PREDIMENCIONAMIENTO DE COLUMNAS

Las especificaciones estan en el archivo word.

COLUMCA C-1

PRIMER PISO METRADO TOTAL(kg) C-1 LADO IZQUIERDO


PESO VIGA X-X 0.25x0.65x2400x2.75 1072.50 C-1 PESO
PESO DE VIGA Y-Y 0.25x0.5x2400x2.25 675.00 PRIMER PISO 39892.50
PESO DE LOSA 300x2.75x2.25 1856.25 SEGUNDO PISO 31530
PESO ACABADO 120x2.75x2.25 742.50 TERCER, CUARTO, QU23647.5
PESO TABIQUERIA 100x2.75x2.25 618.75
SOBRECARGA 200x2.75x2.25 1237.50 C-1 LADO DERECHO
COLUMNA 0.5X0.5X2400X3.6 2160.00 C-1 PESO
TOTAL: 8362.50 PRIMER PISO 24127.50
SEGUNDO, TETRCER P15765
SEGUNDO PISO METRADO TOTAL(kg)
PESO VIGA X-X 0.25x0.65x2400x2.75 1072.50
PESO DE VIGA Y-Y 0.25x0.5x2400x2.25 675.00
PESO DE LOSA 300x2.75x2.25 1856.25
PESO ACABADO 120x2.75x2.25 742.50
PESO TABIQUERIA 100x2.75x2.25 618.75
SOBRECARGA 200x2.75x2.25 1237.50
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 7882.50

COLUMNA C-2

PRIMER PISO METRADO TOTAL(kg) C-2


PESO VIGA X-X 0.25x0.65x2400x6.25 2437.50 C-2 PESO
PESO DE VIGA Y-Y 0.25x0.6x2400x2.25 810.00 PRIMER PISO 71805.00
PESO DE LOSA 300x6.25x2.25 4218.75 SEGHUNDO PISO 57060
PESO ACABADO 120x6.25x2.25 1687.50 TERCER, CUARTO, QU42795
PESO TABIQUERIA 100x6.25x2.25 618.75
SOBRECARGA 200x6.25x2.25 2812.50
COLUMNA 0.5X0.5X2400X3.6 2160.00
TOTAL: 14745.00

SEGUNDO PISO METRADO TOTAL(kg)


PESO VIGA X-X 0.25x0.65x2400x6.25 2437.50
PESO DE VIGA Y-Y 0.25x0.6x2400x2.25 810.00
PESO DE LOSA 300x6.25x2.25 4218.75
PESO ACABADO 120x6.25x2.25 1687.50
PESO TABIQUERIA 100x6.25x2.25 618.75
SOBRECARGA 200x6.25x2.25 2812.50
COLUMNA 0.5X0.5X2400X3.6 1680.00
TOTAL: 14265.00
COLUMNA C-3

PRIMER PISO METRADO TOTAL(kg) C-3 LADO IZQUIERDO


PESO VIGA X-X 0.25x0.65x2400x5.25 2047.50 C-3 PESO
PESO DE VIGA Y-Y 0.25x0.6x2400x2.25 810.00 PRIMER PISO 65692.50
PESO DE LOSA 300x5.25x2.25 3543.75 SEGHUNDO PISO 52170
PESO ACABADO 120x5.25x2.25 1417.50 TERCER, CUARTO, QU39127.5
PESO TABIQUERIA 100x5.25x2.25 1181.25
SOBRECARGA 200x5.25x2.25 2362.50 C-3 LADO DERECHO
COLUMNA 0.5X0.5X2400X3.6 2160.00 C-3 PESO
TOTAL: 13522.50 PRIMER PISO 59461.50
SEGHUNDO PISO 45939
SEGUNDO PISO METRADO TOTAL(kg) TERCER, CUARTO, QU32896.5
PESO VIGA X-X 0.25x0.65x2400x5.25 2047.50
PESO DE VIGA Y-Y 0.25x0.6x2400x2.25 810.00
PESO DE LOSA 300x5.25x2.25 3543.75
PESO ACABADO 120x5.25x2.25 1417.50
PESO TABIQUERIA 100x5.25x2.25 1181.25
SOBRECARGA 200x5.25x2.25 2362.50
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 13042.50

