COLUMCA C-1
COLUMNA C-2
COLUMNA C-4
COLUMNA C-5
COLUMNA C-6
COLUMNA C-7
COLUMNA C-8
COLUMNA C-9
PRIMER PISO METRADO TOTAL(kg) C-9
PESO VIGA X-X 0.30x0.65x2400x6.25 2925.00 C-9 PESO
PESO DE VIGA Y-Y 0.25x0.6x2400x5.25 1890.00 PRIMER PISO 151080.00
PESO DE LOSA 300x6.25x5.25 9843.75 SEGHUNDO PISO 120480
PESO ACABADO 120x6.25x5.25 3937.50 TERCER, CUARTO, QU90360
PESO TABIQUERIA 100x6.25x5.25 3281.25
SOBRECARGA 200x6.25x5.25 6562.50
COLUMNA 0.5X0.5X2400X3.6 2160.00
TOTAL: 30600.00
COLUMNA C-10
COLUMNA C-11
COLUMNA C-12
-1 LADO DERECHO
AREA(cm2) BxH(m)
861.7 0.30X0.30
563.0 0.30X0.30
C-2
AREA(cm2) BxH(m)
1709.6 0.45X0.45
1358.6 0.40X0.40
1018.9 0.35X0.35
3 LADO IZQUIERDO
AREA(cm2) BxH(m)
1564.1 0.40X0.40
1242.1 0.35X0.35
931.6 0.35X0.35
-3 LADO DERECHO
AREA(cm2) BxH(m)
1415.8 0.40X0.40
1093.8 0.35X0.35
783.3 0.30X0.30
4 LADO IZQUIERDO
AREA(cm2) BxH(m)
1518.2 0.40X0.40
1205.4 0.35X0.35
904.1 0.35X0.35
-4 LADO DERECHO
AREA(cm2) BxH(m)
915.5 0.35X0.35
602.7 0.30X0.30
5 LADO IZQUIERDO
AREA(cm2) BxH(m)
1721.8 0.45X0.45
1368.3 0.40X0.40
1026.2 0.35X0.35
-5 LADO DERECHO
AREA(cm2) BxH(m)
1037.6 0.35X0.35
684.1 0.30X0.30
6 LADO IZQUIERDO
AREA(cm2) BxH(m)
1789.6 0.45X0.45
1422.6 0.40X0.40
1066.9 0.35X0.35
-6 LADO DERECHO
AREA(cm2) BxH(m)
1078.4 0.35X0.35
711.3 0.30X0.30
C-7
AREA(cm2) BxH(m)
2213.6 0.50X0.50
1764.2 0.45X0.45
1323.1 0.40X0.40
C-8
AREA(cm2) BxH(m)
2531.8 0.55X0.55
2018.8 0.45X0.45
1514.1 0.40X0.40
C-9
AREA(cm2) BxH(m)
2637.9 0.55X0.55
2103.6 0.50X0.50
1577.7 0.40X0.40
0 LADO IZQUIERDO
AREA(cm2) BxH(m)
1905.6 0.45X0.45
1517.8 0.40X0.40
1138.3 0.35X0.35
10 LADO DERECHO
AREA(cm2) BxH(m)
1720.2 0.45X0.45
1332.3 0.40X0.40
952.9 0.35X0.35
1 LADO IZQUIERDO
AREA(cm2) BxH(m)
2176.7 0.50X0.50
1734.6 0.45X0.45
1301.0 0.40X0.40
11 LADO DERECHO
AREA(cm2) BxH(m)
1956.5 0.45X0.45
1514.5 0.40X0.40
1080.8 0.35X0.35
2 LADO IZQUIERDO
AREA(cm2) BxH(m)
2267.0 0.50X0.50
1806.9 0.45X0.45
1355.2 0.40X0.40
12 LADO DERECHO
AREA(cm2) BxH(m)
2037.1 0.45X0.45
1577.0 0.40X0.40
1125.3 0.35X0.35
EMEJANTES)
BxH(m)
0.40X0.40
0.35X0.35
0.30X0.30
0.30X0.30
0.30X0.30
0.45X0.45
0.40X0.40
0.35X0.35
0.40X0.40
0.35X0.35
0.35X0.35
0.35X0.35
0.30X0.30
0.50X0.50
0.45X0.45
0.40X0.40
0.55X0.55
0.45X0.45
0.40X0.40
0.55X0.55
0.50X0.50
0.40X0.40
METRADO DE CARGAS POR SISMO
DATOS :
MOMENTO DE INNERCIA
VIGAS SECCION I
V 101 30 65 686562.50
V 102 25 65 572135.42
V 103 25 60 450000.00
V 104 25 50 260416.67
C-3 DERECHA
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 30 30 67500.00 280
C-4
C-4 IZQUIERDO
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 35 35 125052.08 280
C-4 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-5
C-5 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-5 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-6
C-6 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-6 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-7
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-8
1 piso 55 55 762552.08 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-9
1 piso 55 55 762552.08 360
2 piso 50 50 520833.33 280
3,4,5 piso 40 40 213333.33 280
C-10
C-10 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-10 DERECHA
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-11
C-11 IZQUIERDO
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-11 DERECHA
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-12
C-12 IZQUIERDO
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-12 DERECHA
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-1 IZQUIERDA
Kv1 Kc1 KEMP
Kv1 1248.30 592.59 11.93
Kc1
K = Kv1 / Kc1
a = (0.5+k)/(2+k)
C-1 DERECHA
Kv5 Kc1 KEMP
1248.30 3.77 3.77
Kv5
K =Kv5 / Kc1
Kc1
a = (0.5+k)/(2+k)
C-2
Kv1 Kv2 Kc2
Kv1 Kv2 1248.30 980.80 949.22
Kc2 K =(Kv1+Kv2)/Kc2
a = (0.5+k)/(2+k)
C-2
Kv2 Kv3 Kc2
Kv2 Kv3 980.80 1248.30 949.22
Kc2 K =(Kv1+Kv2)/Kc2
a = (0.5+k)/(2+k)
C-3IZQUIERDA
Kv3 Kv4 Kc3
Kv3 Kv4 1248.30 1373.13 592.59
Kc3 K =(Kv3+Kv4)/Kc3
a = (0.5+k)/(2+k)
K =(Kv3+Kv4)/Kc3
a = (0.5+k)/(2+k)
C-3DERECHA
Kv4 Kv5 Kc3
Kv4 Kv5 1373.13 1248.30 592.59
Kc3 K =(Kv4+Kv5)/Kc3
a = (0.5+k)/(2+k)
SEGUNDO PISO:
C-1IZQUIERDA
Kv1 Kc1 KEMP
1248.30 446.61 14.86
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
C-1 DERECHA
Kv5 Kc1 KEMP
Kv5 1248.30 241.07 8.02
a = k/(2+k)
Kv5
C-2
Kv1 Kv2 Kc2
Kv1 Kv2 1248.30 980.80 761.90
K =∑Kvi / 2Kc2
Kc2
a = K/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-3IZQUIERDA
Kv3 Kv4 Kc3
Kv3 Kv4 1248.30 1373.13 446.61
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv3 Kv4
C-3DERECHA
