Академический Документы
Профессиональный Документы
Культура Документы
A.1.1(1) Construction of Combined Field Office, Laboratory and Living ls. 1.00 P.E. Cert-1
Quarters Building for the Engineer
B. OTHER GENERAL REQUIREMENTS
B.4(5) Bridge Survey & Staking ls. 1.00 P.E. Cert-1
B.5 Project Billboard each 4.00 P.E. Cert-1
B.7 Occupational Safety & Health Program months 2.00 P.E. Cert-1
B.8 Traffice Management months 2.00 P.E. Cert-1
B.9 Mobilization/Demobilization ls. 1.00 P.E. Cert-1
E. SURFACE COURSES
302(2) Bituminous Tack Coat (Emulsified Asphalt) sq.m 292.28 Q-1
310(1)a3 Biituminous Concrete Wearing Surface Course, Hot-Laid
(50 mm. thick) sq.m 292.28
a. Aggregate cu.m - GP-1, Q-1
b. Bituminous Material tonne - Q-1
G-1, Ext.-1, Sty-1, C-
c. Mix cu.m 21.95
1
d. Hydrated Lime tonne - Q-1
e. Mineral Filler cu.m - GP-1
f. Compacted Pavement lm - D&T-1
F. BRIDGE (RETROFITTING/STRENGTHENING)
403(4) Structural Steel, furnished & fabricated kgs. 450.36 Q-1
411(2) Paint sq.m. 212.28 Q-1
416(1)a Carbon Fiber Sheet sq.m 265.54 Q-1
416a(1) Carbon Fiber Plate sq.m. 28.24 Q-1
SPL 1 Structural Concrete Epoxy and Crack Repair ls. 1.00 Q-1
E.SURFACE COURSES
612(1) Reflectorized Thermoplastic Pavement Marking(white) sq.m. 7.80 Q-1
612(2) Reflectorized Thermoplastic Pavement Marking(yellow) sq.m. 11.70 Q-1
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 8,800,294.62 0.5000% Q.C Chart--------- P 44,001.47
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 28,600.96 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 6,600.22 Reg.l Lab. - - - - - - -- - - P
c.) Misc. & Other - (20%) - - - -- P 8,800.29 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 44,001.47 TOTAL - - - - - - - - - - - P
APPROVED :
MARCELINO M. OPERARIO
District Engineer
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
1002(5)h3 Floor Drain-stainless 100mm dia each 2.00 P.E. Cert. - 1
1002(5)i Toilet Soap Holder each 2.00 P.E. Cert. - 1
1002(5)k Toilet Tissue Holder each 2.00 P.E. Cert. - 1
1002(5)q Faucet each 2.00 P.E. Cert. - 1
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36 P.E. Cert. - 1
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50 P.E. Cert. - 1
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00 P.E. Cert. - 1
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00 P.E. Cert. - 1
1004(2) e Finishing Hardwares-Knobs set 4.00 P.E. Cert. - 1
1004(2) g Finishing Hardwares-Hinges set 16.00 P.E. Cert. - 1
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 23.23 P.E. Cert. - 1
Wooden Doors & Window
1010(2) a Doors-flush sq.mt. 4.26 P.E. Cert. - 1
1010(2) b Doors-wood panel sq.mt. 7.56 P.E. Cert. - 1
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55 P.E. Cert. - 1
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73 P.E. Cert. - 1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14 P.E. Cert. - 1
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims sq.m. 14.40 P.E. Cert. - 1
1018(2) Unglazes Tiles sq.m. 4.80 P.E. Cert. - 1
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00 P.E. Cert. - 1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 362.50 P.E. Cert. - 1
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 352.46 Q-1
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 170.10 Q-1
Roof Framing
1047(2)a Structural Steel kgs. 5,998.74 Q-1
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00 P.E. Cert. - 1
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00 P.E. Cert. - 1
1100(2) a2 Conduit Coupling (RSC) pc 45.00 P.E. Cert. - 1
1100(2) a3 Conduit Coupling (RSC) pc 34.00 P.E. Cert. - 1
1100(3) a2 Locknut & Brushing(RSC) pc 34.00 P.E. Cert. - 1
1100(3) a3 Locknut & Brushing(RSC) pc 17.00 P.E. Cert. - 1
1100(4) d1 PVC/uPVC Elbow pc 98.00 P.E. Cert. - 1