CUARTO PISO METRADO TOTAL(kg)


PESO VIGA X-X 0.25x0.65x2400x3.7 1443.00
PESO DE VIGA Y-Y 0.25x0.6x2400x2.25 810.00
PESO DE LOSA 300x3.7x2.25 2497.50
PESO ACABADO 120x3.7x2.25 999.00
PESO TABIQUERIA 100x3.7x2.25 832.50
SOBRECARGA 200x3.7x2.25 1665.00
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 9927.00

COLUMNA C-4

PRIMER PISO METRADO TOTAL(kg) C-4 LADO IZQUIERDO


PESO VIGA X-X 0.30x0.65x2400x2.75 1287.00 C-4 PESO
PESO DE VIGA Y-Y 0.25x0.5x2400x4.25 1275.00 PRIMER PISO 63765.00
PESO DE LOSA 300x2.75x4.25 3506.25 SEGHUNDO PISO 50628
PESO ACABADO 120x2.75x4.25 1402.50 TERCER, CUARTO, QU37971
PESO TABIQUERIA 100x2.75x4.25 1168.75
SOBRECARGA 200x2.75x4.25 2337.50 C-4 LADO DERECHO
COLUMNA 0.5X0.5X2400X3.6 2160.00 C-4 PESO
TOTAL: 13137.00 PRIMER PISO 38451.00
SEGHUNDO, TETRCER25314
SEGUNDO PISO METRADO TOTAL(kg)
PESO VIGA X-X 0.30x0.65x2400x2.75 1287.00
PESO DE VIGA Y-Y 0.25x0.5x2400x4.25 1275.00
PESO DE LOSA 300x2.75x4.25 3506.25
PESO ACABADO 120x2.75x4.25 1402.50
PESO TABIQUERIA 100x2.75x4.25 1168.75
SOBRECARGA 200x2.75x4.25 2337.50
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 12657.00

COLUMNA C-5

PRIMER PISO METRADO TOTAL(kg) C-5 LADO IZQUIERDO


PESO VIGA X-X 0.30x0.65x2400x2.75 1287.00 C-5 PESO
PESO DE VIGA Y-Y 0.25x0.5x2400x5 1500.00 PRIMER PISO 72315.00
PESO DE LOSA 300x2.75x5 4125.00 SEGHUNDO PISO 57468
PESO ACABADO 120x2.75x5 1650.00 TERCER, CUARTO, QU43101
PESO TABIQUERIA 100x2.75x5 1375.00
SOBRECARGA 200x2.75x5 2750.00 C-5 LADO DERECHO
COLUMNA 0.5X0.5X2400X3.6 2160.00 C-5 PESO
TOTAL: 14847.00 PRIMER PISO 43581.00
SEGUNDO, TETCER PI28734
SEGUNDO PISO METRADO TOTAL(kg)
PESO VIGA X-X 0.30x0.65x2400x2.75 1287.00
PESO DE VIGA Y-Y 0.25x0.5x2400x5 1500.00
PESO DE LOSA 300x2.75x5 4125.00
PESO ACABADO 120x2.75x5 1650.00
PESO TABIQUERIA 100x2.75x5 1375.00
SOBRECARGA 200x2.75x5 2750.00
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 14367.00