Kv4 Kv5 Kc3
Kv4 Kv5 1373.13 1248.30 446.61
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4 Kv5
TERCER PISO
C-1IZQUIERDA
Kv1 Kc1 KEMP
1248.30 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
C-1 DERECHA
Kv5 Kc1 KEMP
Kv5 1248.30 241.07 8.02
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv5
C-2
Kv1 Kv2 Kc2
Kv1 Kv2 1248.30 980.80 446.61
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-3IZQUIERDA
Kv3 Kv4 Kc3
Kv3 Kv4 1248.30 1373.13 446.61
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv3 Kv4
C-3DERECHA
Kv4 Kv5 Kc3
Kv4 Kv5 1373.13 1248.30 241.07
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4 Kv5
CUARTO PISO
C-1IZQUIERDA
Kv1 Kc1 KEMP
1248.30 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
C-2
Kv1 Kv2 Kc2
Kv1 Kv2 1248.30 980.80 446.61
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-3IZQUIERDA
Kv3 Kv4 Kc3
Kv3 Kv4 1248.30 1373.13 446.61
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv3 Kv4
C-3DERECHA
Kv4 Kv"4 Kv5
Kv4 Kv"4 1373.13 5721.35 1248.30
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4 Kv5
QUINTO PISO
C-1IZQUIERDA
Kv1 Kc1 KEMP
1248.30 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
C-2
Kv1 Kv2 Kc2
Kv1 Kv2 1248.30 980.80 446.61
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-3IZQUIERDA
Kv3 Kv4 Kc3
Kv3 Kv4 1248.30 1373.13 446.61
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv3 Kv4
C-3DERECHA
Kv4 Kv"4 Kc3
Kv4 Kv"4 1373.13 5721.35 241.07
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4 Kv"4
PORTICOS 2-2
PRIMER PISO
C-4 IZQUIERDA
Kv1 Kc4 KEMP
Kv1 1040.25 592.59 11.93
Kc4
K = Kv1 / Kc4
a = (0.5+k)/(2+k)
C-4 DERECHA
Kv5 Kc4 KEMP
1040.25 347.37 6.99
Kv5
K =Kv5 / Kc4
Kc4
a = (0.5+k)/(2+k)
C-7
Kv1 Kv2 Kc7
Kv1 Kv2 1040.25 817.34 1446.76
Kc7 K =(Kv1+Kv2)/Kc7
a = (0.5+k)/(2+k)
C-7
Kv2 Kv3 Kc7
Kv2 Kv3 817.34 1040.25 1446.76
Kc7 K =(Kv2+Kv3)/Kc7
a = (0.5+k)/(2+k)
C-10 IZQUIERDA
Kv3 Kv4 Kc10
Kv3 Kv4 1040.25 1144.27 949.22
Kc10 K =(Kv3+Kv4)/Kc10
a = (0.5+k)/(2+k)
C-10DERECHA
Kv4 Kv5 Kc10
Kv4 Kv5 1144.27 1040.25 949.22
Kc10 K =(Kv4+Kv5)/Kc10
a = (0.5+k)/(2+k)
SEGUNDO PISO
C-4 IZQUIERDA
Kv1 Kc1 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1
C-4 DERECHA
Kv5 Kc4 KEMP
Kv5 1040.25 241.07 8.02
a = k/(2+k)
Kv5
C-7
Kv1 Kv2 Kc7
Kv1 Kv2 1040.25 817.34 1220.42
K =∑Kvi / 2Kc7
Kc7
a = K/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-10 IZQUIERDA
Kv3 Kv4 Kc10
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv3 Kv4
C-10 DERECHA
Kv4 Kv5 Kc10
Kv4 Kv5 1144.27 1040.25 761.90
K =∑Kvi / 2Kc10
a = k/(2+k)
Kv4 Kv5
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv4 Kv5
TERCER PISO
C-4 IZQUIERDA
Kv1 Kc4 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1
C-4 DERECHA
Kv5 Kc4 KEMP
Kv5 1040.25 241.07 8.02
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv5
C-7
Kv1 Kv2 Kc7
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-10 IZQUIERDA
Kv3 Kv4 Kc10
Kv3 Kv4 1040.25 1144.27 949.22
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv3 Kv4
C-10 DERECHA
Kv4 Kv5 Kc10
Kv4 Kv5 1144.27 1040.25 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv4 Kv5
K =∑Kvi / 2Kc10
a = k/(2+k)
Kv4 Kv5
CUARTO PISO
C-4 IZQUIERDA
Kv1 Kc4 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1
C-7
Kv1 Kv2 Kc7
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-10 IZQUIERDA
Kv3 Kv4 Kc10
Kv3 Kv4 1040.25 1144.27 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv3 Kv4
C-10 DERECHA
Kv4 Kv"4 Kv5
Kv4 Kv"4 1144.27 4767.80 1040.25
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv4 Kv5
QUINTO PISO
C-4 IZQUIERDA
Kv1 Kc4 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
K =∑Kvi / 2Kc4
a = k/(2+k)
Kv1
C-7
Kv1 Kv2 Kc7
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-10 IZQUIERDA
Kv3 Kv4 Kc10
Kv3 Kv4 1040.25 1144.27 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv3 Kv4
C-10 DERECHA
Kv4 Kv"4 Kc10
Kv4 Kv"4 1144.27 4767.80 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv4 Kv"4
PORTICOS 3-3
PRIMER PISO
C-5 IZQUIERDA
Kv1 Kc5 KEMP
Kv1 1040.25 592.59 11.93
Kc5
K = Kv1 / Kc5
a = (0.5+k)/(2+k)
C-5 DERECHA
Kv5 Kc5 KEMP
1040.25 347.37 6.99
Kv5
K =Kv5 / Kc5
Kc5
a = (0.5+k)/(2+k)
C-8
Kv1 Kv2 Kc8
Kv1 Kv2 1040.25 817.34 2118.20
Kc8 K =(Kv1+Kv2)/Kc5
a = (0.5+k)/(2+k)
C-8
Kv2 Kv3 Kc8
Kv2 Kv3 817.34 1040.25 2118.20
Kc8 K =(Kv2+Kv3)/Kc8
a = (0.5+k)/(2+k)
C-11 IZQUIERDA
Kv3 Kv4 Kc11
Kv3 Kv4 1040.25 1144.27 1446.76
Kc11 K =(Kv2+Kv3)/Kc11
a = (0.5+k)/(2+k)
C-11 DERECHA
Kv4 Kv5 Kc11
Kv4 Kv5 1144.27 1040.25 949.22
Kc11 K =(Kv4+Kv5)/Kc11
a = (0.5+k)/(2+k)
