Вы находитесь на странице: 1из 1

10mm @ 150 _ cfcRadial

m
from end of projection CI man holes
0.9'm 2Nos
Top Slab Top slab(150)
Projection 8mm @ 150 c/c
Circumferential
Phenail with
r
fly proof v ntilator
150
• •
Betl/nouth
9 00

7
G.1 Steps@300c/c
10mm @ 150 c/c 150
A\ Both ways 10 mm @ 150/c
•■•

3000 Vertical4 outerface



100
Top mesh bothways 8 mm 150c/c
10 mm @ 150 c/c Hoop rings
RCCIadder
1Omm01 50c/c & outer face
haunch bars 400mm wide
150 it

200
e 1 - 4-8 300
SAND FILLING 300
Ld 00
3600
Bottom mesh bothways
10 mm 150 c/c • 3101143

Note:—
1. Gradeof Concrete :M30 SCHEME :
2. Grade of Steel (Tor 40) : Fe415
3. Clear minimum cover
slobs : 45MM
side walls : 45MM
4. SEC : 10 T/SQM
5. All dimensions are in 'mm' unless specified.
6. The Steel should not be overlapped
at the junction points
7. Not more than 1/3rd of the bars should
10 KL SUMP
be curtailed at a given section
8. As per IS 3370, the maximum spacing of
Reinforcement should not exceed 300mm or
thickness of section whichever is less