COLUMNA C-6

PRIMER PISO METRADO TOTAL(kg) C-6 LADO IZQUIERDO


PESO VIGA X-X 0.30x0.65x2400x2.75 1287.00 C-6 PESO
PESO DE VIGA Y-Y 0.25x0.5x2400x5.25 1575.00 PRIMER PISO 75165.00
PESO DE LOSA 300x2.75x5.25 4331.25 SEGHUNDO PISO 59748
PESO ACABADO 120x2.75x5.25 1732.50 TERCER, CUARTO, QU44811
PESO TABIQUERIA 100x2.75x5.25 1443.75
SOBRECARGA 200x2.75x5.25 2887.50 C-6 LADO DERECHO
COLUMNA 0.5X0.5X2400X3.6 2160.00 C-6 PESO
TOTAL: 15417.00 PRIMER PISO 45291.00
SEGUNDO, TETCER PI29874
SEGUNDO PISO METRADO TOTAL(kg)
PESO VIGA X-X 0.30x0.65x2400x2.75 1287.00
PESO DE VIGA Y-Y 0.25x0.5x2400x5.25 1575.00
PESO DE LOSA 300x2.75x5.25 4331.25
PESO ACABADO 120x2.75x5.25 1732.50
PESO TABIQUERIA 100x2.75x5.25 1443.75
SOBRECARGA 200x2.75x5.25 2887.50
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 14937.00

COLUMNA C-7

PRIMER PISO METRADO TOTAL(kg) C-7


PESO VIGA X-X 0.30x0.65x2400x6.25 2925.00 C-7 PESO
PESO DE VIGA Y-Y 0.25x0.6x2400x4.25 1530.00 PRIMER PISO 126780.00
PESO DE LOSA 300x6.25x4.25 7968.75 SEGHUNDO PISO 101040
PESO ACABADO 120x6.25x4.25 3187.50 TERCER, CUARTO, QU75780
PESO TABIQUERIA 100x6.25x4.25 2656.25
SOBRECARGA 200x6.25x4.25 5312.50
COLUMNA 0.5X0.5X2400X3.6 2160.00
TOTAL: 25740.00

SEGUNDO PISO METRADO TOTAL(kg)


PESO VIGA X-X 0.30x0.65x2400x6.25 2925.00
PESO DE VIGA Y-Y 0.25x0.6x2400x4.25 1530.00
PESO DE LOSA 300x6.25x4.25 7968.75
PESO ACABADO 120x6.25x4.25 3187.50
PESO TABIQUERIA 100x6.25x4.25 2656.25
SOBRECARGA 200x6.25x4.25 5312.50
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 25260.00

COLUMNA C-8

PRIMER PISO METRADO TOTAL(kg) C-8


PESO VIGA X-X 0.30x0.65x2400x6.25 2925.00 C-8 PESO
PESO DE VIGA Y-Y 0.25x0.6x2400x5 1800.00 PRIMER PISO 145005.00
PESO DE LOSA 300x6.25x5 9375.00 SEGHUNDO PISO 115620
PESO ACABADO 120x6.25x5 3750.00 TERCER, CUARTO, QU86715
PESO TABIQUERIA 100x6.25x5 3125.00
SOBRECARGA 200x6.25x5 6250.00
COLUMNA 0.5X0.5X2400X3.6 2160.00
TOTAL: 29385.00

SEGUNDO PISO METRADO TOTAL(kg)


PESO VIGA X-X 0.30x0.65x2400x6.25 2925.00
PESO DE VIGA Y-Y 0.25x0.6x2400x5 1800.00
PESO DE LOSA 300x6.25x5 9375.00
PESO ACABADO 120x6.25x5 3750.00
PESO TABIQUERIA 100x6.25x5 3125.00
SOBRECARGA 200x6.25x5 6250.00
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 28905.00

COLUMNA C-9
PRIMER PISO METRADO TOTAL(kg) C-9
PESO VIGA X-X 0.30x0.65x2400x6.25 2925.00 C-9 PESO
PESO DE VIGA Y-Y 0.25x0.6x2400x5.25 1890.00 PRIMER PISO 151080.00
PESO DE LOSA 300x6.25x5.25 9843.75 SEGHUNDO PISO 120480
PESO ACABADO 120x6.25x5.25 3937.50 TERCER, CUARTO, QU90360
PESO TABIQUERIA 100x6.25x5.25 3281.25
SOBRECARGA 200x6.25x5.25 6562.50
COLUMNA 0.5X0.5X2400X3.6 2160.00
TOTAL: 30600.00

SEGUNDO PISO METRADO TOTAL(kg)