1100(4) d2 PVC/uPVC Elbow pc 26.00 P.E. Cert. - 1
1100(8)a2 Conduit Clamp-20mm dia pc 330.00 P.E. Cert. - 1
1100(9)a2 G.I. Wire #16 gauge pc 7.00 P.E. Cert. - 1
1100(10) PVC Solvent Cement-400 cc. pc 4.00 P.E. Cert. - 1
1100(11)a2 Octagonal Junction Box pc 75.00 P.E. Cert. - 1
1100(11)b2 Utility Box-pvc/upvc pc 70.00 P.E. Cert. - 1
1100(11)b3 Grounding Rod Copperweld 20mm x 3m length 5.00 P.E. Cert. - 1
Wires & Wiring Devices
1101(1)a6 Electrical Wire-3.5mm 2 tw/thhn/thwn2 rolls 6.00 P.E. Cert. - 1
1101(1)a7 Electrical Wire-5.5mm 2 tw/thhn/thwn3 rolls 2.50 P.E. Cert. - 1
1101(1)a8 Electrical Wire-8mm 2 tw/thhn/thwn4 rolls 0.30 P.E. Cert. - 1
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00 P.E. Cert. - 1
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00 P.E. Cert. - 1
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00 P.E. Cert. - 1
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00 P.E. Cert. - 1
APPROVED :
MARCELINO M. OPERARIO
District Engineer
Republic of the Philippines
Department of Public Works and Highways
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 8, 2018
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned project
period April 1-7,2018. We further certify that we have found that the quality of materials in the following items of work correspond
the quality accomplished conforms with the Standard Specifications and Special Provisions of the contract viz :
Quantity Accomplished
ITEM NO. : DESCRIPTION :PROGRAMMEDTHIS
: WEEK :THIS WEEK :
A. OTHER GENERAL REQUIREMENTS
Construction of Combined Field Office, Laboratory and
A.1.1(1) 1.00 ls. 1.00 ls. 1.00 ls.
Living Quarters Building for the Engineer
B. OTHER GENERAL REQUIREMENTS
B.4(5) Bridge Survey & Staking 1.00 ls. 0.50 ls. 0.50 ls.
B.5 Project Billboard 4.00 each each 4.00 each
B.7 Occupational Safety & Health Program 2.00 months months months
B.8 Traffice Management 2.00 months months months
B.9 Mobilization/Demobilization 1.00 ls. ls. 0.50 ls.
E. SURFACE COURSES
302(2) Biituminous
Bituminous Tack Coat Wearing
Concrete (Emulsified Asphalt)
Surface Course, Hot-Laid 292.28 sq.m sq.m sq.m
310(1)a3 (50 mm. thick) 292.28 sq.m sq.m sq.m
F. BRIDGE (RETROFITTING/STRENGTHENING)
403(4) Structural Steel, furnished & fabricated 450.36 kgs. kgs. kgs.
411(2) Paint 212.28 sq.m. sq.m. sq.m.
416(1)a Carbon Fiber Sheet 265.54 sq.m sq.m sq.m
416a(1) Carbon Fiber Plate 28.24 sq.m. sq.m. sq.m.
SPL 1 Structural Concrete Epoxy and Crack Repair 1.00 ls. ls. ls.
E.SURFACE COURSES
612(1) Reflectorized Thermoplastic Pavement Marking(white) 7.80 sq.m. sq.m. sq.m.
612(1) Reflectorized Thermoplastic Pavement Marking(yellow) 11.70 sq.m. sq.m. sq.m.
Note:
Project on going…
R.13.11.63/ads II/qas/fbconoliiifiles
Republic of the Philippines
Department of Public Works and Highways
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 16, 201
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned project
period April 8-15, 2018. We further certify that we have found that the quality of materials in the following items of work correspon
the quality accomplished conforms with the Standard Specifications and Special Provisions of the contract viz :
Quantity Accomplished
ITEM NO. : DESCRIPTION :PROGRAMMEDTHIS
: WEEK THIS
: WEEK :
A. OTHER GENERAL REQUIREMENTS
Construction of Combined Field Office, Laboratory and
A.1.1(1) 1.00 ls. ls. 1.00 ls.
Living Quarters Building for the Engineer
B. OTHER GENERAL REQUIREMENTS
B.4(5) Bridge Survey & Staking 1.00 ls. ls. 0.50 ls.
B.5 Project Billboard 4.00 each each 4.00 each
B.7 Occupational Safety & Health Program 2.00 months 1.80 months 1.80 months
B.8 Traffice Management 2.00 months 1.80 months 1.80 months
B.9 Mobilization/Demobilization 1.00 ls. ls. 0.50 ls.
