BILL OF QUANTITIES

PROPOSED BUILDING AT KAHANTHOTA ROAD,


MALABE

SECTION 1

SUB STRUCTURE FOUNDATION


Client: BILL PAGE
Project:Plastica
Proposed building at kahanthota road, MAIN WORKS 00+0001B/1000000
NUMBER NUMBER
Malabe 1 2B/1
Bill of Quantities
Amount
Ref Description Unit Quantity Rate
Rs.

SECTION
E - IN SITU
B -CONCRETE
SITE WORK/ LARGE CONCRETE

Site preparation

A bushes, scrub or undergrowth Item 1 11,000.00

Excavation including necessary dewatering,earthwork


support, disposal etc ; as shown in drawing

B Excavate to footings m3 125 1,237.00 154,625.00

Disposal of excavated materials

C Remove surplus unsuitable excavated materials off-site m3 42 Included in above rate

Filling

Filling in layers not exceeding 150 mm


to 95% maximum dry density in accordance with the
Specifications

D Filled into excavation -Selected earth from excavation m3 84 354.00 29,736.00

E Filled in making up levels -quarry dust m3 334 2,134.12 712,795.95

Concrete; (1:2:6) mix of C15 N/mm2 Concrete Ordinary


Portland Cement (OPC) concrete, as specified in drawing

F 50 mm thick blinding m2 186 703.00 130,758.00

G 50 mm thick filled into block wall m2 30 703.00 21,090.00

Anti-termite application including warranty

H Genarally m2 686 500.00 343,000.00


Client: BILL PAGE
Project:Plastica
Proposed building at kahanthota road, MAIN WORKS 00+0001B/2000000
NUMBER NUMBER
Malabe 1 2B/1
Bill of Quantities
Amount
Ref Description Unit Quantity Rate
Rs.

Total - Rs. 1,403,004.95


Carried Forward to Bill Summary
Client: Plastica BILL PAGE
Project: Proposed building at kahanthota road, MAIN WORKS NUMBER NUMBER 2C/1
Malabe 1 2C/1
Bill of Quantities

Amount
Ref Description Unit Quantity Rate
Rs.

SECTION C - CONCRETE WORK

SUBSTRUCTURE

Concrete; (1:1 1/2 : 3) mix of C25 N/mm2 Concrete Ordinary


Portland Cement (OPC) concrete, as specified in drawing

A To footings m3 54.30 18,245.00 990,703.50

B To sub columns m3 2.12 18,245.00 38,679.40

C To ground beams m3 18.50 18,245.00 337,532.50

D To grade slab m3 65.40 18,245.00 1,193,223.00

E To ramp m3 3.00 18,245.00 54,735.00

F To lift wall m3 1.60 18,245.00 29,192.00

High yield bar reinforcement to BS 4449

In footings

G 12 mm diameter bars kg 1,796.00 163.00 292,748.00

H 16 mm diameter bars kg 3,409.00 163.00 555,667.00

In sub columns

J 6 mm diameter bars kg 69.00 163.00 11,247.00

K 20 mm diameter bars kg 315.00 163.00 51,345.00

In ground beams

L 6 mm diameter bars kg 394.00 163.00 64,222.00

M 16 mm diameter bars kg 1,213.00 163.00 197,719.00

In grade slab including ramp -150 mm thick

N 10 mm diameter bars kg 4,360.00 163.00 710,680.00

O In lift wall

P 10 mm diameter bars kg 120.00 163.00 19,560.00

BRC mesh A-142; all in accordance with the Specifications

Q To beds 75 mm thick m2 24.00 350.00 8,400.00

Total - Rs. 4,555,653.40


Carried Forward to Collection
Client: Plastica BILL PAGE
Project: Proposed building at kahanthota road, MAIN WORKS NUMBER NUMBER 2C/2
Malabe 1 2C/1
Bill of Quantities

Amount
Ref Description Unit Quantity Rate
Rs.

SECTION
E - IN SITU
C -CONCRETE
CONCRETE/ WORK
LARGE(CONT'D)
CONCRETE

SUBSTRUCTURE (CONT'D)

Shuttering

A To sides of footings m2 95.00 2,487.00 236,265.00

B To edges of blinding m2 21.00 2,487.00 52,227.00

C To sides of sub columns m2 23.00 2,487.00 57,201.00

D To sides of lift wall m2 17.00 2,487.00 42,279.00

E To sides of ground beams m2 165.00 2,487.00 410,355.00

F To sides of ramp m2 6.00 2,487.00 14,922.00

Load bearing hollow blockwall with minimum compressive


strength of 7Mpa including all necessary works, as shown in
drawing

G 100 mm thick m2 61.00 1,545.00 94,245.00

Sundries

Polythene sheet 1000 gauge; all in accordance with the


Specifications

H Generally m2 437.00 157.00 68,609.00

Bituminous paint, 1000 microns; all in accordance with the


Specifications

J Generally m2 N/A

12 mm Thick expansion joint with mastic fill

K 500 mm High m 7.50 500.00 3,750.00

Total - Rs. 979,853.00


Carried Forward to Collection
Client: Plastica BILL PAGE
Project: Proposed building at kahanthota road, MAIN WORKS NUMBER NUMBER
Malabe 1 2B/S
Bill of Quantities

Amount
Ref Description
Rs.

SUB
L - WINDOWS/
STRUCTUREDOORS/
FOUNDATION
STAIRS

L20 Doors/Shutters/Hatches
Collection

Collection
Page 2B/1 1,403,004.950

Page 2C/1 4,555,653.400

Page 2C/2 979,853.000

Total - Rs. 6,938,511.350


Carried Forward to Bill Summary
Client: Plastica BILL PAGE
Project: Proposed building at kahanthota road, MAIN WORKS NUMBER NUMBER
Malabe 1 2B/S
Bill of Quantities

Amount
Ref Description
Total - Rs. Rs.
Carried Forward to Bill Summary