PESO VIGA X-X 0.30x0.65x2400x6.25 2925.00
PESO DE VIGA Y-Y 0.25x0.6x2400x5.25 1890.00
PESO DE LOSA 300x6.25x5.25 9843.75
PESO ACABADO 120x6.25x5.25 3937.50
PESO TABIQUERIA 100x6.25x5.25 3281.25
SOBRECARGA 200x6.25x5.25 6562.50
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 30120.00

COLUMNA C-10

PRIMER PISO METRADO TOTAL(kg) C-10 LADO IZQUIERDO


PESO VIGA X-X 0.30x0.65x2400x5.25 2457.00 C-10 PESO
PESO DE VIGA Y-Y 0.25x0.6x2400x4.25 1530.00 PRIMER PISO 109140.00
PESO DE LOSA 300x5.25x4.25 6693.75 SEGHUNDO PISO 86928
PESO ACABADO 120x5.25x4.25 2677.50 TERCER, CUARTO, QU65196
PESO TABIQUERIA 100x5.25x4.25 2231.25
SOBRECARGA 200x5.25x4.25 4462.50
COLUMNA 0.5X0.5X2400X3.6 2160.00 C-10 LADO DERECHO
TOTAL: 22212.00 C-10 PESO
PRIMER PISO 98517.70
SEGUNDO PISO METRADO TOTAL(kg) SEGHUNDO PISO 76305.7
PESO VIGA X-X 0.30x0.65x2400x5.25 2457.00 TERCER, CUARTO, QU54573.7
PESO DE VIGA Y-Y 0.25x0.6x2400x4.25 1530.00
PESO DE LOSA 300x5.25x4.25 6693.75
PESO ACABADO 120x5.25x4.25 2677.50
PESO TABIQUERIA 100x5.25x4.25 2231.25
SOBRECARGA 200x5.25x4.25 4462.50
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 21732.00

CUARTO PISO METRADO TOTAL(kg)


PESO VIGA X-X 0.30x0.65x2400x3.7 1731.60
PESO DE VIGA Y-Y 0.25x0.6x2400x4.25 1530.00
PESO DE LOSA 300x3.7x4.25 4717.50
PESO ACABADO 120x3.7x4.25 2044.25
PESO TABIQUERIA 100x3.7x4.25 1572.50
SOBRECARGA 200x3.7x4.25 3145.00
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 16420.85

COLUMNA C-11

PRIMER PISO METRADO TOTAL(kg) C-11 LADO IZQUIERDO


PESO VIGA X-X 0.30x0.65x2400x5.25 2457.00 C-11 PESO
PESO DE VIGA Y-Y 0.25x0.6x2400x5 1800.00 PRIMER PISO 124665.00
PESO DE LOSA 300x5.25x5 7875.00 SEGHUNDO PISO 99348
PESO ACABADO 120x5.25x5 3150.00 TERCER, CUARTO, QU74511
PESO TABIQUERIA 100x5.25x5 2625.00
SOBRECARGA 200x5.25x5 5250.00
COLUMNA 0.5X0.5X2400X3.6 2160.00 C-11 LADO DERECHO
TOTAL: 25317.00 C-11 PESO
PRIMER PISO 112054.20
SEGUNDO PISO METRADO TOTAL(kg) SEGHUNDO PISO 86737.2
PESO VIGA X-X 0.30x0.65x2400x5.25 2457.00 TERCER, CUARTO, QU61900.2
PESO DE VIGA Y-Y 0.25x0.6x2400x5 1800.00
PESO DE LOSA 300x5.25x5 7875.00
PESO ACABADO 120x5.25x5 3150.00
PESO TABIQUERIA 100x5.25x5 2625.00
SOBRECARGA 200x5.25x5 5250.00
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 24837.00

CUARTO PISO METRADO TOTAL(kg)


PESO VIGA X-X 0.30x0.65x2400x3.7 1731.60
PESO DE VIGA Y-Y 0.25x0.6x2400x5 1800.00
PESO DE LOSA 300x3.7x5 5550.00
PESO ACABADO 120x3.7x5 2220.00
PESO TABIQUERIA 100x3.7x5 1850.00
SOBRECARGA 200x3.7x5 3700.00
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 18531.60