E. SURFACE COURSES
302(2) Biituminous
Bituminous Tack Coat Wearing
Concrete (Emulsified Asphalt)
Surface Course, Hot-Laid 292.28 sq.m sq.m sq.m
310(1)a3 (50 mm. thick) 292.28 sq.m sq.m sq.m
F. BRIDGE (RETROFITTING/STRENGTHENING)
403(4) Structural Steel, furnished & fabricated 450.36 kgs. kgs. kgs.
411(2) Paint 212.28 sq.m. sq.m. sq.m.
416(1)a Carbon Fiber Sheet 265.54 sq.m sq.m sq.m
416a(1) Carbon Fiber Plate 28.24 sq.m. sq.m. sq.m.
SPL 1 Structural Concrete Epoxy and Crack Repair 1.00 ls. ls. ls.
E.SURFACE COURSES
612(1) Reflectorized Thermoplastic Pavement Marking(white) 7.80 sq.m. sq.m. sq.m.
612(1) Reflectorized Thermoplastic Pavement Marking(yellow) 11.70 sq.m. sq.m. sq.m.
Note:
Project on going…
R.13.11.63/ads II/qas/fbconoliiifiles
Republic of the Philippines
Department of Public Works and Highways
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 23, 201
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned project
period April 16-22, 2018. We further certify that we have found that the quality of materials in the following items of work correspo
to the quality accomplished conforms with the Standard Specifications and Special Provisions of the contract viz :
Quantity Accomplished
ITEM NO. : DESCRIPTION :PROGRAMMEDTHIS
: WEEK THIS
: WEEK :
A. OTHER GENERAL REQUIREMENTS
Construction of Combined Field Office, Laboratory and
A.1.1(1) 1.00 ls. ls. 1.00 ls.
Living Quarters Building for the Engineer
B. OTHER GENERAL REQUIREMENTS
B.4(5) Bridge Survey & Staking 1.00 ls. ls. 0.50 ls.
B.5 Project Billboard 4.00 each each 4.00 each
B.7 Occupational Safety & Health Program 2.00 months months 1.80 months
B.8 Traffice Management 2.00 months months 1.80 months
B.9 Mobilization/Demobilization 1.00 ls. ls. 0.50 ls.
E. SURFACE COURSES
302(2) Bituminous
BiituminousTack Coat Wearing
Concrete (Emulsified Asphalt)
Surface Course, Hot-Laid 292.28 sq.m sq.m sq.m
310(1)a3 (50 mm. thick) 292.28 sq.m sq.m sq.m
F. BRIDGE (RETROFITTING/STRENGTHENING)
403(4) Structural Steel, furnished & fabricated 450.36 kgs. kgs. kgs.
411(2) Paint 212.28 sq.m. sq.m. sq.m.
416(1)a Carbon Fiber Sheet 265.54 sq.m 265.54 sq.m 265.54 sq.m
416a(1) Carbon Fiber Plate 28.24 sq.m. sq.m. sq.m.
SPL 1 Structural Concrete Epoxy and Crack Repair 1.00 ls. ls. ls.
E.SURFACE COURSES
612(1) Reflectorized Thermoplastic Pavement Marking(white) 7.80 sq.m. sq.m. sq.m.
612(1) Reflectorized Thermoplastic Pavement Marking(yellow) 11.70 sq.m. sq.m. sq.m.
Note:
Project on going…
R.13.11.63/ads II/qas/fbconoliiifiles
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned project
period April 23 - 30, 2018. We further certify that we have found that the quality of materials in the following items of work corresp
to the quality accomplished conforms with the Standard Specifications and Special Provisions of the contract viz :
Quantity Accomplished
ITEM NO. : DESCRIPTION :PROGRAMMEDTHIS
: WEEK THIS
: WEEK :
A. OTHER GENERAL REQUIREMENTS
Construction of Combined Field Office, Laboratory and
A.1.1(1) 1.00 ls. ls. 1.00 ls.
Living Quarters Building for the Engineer
B. OTHER GENERAL REQUIREMENTS
B.4(5) Bridge Survey & Staking 1.00 ls. ls. 0.50 ls.
B.5 Project Billboard 4.00 each each 4.00 each
B.7 Occupational Safety & Health Program 2.00 months months 1.80 months
B.8 Traffice Management 2.00 months months 1.80 months
B.9 Mobilization/Demobilization 1.00 ls. ls. 0.50 ls.
E. SURFACE COURSES
302(2) Biituminous
Bituminous Tack Coat Wearing
Concrete (Emulsified Asphalt)
Surface Course, Hot-Laid 292.28 sq.m sq.m sq.m
310(1)a3 (50 mm. thick) 292.28 sq.m sq.m sq.m
F. BRIDGE (RETROFITTING/STRENGTHENING)
403(4) Structural Steel, furnished & fabricated 450.36 kgs. kgs. kgs.