K =(Kv4+Kv5)/Kc11
a = (0.5+k)/(2+k)
SEGUNDO PISO
C-5 IZQUIERDA
Kv1 Kc5 KEMP
1040.25 761.90 25.35
Kv1
K =∑Kvi / 2Kc5
Kc5
a = k/(2+k)
Kv1
C-5 DERECHA
Kv5 Kc5 KEMP
Kv5 1040.25 241.07 8.02
a = k/(2+k)
Kv5
C-8
Kv1 Kv2 Kc8
Kv1 Kv2 1040.25 817.34 1220.42
K =∑Kvi / 2Kc8
Kc8
a = K/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-11 IZQUIERDA
Kv3 Kv4 Kc11
Kv3 Kv4 1040.25 1144.27 1220.42
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv3 Kv4
C-11 DERECHA
Kv4 Kv5 Kc11
Kv4 Kv5 1144.27 1040.25 761.90
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv4 Kv5
TERCER PISO
C-5 IZQUIERDA
Kv1 Kc5 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc5
Kc5
a = k/(2+k)
Kv1
C-5 DERECHA
Kv5 Kc5 KEMP
Kv5 1040.25 241.07 8.02
K =∑Kvi / 2Kc5
Kc5
a = k/(2+k)
Kv5
C-8
Kv1 Kv2 Kc8
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc8
Kc8
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-11 IZQUIERDA
Kv3 Kv4 Kc11
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv3 Kv4
C-11 DERECHA
Kv4 Kv5 Kc11
Kv4 Kv5 1144.27 1040.25 446.61
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv4 Kv5
CUARTO PISO
C-5 IZQUIERDA
Kv1 Kc5 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc5
Kc5
a = k/(2+k)
Kv1
C-8
Kv1 Kv2 Kc8
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc8
Kc8
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-11 IZQUIERDA
Kv3 Kv4 Kc11
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv3 Kv4
C-11 DERECHA
Kv4 Kv"4 Kv5
Kv4 Kv"4 1144.27 4767.80 1040.25
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv4 Kv5
QUINTO PISO
C-5 IZQUIERDA
Kv1 Kc5 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc5
Kc5
a = k/(2+k)
Kv1
C-8
Kv1 Kv2 Kc8
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc8
Kc8
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-11 IZQUIERDA
Kv3 Kv4 Kc11
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv3 Kv4
C-11 DERECHA
Kv4 Kv"4 Kc11
Kv4 Kv"4 1144.27 4767.80 446.61
K =∑Kvi / 2Kc11
Kc10
a = k/(2+k)
Kv4 Kv"4
PORTICOS 4-4
PRIMER PISO
C-6 IZQUIERDA
Kv1 Kc6 KEMP
Kv1 1040.25 949.22 19.10
Kc6
K = Kv1 / Kc6
a = (0.5+k)/(2+k)
C-6 DERECHA
Kv5 Kc6 KEMP
1040.25 347.37 6.99
Kv5
K =Kv5 / Kc6
Kc6
a = (0.5+k)/(2+k)
C-9
Kv1 Kv2 Kc9
Kv1 Kv2 1040.25 817.34 2118.20
Kc9 K =(Kv1+Kv2)/Kc9
a = (0.5+k)/(2+k)
C-9
Kv2 Kv3 Kc9
Kv2 Kv3 817.34 1040.25 2118.20
Kc9 K =(Kv2+Kv3)/Kc9
a = (0.5+k)/(2+k)
C-12 IZQUIERDA
Kv3 Kv4 Kc12
Kv3 Kv4 1040.25 1144.27 1446.76
Kc12 K =(Kv3+Kv4)/Kc12
a = (0.5+k)/(2+k)
C-12 DERECHA
Kv4 Kv5 Kc12
Kv4 Kv5 1144.27 1040.25 949.22
Kc12 K =(Kv4+Kv5)/Kc12
a = (0.5+k)/(2+k)
SEGUNDO PISO
C-6 IZQUIERDA
Kv1 Kc6 KEMP
1040.25 761.90 25.35
Kv1
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv1
C-6 DERECHA
Kv5 Kc6 KEMP
Kv5 1040.25 241.07 8.02
a = k/(2+k)
Kv5
C-9
Kv1 Kv2 Kc9
Kv1 Kv2 1040.25 817.34 1860.12
K =∑Kvi / 2Kc9
Kc8
a = K/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12 IZQUIERDA
Kv3 Kv4 Kc12
Kv3 Kv4 1040.25 1144.27 1220.42
K =∑Kvi / 2Kc12
Kc11
a = k/(2+k)
Kv3 Kv4
C-12 DERECHA
Kv4 Kv5 Kc12
Kv4 Kv5 1144.27 1040.25 761.90
K =∑Kvi / 2Kc12
Kc11
a = k/(2+k)
Kv4 Kv5
TERCER PISO
C-6 IZQUIERDA
Kv1 Kc6 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv1
C-6 DERECHA
Kv5 Kc6 KEMP
Kv5 1040.25 241.07 8.02
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv5
C-9
Kv1 Kv2 Kc9
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12 IZQUIERDA
Kv3 Kv4 Kc12
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4
C-12 DERECHA
Kv4 Kv5 Kc12
Kv4 Kv5 1144.27 1040.25 446.61
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv4 Kv5
CUARTO PISO
C-6 IZQUIERDA
Kv1 Kc6 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv1
C-9
Kv1 Kv2 Kc9
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12 IZQUIERDA
Kv3 Kv4 Kc12
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4
C-12 DERECHA
Kv4 Kv"4 Kv5
Kv4 Kv"4 1144.27 4767.80 1040.25
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv4 Kv5
QUINTO PISO
C-6 IZQUIERDA
Kv1 Kc6 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv1
C-9
Kv1 Kv2 Kc9
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv1
K =∑Kvi / 2Kc9
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12 IZQUIERDA
Kv3 Kv4 Kc12
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4
C-12 DERECHA
Kv4 Kv"4 Kc12
Kv4 Kv"4 1144.27 4767.80 446.61
K =∑Kvi / 2Kc1
Kc12
a = k/(2+k)
Kv4 Kv"4
PORTICOS A-A
PRIMER PISO
C-1
Kv1 Kc1 KEMP
Kv1 1000.00 592.59 11.93
Kc1
K = Kv1 / Kc1
a = (0.5+k)/(2+k)
C-1
Kv4 Kc1 KEMP
1000.00 592.59 11.93
Kv4
K =Kv4 / Kc1
Kc1
a = (0.5+k)/(2+k)
C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 592.59
