Академический Документы
Профессиональный Документы
Культура Документы
2018-07-02
Tools are being developed. Therefore, most data required in this document is not available for the time
being. Turn to related contact person to obtain tool test versions by referring to UMTS Paging: Influence
Factors +Troubleshooting Methods and Tools + Deliverables.
Tools used for the analysis include the power mapping tool, smart parameter mapping tool, parameter
checking tool, seamless upgrade tool, OMStar, PRS, M2000, FMA, and Trace Analyzer.
1 Overview
1.1 Background
Describe the background information of the current project, including the project name, project scale,
networking mode (IP transmission or microwave transmission), and major event in earlier stages.
Fill in items required by power mapping tool and attach the output results to this document.
Power Matching Calculation
Original Difference Target TOC Number of Maximum Type of the Level of Fine-Tune Actual Difference Matching?
TOC of Antenna (dBm) Modules TOC of carrier Carrier of Power TOC after between
(dBm) System Carrier power Power Swapping Actual
Loss (dBm) Power (dBm) TOC and
(dBm) Target TOC
(dBm)
Parameter Name
IMSI implicit detachment time (minute)
Periodical user deletion time (hour)
The first paging duration
The second paging duration
The third paging duration
The fourth paging duration
The fifth paging duration
The number of paging times
All RAN paging indicators
TMSI/IMSI indicators
BSC paging threshold per second
Pre-paging function
Position update optimization function
Parameter Name
Early release function
Paging optimization control
Parameter Name
CN domain specific Discontinuous Reception (DRX) cycle length coefficient broadcast on SIB1 and
used by UEs in Idle Mode (DRXCycleLenCoef)
Periodical position update timer (T3212)
Times of retransmission of paging messages (MaccPageRepeatTimes)
Cell selection and reselection
Number of SCCPCH channels
4 Conclusion
Draw conclusions according to the analysis and summary of the required actions. Provide conclusive
opinions such as the current possible problems, the measures that can be taken, other required
troubleshooting methods, and the required data support.