411(2) Paint 212.28 sq.m. sq.m. sq.m.
416(1)a Carbon Fiber Sheet 265.54 sq.m sq.m 265.54 sq.m
416a(1) Carbon Fiber Plate 28.24 sq.m. 28.24 sq.m. 28.24 sq.m.
SPL 1 Structural Concrete Epoxy and Crack Repair 1.00 ls. 0.80 ls. 0.80 ls.
E.SURFACE COURSES
612(1) Reflectorized Thermoplastic Pavement Marking(white) 7.80 sq.m. sq.m. sq.m.
612(1) Reflectorized Thermoplastic Pavement Marking(yellow) 11.70 sq.m. sq.m. sq.m.
Note:
Project on going…
R.13.11.63/ads II/qas/fbconoliiifiles
l 8, 2018
ACCOMPL.
100.00%
50.00%
100.00%
0.00%
0.00%
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
LDIANO
eer I
l 16, 2018
ACCOMPL.
100.00%
50.00%
100.00%
90.00%
90.00%
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
LDIANO
eer I
l 23, 2018
ACCOMPL.
100.00%
50.00%
100.00%
90.00%
90.00%
50.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
LDIANO
eer I
y 2, 2018
ACCOMPL.
100.00%
50.00%
100.00%
90.00%
90.00%
50.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
80.00%
0.00%
0.00%
LDIANO
eer I
MAIR CONST. & GEN. MERCHANDISE
MONTHLY MATERIALS QUALITY CONTROL PROGRESS REPORT
April 2018
Month Year
VENDEY M. GALDIANO
(Project Engineer,Gov't)
c. Inspection
34.10% 43.48%
(Current Month) Total to Date
PREPARED BY:
SUBMITTED BY:
LEODEGARIO M. MAZO
Engineer III
Chief, Quality Assurance Section
MAIR CONST. & GEN. MERCHANDISE
Bayugan City, Agusan del Sur
STATUS OF TEST
Date: May 2, 2018
Project: Retrofitting/Strengthening of Binongan Bridge(B00802MN) along NRJ Cuevas-Sampaguita Road
Location: Veruela, Agusan del Sur K1384+684-K1384+671
Our records indicate that the status of test in the above project for April 1 - 30, 2018
is as follows.
Actual Medium Number Test
Item Materials Estimated No. of Test on Balance
Quantities Required File
A. OTHER GENERAL REQUIREMENTS
A.1.1(1) Construction of Combined Field Office, Laboratory and 1.00 ls. P.E. Cert-1 1 0
Living Quarters Building for the Engineer
B. OTHER GENERAL REQUIREMENTS
B.4(5) Bridge Survey & Staking 1.00 ls. P.E. Cert-1 0 1
B.5 Project Billboard 4.00 each P.E. Cert-1 1 0
B.7 Occupational Safety & Health Program 2.00 months P.E. Cert-1 0 1
B.8 Traffice Management 2.00 months P.E. Cert-1 0 1
B.9 Mobilization/Demobilization 1.00 ls. P.E. Cert-1 0 1
E. SURFACE COURSES
302(2) Bituminous Tack Coat (Emulsified Asphalt) 292.28 sq.m Q-1 1 0
310(1)a3 Biituminous Concrete Wearing Surface Course, Hot-Laid
292.28 sq.m
(50 mm. thick)
a. Aggregate - cu.m GP-1, Q-1 0 1
-
b. Bituminous Material tonne Q-1 0 1
c. Mix 21.95 cu.m G-1 0 1
Ext.-1 0 1
Sty-1 0 1
C-1 0 1
d. Hydrated Lime - tonne Q-1 0 1
e. Mineral Filler - cu.m GP-1 0 1
f. Compacted Pavement - lm D&T-1 0 1
F. BRIDGE (RETROFITTING/STRENGTHENING)
403(4) Structural Steel, furnished & fabricated 450.36 kgs. Q-1 1 0
411(2) Paint 212.28 sq.m. Q-1 1 0
416(1)a Carbon Fiber Sheet 265.54 sq.m Q-1 1 0
416a(1) Carbon Fiber Plate 28.24 sq.m. Q-1 1 0
SPL 1 Structural Concrete Epoxy and Crack Repair 1.00 ls. Q-1 1 0
E.SURFACE COURSES
612(1) Reflectorized Thermoplastic Pavement Marking(white) 7.80 sq.m. Q-1 1 0
612(1) Reflectorized Thermoplastic Pavement Marking(yellow) 11.70 sq.m. Q-1 1 0
LEGEND
M- Mechanical or Sieve Analysis P- Plastic and Liquid Limits Test
C- Compaction of Test D- Field Density Test
Q- Quality Test SF- Shrinkage Factor Test
FT- Free Test IR- Inspection Report
-One test of every layer of 20 cu.m. distance between test holes not to exceed 150 linear meters.