Kc4 K =(Kv1+Kv2)/Kc4
a = (0.5+k)/(2+k)
C-5
Kv2 Kv3 Kc5
Kv2 Kv3 1125.00 750.00 949.22
Kc5 K =(Kv2+Kv3)/Kc5
a = (0.5+k)/(2+k)
K =(Kv2+Kv3)/Kc5
a = (0.5+k)/(2+k)
C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 949.22
Kc16 K =(Kv3+Kv4)/Kc6
a = (0.5+k)/(2+k)
SEGUNDO PISO
C-1
Kv1 Kc1 KEMP
1000.00 446.61 14.86
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
C-1
Kv4 Kc1 KEMP
Kv4 1000.00 446.61 14.86
a = k/(2+k)
Kv4
C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 446.61
K =∑Kvi / 2Kc4
Kc4
a = K/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 761.90
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4
TERCER PISO
C-1
Kv1 Kc1 KEMP
1000.00 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
C-1
Kv4 Kc1 KEMP
Kv4 1000.00 241.07 8.02
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv4
C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 446.61
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 446.61
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4
CUARTO PISO
C-1
Kv1 Kc1 KEMP
1000.00 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
C-1
Kv4 Kc1 KEMP
Kv4 1000.00 241.07 8.02
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv4
C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 446.61
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 446.61
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4
QUINTO PISO
C-1
Kv1 Kc1 KEMP
1000.00 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
C-1
Kv4 Kc1 KEMP
Kv4 1000.00 241.07 8.02
K =∑Kvi / 2Kc1
a = k/(2+k)
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv4
C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 446.61
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 446.61
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4
PRIMER PISO
C-2
Kv1 Kc2 KEMP
Kv1 578.70 949.22 19.10
Kc2
K = Kv1 / Kc2
a = (0.5+k)/(2+k)
C-2
Kv4 Kc2 KEMP
578.70 949.22 19.10
Kv4
K =Kv4 / Kc2
Kc2
a = (0.5+k)/(2+k)
C-7
Kv1 Kv2 Kc7
Kv1 Kv2 578.70 651.04 1446.76
Kc7 K =(Kv1+Kv2)/Kc7
a = (0.5+k)/(2+k)
C-8
Kv2 Kv3 Kc8
Kv2 Kv3 651.04 434.03 2118.20
Kc8 K =(Kv2+Kv3)/Kc8
a = (0.5+k)/(2+k)
C-9
Kv3 Kv4 Kc9
Kv3 Kv4 434.03 578.70 2118.20
Kc9 K =(Kv3+Kv4)/Kc9
a = (0.5+k)/(2+k)
SEGUNDO PISO
C-2
Kv1 Kc2 KEMP
578.70 761.90 25.35
Kv1
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
K =∑Kvi / 2Kc2
a = k/(2+k)
Kv1
C-2
Kv4 Kc2 KEMP
Kv4 578.70 761.90 25.35
a = k/(2+k)
Kv4
C-7
Kv1 Kv2 Kc7
Kv1 Kv2 578.70 651.04 1220.42
K =∑Kvi / 2Kc7
Kc7
a = K/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-9
Kv3 Kv4 Kc9
Kv3 Kv4 434.03 578.70 1860.12
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv3 Kv4
TERCER PISO
C-2
Kv1 Kc2 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1
C-2
Kv4 Kc2 KEMP
Kv4 578.70 446.61 14.86
K =∑Kvi / 2Kc2
a = k/(2+k)
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv4
C-7
Kv1 Kv2 Kc7
Kv1 Kv2 578.70 651.04 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-9
Kv3 Kv4 Kc9
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv3 Kv4
CUARTO PISO
C-2
Kv1 Kc2 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1
C-2
Kv4 Kc2 KEMP
Kv4 578.70 446.61 14.86
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv4
C-7
Kv1 Kv2 Kc7
Kv1 Kv2 578.70 651.04 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-9
Kv3 Kv4 Kc9
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv3 Kv4
QUINTO PISO
C-2
Kv1 Kc2 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1
C-2
Kv4 Kc2 KEMP
Kv4 578.70 446.61 14.86
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv4
C-7
Kv1 Kv2 Kc7
Kv1 Kv2 578.70 651.04 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-9
Kv3 Kv4 Kc9
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv3 Kv4
PORTICOS D-D :
PRIMER PISO
C-3
Kv1 Kc3 KEMP
Kv1 578.70 592.59 11.93
Kc3
K = Kv1 / Kc3
a = (0.5+k)/(2+k)
C-3
Kv4 Kc3 KEMP
578.70 592.59 11.93
Kv4
K =Kv4 / Kc3
Kc3
a = (0.5+k)/(2+k)
K =Kv4 / Kc3
Kc3
a = (0.5+k)/(2+k)
C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 949.22
Kc10 K =(Kv1+Kv2)/Kc10
a = (0.5+k)/(2+k)
C-11
Kv2 Kv3 Kc11
Kv2 Kv3 651.04 434.03 1446.76
Kc11 K =(Kv2+Kv3)/Kc11
a = (0.5+k)/(2+k)
C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 1446.76
Kc12 K =(Kv3+Kv4)/Kc12
a = (0.5+k)/(2+k)
SEGUNDO PISO
C-3
Kv1 Kc3 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1
C-3
Kv4 Kc3 KEMP
Kv4 578.70 446.61 14.86
a = k/(2+k)
Kv4
C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 761.90
K =∑Kvi / 2Kc10
a = K/(2+k)
Kv1 Kv2
K =∑Kvi / 2Kc10
Kc10
a = K/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 1220.42