COLUMNA C-12

PRIMER PISO METRADO TOTAL(kg) C-12 LADO IZQUIERDO


PESO VIGA X-X 0.30x0.65x2400x5.25 2457.00 C-12 PESO
PESO DE VIGA Y-Y 0.25x0.6x2400x5.25 1890.00 PRIMER PISO 129840.00
PESO DE LOSA 300x5.25x5.25 8268.75 SEGHUNDO PISO 103488
PESO ACABADO 120x5.25x5.25 3307.50 TERCER, CUARTO, QU77616
PESO TABIQUERIA 100x5.25x5.25 2756.25
SOBRECARGA 200x5.25x5.25 5512.50
COLUMNA 0.5X0.5X2400X3.6 2160.00 C-12 LADO DERECHO
TOTAL: 26352.00 C-12 PESO
PRIMER PISO 116671.20
SEGUNDO PISO METRADO TOTAL(kg) SEGHUNDO PISO 90319.2
PESO VIGA X-X 0.30x0.65x2400x5.25 2457.00 TERCER, CUARTO, QU64447.2
PESO DE VIGA Y-Y 0.25x0.6x2400x5.25 1890.00
PESO DE LOSA 300x5.25x5.25 8268.75
PESO ACABADO 120x5.25x5.25 3307.50
PESO TABIQUERIA 100x5.25x5.25 2756.25
SOBRECARGA 200x5.25x5.25 5512.50
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 25872.00

CUARTO PISO METRADO TOTAL(kg)


PESO VIGA X-X 0.30x0.65x2400x3.7 1731.60
PESO DE VIGA Y-Y 0.25x0.6x2400x5.25 1890.00
PESO DE LOSA 300x3.7x5.25 5827.50
PESO ACABADO 120x3.7x5.25 2331.00
PESO TABIQUERIA 100x3.7x5.25 1942.50
SOBRECARGA 200x3.7x5.25 3885.00
COLUMNA 0.5X0.5X2400X2.8 1680.00
TOTAL: 19287.60

RESUMENES DE COLUMNAS(UNIFORMIZANDO LAS COLUMNAS DE SECCION SEMEJANTES)

las columnas con igual dimension seran::

COLUMNA FINAL COLUMAS IGUALES PISO


C-1 C-1 IZQUIERDA = C3 DERECHO
PISO 1
PISO 2
PISO 3, 4 y 5
C-2 C-1 LADO DERECHO
PISO 1
PISO 2 Y 3
C-3 C-2=C-5,C-6,C-10(IZQUIERDO)=C-10,C-11,C-12(DERECHO)
PISO 1
PISO 2
PISO 3, 4 y 5
C-4 C-4, C3( IZQUIERDO )
PISO 1
PISO 2
PISO 3, 4 y 5
C-5 C-4, C-5, C-6 (DERECHOS)
PISO 1
PISO 2 Y 3
C-6 C-7 = C-11, C-12 (IZQUIERDO)
PISO 1
PISO 2
PISO 3, 4 y 5
C-7 C-8
PISO 1
PISO 2
PISO 3, 4 y 5
C-8 C-9
PISO 1
PISO 2
PISO 3, 4 y 5

DISTRIBUCION DE COLUMNAS FINALES:


1 LADO IZQUIERDO
AREA(cm2) BxH(m)
1424.7 0.40X0.40
1126.1 0.35X0.35
844.6 0.30X0.30

-1 LADO DERECHO
AREA(cm2) BxH(m)
861.7 0.30X0.30
563.0 0.30X0.30

C-2
AREA(cm2) BxH(m)
1709.6 0.45X0.45
1358.6 0.40X0.40
1018.9 0.35X0.35
3 LADO IZQUIERDO
AREA(cm2) BxH(m)
1564.1 0.40X0.40
1242.1 0.35X0.35
931.6 0.35X0.35

