ANOH Midstream Gas Plant Development- ITT for Major Buildings Sow

Engineering Department,
ANOH Gas Processing Company

DOCUMENT TRANSMITTAL SHEET

Transmittal Number: OPE-ANOH-DWL-TR-00001

Attn:
Dawnwatch Limited
12C, Alexandria Crescent,
Wuse II, Abuja

Date: 2nd March 2018


________________________________________________________________________________________________________________________

 STATUS CODE 1  STATUS CODE 2  STATUS CODE 3  STATUS CODE 4  ISSUED FOR INFORMATION  ISSUED FOR IMPLEMENTATION

Please find attached the under mentioned documents:

NO OF Return
DOC NUMBER DOC TITLE ISSUE / REV
COPIES Code

- ITT - 1 -

- Section I - FOA & Appendix 1 - 1 -

- Section II (a) - General Conditions of Contract - 1 -

- Section IIb - Special Conditions of Contract - 1 -

- Section III - Remuneration - 1 -


- Section IV – Scope of Work - 1 -

- Section V - Contract Administration Procedures - 1 -


- Section VI - HSSE - 1 -
- Section VII - Quality Management System (QMS) - 1 -
- Section IX - The Technical Information - 1 -
- Section X - Materials Services and Facilities to be provided by the COMPANY - 1 -

- Civil & Structural - 114 -

- Electrical - 82 -
- FEED MDR - 1 -
- Plot Plan - 1 -

COMMENTS :

Please sign duplicate copy of this transmittal and send to josephine.oghademe@anohgasprocessing.com

Josephine OGHADEME
Raised by: ______________________________ Signature & Date: ___ 02-03-2018
Project Document Control

Received by:(Name) __________________________________ Signature & Date: ______________________

Вам также может понравиться