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4
TERCER PISO
C-3
Kv1 Kc3 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1
C-3
Kv4 Kc3 KEMP
Kv4 578.70 446.61 14.86
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4
C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2
a = k/(2+k)
Kv2 Kv3
K =∑Kvi / 2Kc11
Kc11
Kv2 a = k/(2+k)
Kv3
C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4
CUARTO PISO
C-3
Kv1 Kc3 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1
C-3
Kv4 Kc3 KEMP
Kv4 578.70 446.61 14.86
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4
C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4
QUINTO PISO
C-3
Kv1 Kc3 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1
C-3
Kv4 Kc3 KEMP
Kv4 578.70 446.61 14.86
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4
C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4
PORTICOS E-E:
PRIMER PISO
C-3
Kv1 Kc3 KEMP
Kv1 578.70 592.59 11.93
Kc3
K = Kv1 / Kc3
a = (0.5+k)/(2+k)
C-3
Kv4 Kc3 KEMP
578.70 592.59 11.93
Kv4
K =Kv4 / Kc3
Kc3
a = (0.5+k)/(2+k)
C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 949.22
Kc10 K =(Kv1+Kv2)/Kc10
a = (0.5+k)/(2+k)
C-11
Kv2 Kv3 Kc11
Kv2 Kv3 651.04 434.03 949.22
Kc11 K =(Kv2+Kv3)/Kc11
a = (0.5+k)/(2+k)
K =(Kv2+Kv3)/Kc11
a = (0.5+k)/(2+k)
C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 949.22
Kc12 K =(Kv3+Kv4)/Kc12
a = (0.5+k)/(2+k)
SEGUNDO PISO
C-3
Kv1 Kc3 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1
C-3
Kv4 Kc3 KEMP
Kv4 578.70 446.61 14.86
a = k/(2+k)
Kv4
C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 761.90
K =∑Kvi / 2Kc10
Kc10
a = K/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3
K =∑Kvi / 2Kc12
a = k/(2+k)
Kv3 Kv4
TERCER PISO
C-3
Kv1 Kc3 KEMP
578.70 241.07 8.02
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1
C-3
Kv4 Kc3 KEMP
Kv4 578.70 241.07 8.02
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4
C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 446.61
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4
CUARTO PISO
C-3
Kv1 Kc3 KEMP
578.70 241.07 8.02
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1
C-3
Kv4 Kc3 KEMP
Kv4 578.70 241.07 8.02
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4
C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 446.61
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4
QUINTO PISO
C-3
Kv1 Kc3 KEMP
578.70 241.07 8.02
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1
C-3
Kv4 Kc3 KEMP
Kv4 578.70 241.07 8.02
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4
C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 446.61
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4
PORTICO F-F:
PRIMER PISO
C-1
Kv1 Kc1 KEMP
Kv1 1000.00 187.50 3.77
Kc1
K = Kv1 / Kc1
a = (0.5+k)/(2+k)
C-1
Kv4 Kc1 KEMP
1000.00 187.50 3.77
Kv4
K =Kv4 / Kc1
Kc1
a = (0.5+k)/(2+k)
C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 347.37
Kc4 K =(Kv1+Kv2)/Kc4
a = (0.5+k)/(2+k)
C-5
Kv2 Kv3 Kc5
Kv2 Kv3 1125.00 750.00 347.37
Kc5 K =(Kv2+Kv3)/Kc5
a = (0.5+k)/(2+k)
C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 347.37
Kc16 K =(Kv3+Kv4)/Kc6
a = (0.5+k)/(2+k)
SEGUNDO PISO
C-1
Kv1 Kc1 KEMP
1000.00 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
Kv1
C-1
Kv4 Kc1 KEMP
Kv4 1000.00 241.07 8.02
a = k/(2+k)
Kv4
C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 241.07
K =∑Kvi / 2Kc4
Kc4
a = K/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 241.07
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4
TERCER PISO
C-1
Kv1 Kc1 KEMP
1000.00 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
C-1
Kv4 Kc1 KEMP
Kv4 1000.00 241.07 8.02
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
K =∑Kvi / 2Kc1
a = k/(2+k)
Kv4
C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 241.07
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1 Kv2
Kv2 a = k/(2+k)
Kv3
C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 241.07
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4
m = 358.63ton m = 358.63ton
K = 277.87 K = 202.89
K = 275.24 K = 202.89
K = 297.00 K = 232.91
K = 387.96 K = 281.39
K = 344.51 K = 287.70
EJE Y-Y
S DE COLUMNAS EMPOTRADAS :
Kc (cm3) KEMP(tn/cm)
592.59 11.93
446.61 14.86
241.07 8.02
187.50 3.77
241.07 8.02
949.22 19.10
761.90 25.35
446.61 14.86
592.59 11.93
446.61 14.86
446.61 14.86
592.59 11.93
446.61 14.86
241.07 8.02
592.59 11.93
446.61 14.86
446.61 14.86
347.37 6.99
241.07 8.02
949.22 19.10
761.90 25.35
446.61 14.86
347.37 6.99
241.07 8.02
949.22 19.10