-3 LADO DERECHO
AREA(cm2) BxH(m)
1415.8 0.40X0.40
1093.8 0.35X0.35
783.3 0.30X0.30

4 LADO IZQUIERDO
AREA(cm2) BxH(m)
1518.2 0.40X0.40
1205.4 0.35X0.35
904.1 0.35X0.35

-4 LADO DERECHO
AREA(cm2) BxH(m)
915.5 0.35X0.35
602.7 0.30X0.30
5 LADO IZQUIERDO
AREA(cm2) BxH(m)
1721.8 0.45X0.45
1368.3 0.40X0.40
1026.2 0.35X0.35

-5 LADO DERECHO
AREA(cm2) BxH(m)
1037.6 0.35X0.35
684.1 0.30X0.30

6 LADO IZQUIERDO
AREA(cm2) BxH(m)
1789.6 0.45X0.45
1422.6 0.40X0.40
1066.9 0.35X0.35

-6 LADO DERECHO
AREA(cm2) BxH(m)
1078.4 0.35X0.35
711.3 0.30X0.30
C-7
AREA(cm2) BxH(m)
2213.6 0.50X0.50
1764.2 0.45X0.45
1323.1 0.40X0.40

C-8
AREA(cm2) BxH(m)
2531.8 0.55X0.55
2018.8 0.45X0.45
1514.1 0.40X0.40
C-9
AREA(cm2) BxH(m)
2637.9 0.55X0.55
2103.6 0.50X0.50
1577.7 0.40X0.40

0 LADO IZQUIERDO
AREA(cm2) BxH(m)
1905.6 0.45X0.45
1517.8 0.40X0.40
1138.3 0.35X0.35

10 LADO DERECHO
AREA(cm2) BxH(m)
1720.2 0.45X0.45
1332.3 0.40X0.40
952.9 0.35X0.35
1 LADO IZQUIERDO
AREA(cm2) BxH(m)
2176.7 0.50X0.50
1734.6 0.45X0.45
1301.0 0.40X0.40

11 LADO DERECHO
AREA(cm2) BxH(m)
1956.5 0.45X0.45
1514.5 0.40X0.40
1080.8 0.35X0.35

2 LADO IZQUIERDO
AREA(cm2) BxH(m)
2267.0 0.50X0.50
1806.9 0.45X0.45
1355.2 0.40X0.40

12 LADO DERECHO
AREA(cm2) BxH(m)
2037.1 0.45X0.45
1577.0 0.40X0.40
1125.3 0.35X0.35

EMEJANTES)

BxH(m)

0.40X0.40
0.35X0.35
0.30X0.30

0.30X0.30
0.30X0.30

0.45X0.45
0.40X0.40
0.35X0.35

0.40X0.40
0.35X0.35
0.35X0.35

0.35X0.35
0.30X0.30

0.50X0.50
0.45X0.45
0.40X0.40
0.55X0.55
0.45X0.45
0.40X0.40

0.55X0.55
0.50X0.50
0.40X0.40
METRADO DE CARGAS POR SISMO

PRIMER PISO METRADO TOTAL (ton)


PESO VIGAS EN X-X
VIGA 101 0.30*0.65*28.5*3*2.4 40.01
VIGA 102 0.25*0.65*28.5*2*2.4 22.23
PESO DE VIGA Y-Y
VIGA 103 0.25x0.60x19x4x2.4 54.72
VIGA 104 0.25x0.50x19x2x2.4 11.40
PESO DE LOSA 0.3x541.5 162.45
PESO ACABADO 0.12x541.5 64.98
PESO TABIQUERIA 0.1x541.5 54.15
SOBRECARGA 0.2x541.5x0.25 27.08
COLUMNA C-1 (0.4x0.4+0.30x0.30)x3.2x2x2.4 3.84
COLUMNA C-2 0.45x0.45x3.2x4x2.4 6.22
COLUMNA C-3 (0.4x0.4+0.4x0.4)x3.2x2x2.4 4.92
COLUMNA C-4 (0.4x0.4+0.35x0.35)x3.2x2.4 2.17
COLUMNA C-5 (0.45x0.45+0.35x0.35)x3.2x2.4 2.50
COLUMNA C-6 (0.45x0.45+0.35x0.35)x3.2x2.4 2.50
COLUMNA C-7 0.5x0.5x3.2x2x2.4 3.84
COLUMNA C-8 0.55x0.55x3.2x2x2.4 2.32
COLUMNA C-9 0.55x0.55x3.2x2x2.4 4.65
COLUMNA C-10 (0.45x0.45+0.45x0.45)x3.2x2.4 3.11
COLUMNA C-11 (0.5x0.5+0.45x0.45)x3.2x2.4 3.48
COLUMNA C-12 (0.50x0.50+0.45x0.45)x3.2x2.4 3.48
MURO FACHADA 1.4x0.15x2.8x47.5 27.93
TOTAL: 507.98

