Ref. No.MCR / C 2573/16 Date: 24.06.2016

REPORT OF EXAMINATION OF PRESSURE VESSEL OR PLANT


ITEM: Air Receiver

1. Name of the occupier of the factory : M/S. Shahi Export Pvt. Ltd,
Unit-28

2. Address of the factory : No: 226/227, 8th Main, 3rd Cross


KIADB, Peenya Industrial Area,
Bangalore – 560058
3. Name description & distinctive No. of : Air Receiver, Sr. No: 1106
the pressure vessel or plant Cap: 1000 Ltrs.

4. Name and address of th manufacturer & : Kaeser Compressors- Pune.


Reference to their test certificate or
certificate of competent person

5. Nature & process in which it is used : For Plant Air Requirement

6. Particulars of pressure vessel or plat :


a. Date of construction : 07.07.2011
b. Thickness of walls : Ultrasonic Thickness shell; 6mm,

c. Date on which the pressure vessel or plant : 2011.


was first taken in to use
d. Max. Permissible working pressure : MAX: W.P: 10 BAR
e. Design pressure recommended by manufacturer : D.P: 11 BAR

(The history should be briefly given and examiner should state whether he has seen the last previous
report.)

7. Date of last hydro – test (If any) : Dt. 07.07.2011, Pressure applied
and pressure applied 18 BAR.

8. Is the pressure vessel or plant is in open : Mounted under the Shelter.


Or otherwise exposed to weather of damp

9. What part (If any) where in accessible : Internal

10. What examination and tests were made. : External Visual, Pressure test & Ultrasonic
Specify pressure if HYD test was carried out Thickness Test.

11. Condition of the pressure vessel or plant state :


any defects materially affecting maximum
permissible safe working pressure of the plant

EXTERNAL : Good
INTERNAL : Good

P.T.O
12. Are the required fittings and appliances : Pressure Gauge & safety Valve are
provided in accordanced with rules provided.

13. Are all fittings and appliances properly : Above are set in order.
Maintained and in good condition? Have
the pressure setting been checked and corrected

14. Repairs (If any) required and period with in : Nil


which they should be executed & any other
condition which the person making the
examination thinks it necessary to specify
for securing safe working

15. Maximum permissible working pressure calculated : MAX. W.P: 10 BAR


from dimensions and from the thickness & other data Set Pressure : 07 BAR.
ascertained by the present examiner. Due allowances
being made for conditions of working if unusual or
exceptionally severe (state min.) thickness of walls
measured during examination

16. Where repairs affecting the maximum working : Nil


pressure are required, state the working principle.

a. Before the expiration of such period specified in 14. : Nil


b. After the expiration of such period if the required : Nil
repairs have not been completed.
c. After the completion of the required repairs : Nil

17. Other observations : Nil

I certify that on this day 24.06.2016, the pressure vessel or plant described above was thoroughly
Cleaned and (So far as its construction permits) made accessible for thorough examination and for such tests as
Were necessary for thorough examination and that of said date, I thoroughly examined the pressure vessel or
Plant including its fittings and that the above is true report of my examination.

Competent person accepted by the Director of Factories and Boilers, Government of Karnataka, vide
Their Letter No. PVPSMC/FYA/CR-30/2014-15 Dated: 23.07.2014.

Next Inspection due date: 23.12.2016


B.V. Shiva Reddy B.E (Mech.)
Competent Person