761.90 25.35
446.61 14.86
347.37 6.99
241.07 8.02
1446.76 29.12
1220.42 40.60
761.90 25.35
2118.20 42.63
1220.42 40.60
761.90 25.35
2118.20 42.63
1860.12 61.89
761.90 25.35
949.22 19.10
761.90 25.35
446.61 14.86
949.22 19.10
761.90 25.35
446.61 14.86
1446.76 29.12
1220.42 40.60
761.90 25.35
949.22 19.10
761.90 25.35
446.61 14.86
1446.76 29.12
1220.42 40.60
761.90 25.35
949.22 19.10
761.90 25.35
446.61 14.86
K a KC1 (tn/cm)
2.11 0.63 7.57
K a KC1 (tn/cm)
330.78 1.00 3.76
K a KC1 (tn/cm)
2.80 0.58 8.66
K a KC1 (tn/cm)
5.18 0.72 5.79
K a KC1 (tn/cm)
5.18 0.72 5.79
K a KC1 (tn/cm)
5.18 0.72 5.79
K a KC1 (tn/cm)
5.18 0.72 5.79
K a KC1 (tn/cm)
5.18 0.72 5.79
K a KC4 (tn/cm)
2.99 0.70 4.89
K a KC4 (tn/cm)
2.33 0.54 7.99
K a KC4 (tn/cm)
4.32 0.68 5.48
K a KC4 (tn/cm)
4.32 0.68 5.48
K a KC4 (tn/cm)
2.33 0.54 7.99
KEMP K a KC7 (tn/cm)
25.35 2.44 0.55 13.93
K a KC5 (tn/cm)
2.99 0.70 4.89
K a KC5 (tn/cm)
4.32 0.68 5.48
K a KC5 (tn/cm)
4.32 0.68 5.48
K a KC5 (tn/cm)
2.33 0.54 7.99
KEMP K a KC8 (tn/cm)
25.35 2.44 0.55 13.93
K a KC6 (tn/cm)
2.99 0.70 4.89
K a KC6 (tn/cm)
4.32 0.68 5.48
K a KC6 (tn/cm)
2.33 0.54 7.99
K a KC6 (tn/cm)
4.32 0.68 5.48
K a KC6 (tn/cm)
2.33 0.54 7.99
KEMP K a KC9 (tn/cm)
25.35 2.44 0.55 13.93
K a KC6 (tn/cm)
2.33 0.54 7.99
K a KC1 (tn/cm)
1.69 0.59 7.08
K a KC1 (tn/cm)
2.24 0.53 7.85
K a KC1 (tn/cm)
2.24 0.53 7.85
K a KC1 (tn/cm)
4.15 0.67 5.41
K a KC1 (tn/cm)
4.15 0.67 5.41
K a KC1 (tn/cm)
4.15 0.67 5.41
K a KC1 (tn/cm)
4.15 0.67 5.41
K a KC1 (tn/cm)
4.15 0.67 5.41
KEMP K a KC4 (tn/cm)
14.86 4.76 0.70 10.46
K a KC2 (tn/cm)
0.61 0.43 8.12
K a KC2 (tn/cm)
0.76 0.28 6.98
K a KC2 (tn/cm)
0.76 0.28 6.98
K a KC2 (tn/cm)
1.30 0.39 5.84
K a KC2 (tn/cm)
1.30 0.39 5.84
KEMP K a KC7 (tn/cm)
25.35 1.61 0.45 11.32
K a KC2 (tn/cm)
1.30 0.39 5.84
K a KC2 (tn/cm)
1.30 0.39 5.84
K a KC2 (tn/cm)
1.30 0.39 5.84
K a KC2 (tn/cm)
1.30 0.39 5.84
K a KC3 (tn/cm)
0.98 0.50 5.92
K a KC3 (tn/cm)
0.98 0.50 5.92
KEMP K a KC10 (tn/cm)
19.10 1.30 0.54 10.41
K a KC3 (tn/cm)
1.30 0.39 5.84
K a KC3 (tn/cm)
1.30 0.39 5.84
K a KC3 (tn/cm)
1.30 0.39 5.84
K a KC3 (tn/cm)
1.30 0.39 5.84
K a KC3 (tn/cm)
1.30 0.39 5.84
K a KC3 (tn/cm)
1.30 0.39 5.84
K a KC3 (tn/cm)
1.30 0.39 5.84
K a KC3 (tn/cm)
0.98 0.50 5.92
K a KC3 (tn/cm)
1.30 0.39 5.84
K a KC3 (tn/cm)
1.30 0.39 5.84
K a KC3 (tn/cm)
2.40 0.55 4.38
K a KC3 (tn/cm)
2.40 0.55 4.38
K a KC3 (tn/cm)
2.40 0.55 4.38
K a KC3 (tn/cm)
2.40 0.55 4.38
K a KC3 (tn/cm)
2.40 0.55 4.38
K a KC1 (tn/cm)
5.33 0.80 3.00
K a KC1 (tn/cm)
4.15 0.67 5.41
K a KC1 (tn/cm)
4.15 0.67 5.41
K a KC1 (tn/cm)
4.15 0.67 5.41
K a KC1 (tn/cm)
4.15 0.67 5.41
KEMP K a KC4 (tn/cm)
8.02 8.81 0.82 6.54
.89
m = 394.64 ton
.89
m = 485.51 ton
.91
m = 496.02 ton
.39
m = 507.98 ton
.70
LO DINAMICO Y-Y
BUR
DETERMINACION DE RIGIDEZ LATERAL POR EL M
DATOS :
MOMENTO DE INNERCIA
VIGAS SECCION Iv
V 101 30 65 686562.50
V 102 25 65 572135.42
V 103 25 50 260416.67
V 104 25 60 450000.00
C-3 DERECHA
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 30 30 67500.00 280
C-4
C-4 IZQUIERDO
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 35 35 125052.08 280
C-4 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-5
C-5 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-5 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-6
C-6 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-6 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-7
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-8
1 piso 55 55 762552.08 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-9
1 piso 55 55 762552.08 360
2 piso 50 50 520833.33 280
3,4,5 piso 40 40 213333.33 280
C-10
C-10 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-10 DERECHA
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-11
C-11 IZQUIERDO
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-11 DERECHA
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-12
C-12 IZQUIERDO
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-12 DERECHA
1 piso 50 45 379687.50 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
PORTICOS 1-1 Y 5-
PISO H 48xE/Hi 4*hi
1 360 28.98276 1440 PISO C-1 IZQUIERDA
2 280 37.2635486 1120 1 592.59
3 280 37.2635486 1120 2 446.61
4 280 37.2635486 1120 3 241.07
5 280 37.2635486 1120 4 241.07
5 241.07
PRIMER PISO
KL 55.4696448
KL2 60.3645123
KL3 45.9504969
KL4 43.8221821
QUINTO PISO
KL5 46.3641407
PORTICOS 2-2
PRIMER PISO
KL 54.9035942
SEGUNDO, TERCERO Y CUARTO PISO
KL2 49.0648321
KL3 44.1043594
KL4 48.2165029
QUINTO PISO
KL5 55.5829798
PORTICOS 3-3