-One set by Cylinder samples for every dry pouring but not exceed 75 cu.m
-One set by beam samples for every dry pouring but not exceed 75 cu.m.
SE
y 2, 2018
ad
1 - 30, 2018
Work
Accom.
100.00%
0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
43.48%
LDIANO
I
eer I
actor Test
MAIR CONST. & GEN. MERCHANDISE
Bayugan City, Agusan del Sur
Note:
Project on going…
April 8, 2018
Date
CERTIFICATION
Name of Project: : Retrofitting/Strengthening of Binongan Bridge(B00802MN) along NRJ Cuevas-Sampaguita
Road
I hereby certify that item A.1.1(1) which represents the Construction of Combined Field Office,
Laboratory and Living Quarters Building for the Engineers with a total quantity of One(1) lumpsum of the
above named project was done in accordance to the approved plans & specifications.
VENDEY M. GALDIANO
Project Engineer II
R.13.11.6/sds II/qas/fbconoliiifiles
Republic of the Philippines
Republic of the Philippines
Department of Public Works and Highways
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
CERTIFICATION
Name of Project: : Retrofitting/Strengthening of Binongan Bridge(B00802MN) along NRJ Cuevas-Sampaguita
Road
I hereby certify that item 416(1)a which represents the Carbon Fiber Sheet with a total quantity of Two
hundred Sixty Five and 54/100 (265.54) square meters of the above named project was done in accordance
to the approved plans & specifications.
VENDY M. GALDIANO
Project Engineer I
R.13.11.6/sds II/qas/fbconoliiifiles
Republic of the Philippines
CERTIFICATION
Name of Project: : Retrofitting/Strengthening of Binongan Bridge(B00802MN) along NRJ Cuevas-Sampaguita
Road
I hereby certify that item 416a(1) which represents the Carbon Fiber Plate with a total quantity of
Twenty Eight and 24/100 (28.24) square meters of the above named project was done in accordance to the
approved plans & specifications.
VENDY M. GALDIANO
Project Engineer I
R.13.11.6/sds II/qas/fbconoliiifiles
April 8, 2018
Date
CERTIFICATION
Name of Project: : Retrofitting/Strengthening of Binongan Bridge(B00802MN) along NRJ Cuevas-Sampaguita
Road
VENDY M. GALDIANO
Project Engineer II
R.13.11.6/sds II/qas/fbconoliiifiles
May 2, 2018
Date
CERTIFICATION
Name of Project: : Construction of One(1)-Storey TechVoc Workshop/Laboratory Building (Batch 12) @
Bunawan National High School, Bunawan, ADS
Construction of One(1)-Storey TechVoc Workshop/Laboratory Building (Batch 12) @
Bunawan National High School, Bunawan, ADS
I hereby certify that item SPL 1 which represents the Structural Concrete Epoxy and Crack Repair with
total quantity of One(1) lumpsum of the above named project was done in accordance to the approved
plans & specifications.
VENDEY M. GALDIANO
Project Engineer II
R.13.11.6/sds II/qas/fbconoliiifiles
pril 8, 2018
Date
ION
along NRJ Cuevas-Sampaguita
Y M. GALDIANO
ect Engineer II
ril 23, 2018
Date
ION
along NRJ Cuevas-Sampaguita
Y M. GALDIANO
ect Engineer I
ril 23, 2018
Date
ION
along NRJ Cuevas-Sampaguita
pril 8, 2018
Date
ION
along NRJ Cuevas-Sampaguita
aking with a total quantity of
pproved plans &
Y M. GALDIANO
ect Engineer II
May 2, 2018
Date
ION
y Building (Batch 12) @
poxy and Crack Repair with a
ordance to the approved
Y M. GALDIANO
ect Engineer II
BRS FORM QA-1
MONITORING OF QUALITY ASSURANCE (QA) IMPLEMENTATION BY THE
DISTRICT ENGINEERING & CITY OFFICES IN DPWH INFRASTRUCTURE PROJECTS
CONCERN REMARKS
* Accreditation of PE/PI A
VENDEY M. GALDIANO PE I
Accreditation No.
* Accreditation of Contractors'/Consultants'
ME B
ALPINIANO L. ALABA JR. ME-I
Project on going…
Acreditation No. 1313
* Limits of Assignment of PE/ME C
None
None
* Compliance to Minimum Testing The minimum testing requirement were performed by the
Requirements F contractor.