP.
CHILD LABOUR labor
BELOW 14 YEARS AGE