PRIMER PISO
KL 63.2435378
KL2 51.3877505
KL3 45.9115183
KL4 50.7644871
QUINTO PISO
KL5 58.9965552
PORTICOS 4-4
PISO H 48xE/Hi 4*hi
1 360 28.98276 1440 PISO C-6 IZQUIERDA
2 280 37.2635486 1120 1 949.22
3 280 37.2635486 1120 2 761.90
4 280 37.2635486 1120 3 446.61
5 280 37.2635486 1120 4 446.61
5 446.61
PRIMER PISO
KL 63.5742669
KL2 54.3388278
KL3 45.9115183
KL4 50.7644871
QUINTO PISO
KL5 58.9965552
PORTICOS A-A
KL 42.8038797
KL2 40.2313604
KL3 33.4453783
KL4 33.4453783
QUINTO PISO
KL5 33.4453783
PRIMER PISO
KL 81.6197624
KL2 74.2361707
KL3 58.1016844
KL4 58.1016844
QUINTO PISO
KL5 58.1016844
PORTICOS D-D :
PRIMER PISO
KL 64.1833616
QUINTO PISO
KL5 54.7879709
PORTICOS E-E:
PRIMER PISO
^
KL 56.4823602
KL2 56.289711
KL3 41.2323299
KL4 41.2323299
QUINTO PISO
KL5 41.2323299
PORTICO F-F:
PISO H 48xE/Hi 4*hi Ic/
1 360 28.98276 1440 PISO C-1
2 280 37.2635486 1120 1 187.50
3 280 37.2635486 1120 2 241.07
3 241.07
PRIMER PISO
KL 22.2677442
SEGUNDO
KL2 25.4478938
TERCER PISO
KL5 26.0833611
m = 358.63ton m = 358.63ton
K = 266.30 K = 245.67
K = 237.39 K = 245.67
K = 227.83 K = 271.75
K = 275.52 K = 334.35
K = 292.66 K = 348.98
EJE Y-Y
ES DE COLUMNAS EMPOTRADAS :
Ic/L(cm3)
592.59
446.61
241.07
187.50
241.07
949.22
761.90
446.61
592.59
446.61
446.61
592.59
446.61
241.07
592.59
446.61
446.61
347.37
241.07
949.22
761.90
446.61
347.37
241.07
949.22
761.90
446.61
347.37
241.07
1446.76
1220.42
761.90
2118.20
1220.42
761.90
2118.20
1860.12
761.90
949.22
761.90
446.61
949.22
761.90
446.61
1446.76
1220.42
761.90
949.22
761.90
446.61
1446.76
1220.42
761.90
1054.69
761.90
446.61
Ic/Hi
C-1 DERECHA C-2 C-2 C-3 IZQUIERDA C-3 DERECHA SUMA(Ic/Hi)
187.50 949.22 949.22 360 592.59 3631.12
241.07 761.90 761.90 280 446.61 2938.11
241.07 446.61 446.61 280 241.07 1896.44
446.61 446.61 280 241.07 1655.37
446.61 446.61 280 241.07 1655.37
Ic/Hi
C-4 DERECHA C-7 C-7 C-10 IZQUIERDA C-10 DERECHA SUMA(Ic/Hi)
347.37 1446.76 1446.76 949.22 949.22 5731.92
241.07 1220.42 1220.42 761.90 761.90 4652.34
241.07 761.90 761.90 446.61 446.61 3104.72
761.90 761.90 446.61 446.61 2863.65
761.90 761.90 446.61 446.61 2863.65
Ic/Hi
C-5 DERECHA C-8 C-8 C-11 IZQUIERDA C-11 DERECHA SUMA(Ic/Hi)
347.37 2118.20 2118.20 1446.76 949.22 7928.96
241.07 1220.42 1220.42 1220.42 761.90 5426.15
241.07 761.90 761.90 761.90 446.61 3420.01
761.90 761.90 761.90 446.61 3178.94
761.90 761.90 761.90 446.61 3178.94
Ic/Hi
C-6 DERECHA C-9 C-9 C-12 IZQUIERDA C-12 DERECHA SUMA(Ic/Hi)
347.37 2118.20 2118.20 1446.76 1054.69 8034.43
241.07 1860.12 1860.12 1220.42 761.90 6705.54
241.07 761.90 761.90 761.90 446.61 3420.01
761.90 761.90 761.90 446.61 3178.94
761.90 761.90 761.90 446.61 3178.94
Ic/Hi
C-4 C-5 C-6 C-1 SUMA(Ic/Hi)
592.59 949.22 949.22 592.59 3676.22
446.61 761.90 761.90 446.61 2863.65
446.61 446.61 446.61 241.07 1821.99
446.61 446.61 446.61 241.07 1821.99
446.61 446.61 446.61 241.07 1821.99
Ic/Hi
C-7 C-8 C-9 C-2 SUMA(Ic/Hi)
1446.76 2118.20 2118.20 949.22 7581.60
1220.42 1220.42 1860.12 761.90 5824.78
761.90 761.90 761.90 446.61 3178.94
761.90 761.90 761.90 446.61 3178.94
761.90 761.90 761.90 446.61 3178.94
Ic/Hi
C-10 C-11 C-12 C-3 SUMA(Ic/Hi)
949.22 1446.76 1446.76 592.59 5027.92
761.90 1220.42 1220.42 446.61 4095.98
446.61 761.90 761.90 446.61 2863.65
446.61 761.90 761.90 446.61 2863.65
446.61 761.90 761.90 446.61 2863.65
Ic/Hi
C-10 C-11 C-12 C-3 SUMA(Ic/Hi)
949.22 949.22 1054.69 592.59 4138.31
761.90 761.90 761.90 446.61 3178.94
446.61 446.61 446.61 241.07 1821.99
446.61 446.61 446.61 241.07 1821.99
446.61 446.61 446.61 241.07 1821.99
Ic/Hi
C-4 C-5 C-6 C-1 SUMA(Ic/Hi)
347.37 347.37 347.37 187.50 1417.10
241.07 241.07 241.07 241.07 1205.36
241.07 241.07 241.07 241.07 1205.36
245.67
m = 358.63ton
7
m = 394.64 ton
7
m = 485.51 ton
5
m = 496.02 ton
5
m = 507.98 ton
DINAMICO Y-Y
METRADO DE CARGAS EN VIGAS
En el metrado se considera el peso de la losa y s/c para luego solo cargas las vigas en el programa etbas mas no la
PESOS UNITARIOS
CONCRETO ARMADO 2.4 tn/m3
LOSA ALIGERADA 0.3 tn/m2
PESO ACABADO 0.12 tn/m2
PESO TABIQUERIA 0.1 tn/m2
SOBRECARGA 0.2 tn/m2
PESOS
B(m) H(m) PESOS
V 101 0.30 0.65 0.468 tn/m3
V 102 0.25 0.65 0.390 tn/m4
V 103 0.25 0.60 0.360 tn/m5
V 104 0.25 0.50 0.300 tn/m6
0.25 x 0.50 m
1 2 3 4 5
EJE A
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.30 0.30
Carga de Losa 0.30 2.63 0.7875
Acabados 0.12 2.88 0.345
Tabiquería 0.10 2.88 0.2875
SUMA 1.72
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 2.88 0.575
0.25 x 0.60 m
1 2 3 4 5
EJE B
