Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. FACILITIES FOR THE ENGINEERS
A.1.1(3) Construction of Combined Field Office ls 1.00 P.E. Cert-1
A.1 Low Cost Field Office/Quarters/Viewdeck
B. Other General Requirements
B.4(1) Construction Survey & Staking kms. 0.04 P.E. Cert-1
B.5 Project Bilboard each 4.00 P.E. Cert-1
B.7 Occupational Safety and Health Program month 1.77 P.E. Cert-1
B.8 Traffic Management month 1.77 P.E. Cert-1
B.9 Mobilization / Demobilization ls 1.00 P.E. Cert-1
C. Earthworks
101(4)b Removal of Actual Structures/Obstruction lm 6.00 P.E. Cert. - 1
103(1)a Structure Excavation cu.m. 111.13 P.E. Cert. - 1
104(2)a Embankment from Borrow(Common Soil) cu.m. 150.33 GPC-1, D-6
D. SUBBASE & BASE COURSE
200(1) Aggregates Subbase Course cu.m. 61.60 GPC-1, CBR-1, D-3
B. Bank & Slope Protection Structures
404(1)a Reinforcing Steel Grade 40 kgs. 10,236.35 Q-1/size/10,000kg
405(1)a3 Structural Concrete Class A cu.m. 103.31 CCS-2 sets
a. Cement bags 981.35 *
b. Fine Aggregates cu.m 51.65 **
c. Coarse Aggregates cu.m 103.31 ***
d. Water P.E. Cert. - 1
407(8) Lean Concrete cu.m. 6.73 CCS-1 set
a. Cement bags 63.94 *
b. Fine Aggregates cu.m 3.37 **
c. Coarse Aggregates cu.m 6.73 ***
d. Water P.E. Cert. - 1
MARCELINO M. OPERARIO
District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 8, 2018
Date
k1549+430
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 2-7, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions of
the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
3rd report 16 - 22
k1549+430
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 2-7, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions of
the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
3rd report 16 - 22
k1549+430
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 2-7, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions of
the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
3rd report 16 - 22
k1549+430
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 2-7, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions of
the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
3rd report 16 - 22
April 2018
Month Year
VENDEY M. GALDIANO
(Project Engineer,Gov't)
0.00% 0.00%
(Current Month) Total to Date
PREPARED BY:
ARVIN D. AYOSO
Materials Engineer - 1
DATREBIL CONSTRUCTION & SUPPLY
SUBMITTED BY:
LEODEGARIO M. MAZO
Engineer III
Chief, Quality Assurance Section
0.00%
STATUS OF TEST
Date: May 2, 201
Work
Accom.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
M. GALDIANO
gineer II
Engineer I
Project :
Repair/Maintenance of Bank Protection along Asuncion-Laak-Veruela Road For the period: April 1 - 30, 2018
Location : Veruela, Agusan del Sur
Note:
Project on-going…
CONCERN REMARKS
* Accreditation of PE/PI A
VENDEY M. GALDIANO PE I
Accreditation No.
* Accreditation of Contractors'/Consultants'
ME B
ARVIN D. AYOSO ME-I
Project on going…
Acreditation No.
* Limits of Assignment of PE/ME C
None
None
REMARKS
Project on going…
The minimum testing requirement were performed by the
contractor.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
CERTIFICATION
Repair/Maintenance of Bank Protection along Asuncion-Laak-Veruela Road
Name of Project :
I hereby certify that Item 1714(1) which represents the Gabions of the above named projec
a total quantity of Twenty (20) cubic meter was done in accordance to the approved plans &
specifications.
VENDEY M. GALDIAN
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
CERTIFICATION
Repair/Maintenance of Bank Protection along Asuncion-Laak-Veruela Road
Name of Project :
I hereby certify that Item 1713(2) which represents the Mattresses of the above named pro
with a total quantity of One-Hundred Ninety five (195) cubic meter was done in accordance to the
approved plans & specifications.
VENDEY M. GALDIAN
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
IFICATION
ank Protection along Asuncion-Laak-Veruela Road
VENDEY M. GALDIANO
Project Engineer I
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
IFICATION
ank Protection along Asuncion-Laak-Veruela Road
VENDEY M. GALDIANO
Project Engineer I