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.36 0.36
Carga de Losa 0.30 6.00 1.8
Acabados 0.12 6.25 0.75
Tabiquería 0.10 6.25 0.625
SUMA 3.54
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 6.25 1.25
0.25 x 0.60 m
1 2 3 4 5
EJE D
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.36 0.36
Carga de Losa 0.30 5.00 1.5
Acabados 0.12 5.25 0.63
Tabiquería 0.10 5.25 0.525
SUMA 3.02
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.25 1.05
0.25 x 65.00 m
1 2 3 4 5 6
EJE 1
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.39 0.39
Carga de Losa 0.30 2.13 0.6375
Acabados 0.12 2.38 0.285
Tabiquería 0.10 2.38 0.2375
SUMA 1.55
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 2.38 0.475
VIGA EJE 2
0.30 x 65.00 m
1 2 3 4 5 6
EJE 2
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.47 0.47
Carga de Losa 0.30 4.00 1.2
Acabados 0.12 4.25 0.51
Tabiquería 0.10 4.25 0.425
SUMA 2.60
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 4.25 0.85
VIGA EJE 3
0.30 x 65.00 m
1 2 3 4 5 6
EJE 3
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.47 0.47
Carga de Losa 0.30 4.75 1.425
Acabados 0.12 5.00 0.6
Tabiquería 0.10 5.00 0.5
SUMA 2.99
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.00 1
VIGA EJE 4
0.30 x 65.00 m
1 2 3 4 5 6
EJE 4
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.47 0.47
Carga de Losa 0.30 5.00 1.5
Acabados 0.12 5.25 0.63
Tabiquería 0.10 5.25 0.525
SUMA 3.12
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.25 1.05
0.25 x 0.50 m
1 2 3 4 5
EJE A
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.30 0.30
Carga de Losa 0.30 2.63 0.7875
Acabados 0.12 2.88 0.345
Tabiquería 0.10 2.88 0.2875
SUMA 1.72
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 2.88 0.575
0.25 x 0.60 m
1 2 3 4 5
EJE B
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.360 0.36
Carga de Losa 0.30 6.00 1.8
Acabados 0.12 6.25 0.75
Tabiquería 0.10 6.25 0.625
SUMA 3.54
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 6.25 1.25
0.25 x 0.60 m
1 2 3 4 5
EJE D
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.360 0.36
Carga de Losa 0.30 5.00 1.5
Acabados 0.12 5.25 0.63
Tabiquería 0.10 5.25 0.525
SUMA 3.02
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.25 1.05
0.25 x 65.00 m
1 2 3 4 5
EJE 1
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.390 0.39
Carga de Losa 0.30 2.13 0.6375
Acabados 0.12 2.38 0.285
Tabiquería 0.10 2.38 0.2375
SUMA 1.55
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 2.38 0.475
VIGA EJE 2
0.30 x 65.00 m
1 2 3 4 5
EJE 2
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.468 0.47
Carga de Losa 0.30 4.00 1.2
Acabados 0.12 4.25 0.51
Tabiquería 0.10 4.25 0.425
SUMA 2.60
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 4.25 0.85
VIGA EJE 3
0.30 x 65.00 m
1 2 3 4 5
EJE 3
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.468 0.47
Carga de Losa 0.30 4.75 1.425
Acabados 0.12 5.00 0.6
Tabiquería 0.10 5.00 0.5
SUMA 2.99
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.00 1
VIGA EJE 4
0.30 x 65.00 m
1 2 3 4 5
EJE 4
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.468 0.47
Carga de Losa 0.30 5.00 1.5
Acabados 0.12 5.25 0.63
Tabiquería 0.10 5.25 0.525
SUMA 3.12
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.25 1.05
n el programa etbas mas no la losa.
6
ANALISIS SIMICO ESTATICO
piso peso
1 507.98
2 496.02
3 485.51
4 394.64
5 358.63
suma 2242.78
V = ( Z.U.C.S / R ) . P
T = hn / Ct
Pi x hi / ∑ (Pi x
PISO Pi hi Pi x hi Fi Vi
hi)
68.63
68.62
61.31
129.94
57.78
187.72
41.13
228.84
23.72
252.56
3. COMBINACIONES DE CARGA.
U 1.4CM 1.7CV
U 1.25 (CM CV ) CS
U 0.9CM CS
Todas las combinaciones de carga generadas seran ingresadas al programa SAP 2000:
Comb 1 1.4 CM + 1.7 CV
Comb 21 1.25 ( CM + CV )+ SISMO X
Comb 22 1.25 ( CM + CV ) - SISMO X
Comb 23 0.90 CM + SISMO X
Comb 24 0.90 CM - SISMO X
Comb 25 1.25 ( CM + CV ) + SISMO Y
Comb 26 1.25 ( CM + CV ) - SISMO Y
Comb 27 0.90 CM + SISMO Y
Comb 28 0.90 CM - SISMO Y
Envolv x De todas las combinaciones referidas a x
Envolv y De todas las combinaciones referidas a y
COMO LAS DERIVAS DE PISO SON MAYORES QUE 0.007m ENTONCES AGREGAREMOS MUROS DE CORTE.
LOS MUROS DE CORTE SERAN DE 0.3M DE ESPESOR
COMUN
DESPLAZ. "X" "Y" "H(m)"
5to NIVEL 0.011061 -0.014394 2.8
4to NIVEL 0.008347 -0.010874 2.8
3er NIVEL 0.005664 -0.00746 2.8
2do NIVEL 0.003202 -0.004221 2.8
1er NIVEL 0.00123 -0.00162 3.6
Nota: Medidas en Metros
COMO LAS DERIVAS DE PISO SON MENORES QUE 0.007m ENTONCES CUMPLE CON
LOS REQUERIMIENTO QUE BRINDA LA NORMA E.030.