SEGUNDO PISO METRADO TOTAL (ton)


PESO VIGAS EN X
VIGA 101 0.30*0.65*28.5*3*2.4 40.01
VIGA 102 0.25*0.65*28.5*2*2.4 22.23
PESO DE VIGA Y-Y
VIGA 103 0.25x0.60x19x4x2.4 54.72
VIGA 104 0.25x0.50x19x2x2.4 11.40
PESO DE LOSA 0.3x541.5 162.45
PESO ACABADO 0.12x541.5 64.98
PESO TABIQUERIA 0.1x541.5 54.15
SOBRECARGA 0.2x541.5x0.25 27.08
COLUMNA C-1 (0.35x0.35+0.3x0.3)x2.8x2x2.4 2.86
COLUMNA C-2 0.4x0.4x2.8x4x2.4 4.30
COLUMNA C-3 (0.35x0.35+0.35x0.35)x2.8x2x2.4 3.29
COLUMNA C-4 (0.35x0.35+0.3x0.3)x2.8x2.4 1.43
COLUMNA C-5 (0.4x0.4+0.3x0.3)x2.8x2.4 1.68
COLUMNA C-6 (0.4x0.4+0.3x0.3)x2.8x2.4 1.68
COLUMNA C-7 0.45x0.45x2.8x2x2.4 2.72
COLUMNA C-8 0.45x0.45x2.8x2x2.4 2.72
COLUMNA C-9 0.5x0.5x2.8x2x2.4 3.36
COLUMNA C-10 (0.4x0.4+0.4x0.4)x2.8x2.4 2.15
COLUMNA C-11 (0.45x0.45+0.4x0.4)x2.8x2.4 2.44
COLUMNA C-12 (0.45x0.45+0.4x0.4)x2.8x2.4 2.44
MURO FACHADA 1.4x0.15x2.8x47.5 27.93
TOTAL: 496.02

TERCER PISO METRADO TOTAL (ton)


PESO VIGAS EN X
VIGA 101 0.30*0.65*28.5*3*2.4 40.01
VIGA 102 0.25*0.65*28.5*2*2.4 22.23
PESO DE VIGA Y-Y
VIGA 103 0.25x0.60x19x4x2.4 54.72
VIGA 104 0.25x0.50x19x2x2.4 11.40
PESO DE LOSA 0.3x541.5 162.45
PESO ACABADO 0.12x541.5 64.98
PESO TABIQUERIA 0.1x541.5 54.15
SOBRECARGA 0.2x541.5x0.25 27.08
COLUMNA C-1 (0.3x0.3x2.8+0.3x0.3x1.4)x2x2.4 1.81
COLUMNA C-2 0.35x0.35x2.8x4x2.4 3.29
COLUMNA C-3 (0.35x0.35+0.3x0.3)x2.8x2x2.4 2.86
COLUMNA C-4 (0.35x0.35x2.8+0.3x0.3x1.4)x2.4 1.13
COLUMNA C-5 (0.35x0.35x2.8+0.3x0.3x1.4)x2.4 1.13
COLUMNA C-6 (0.35x0.35x2.8+0.3x0.3x1.4)x2.4 1.13
COLUMNA C-7 0.4x0.4x2.8x2x2.4 2.15
COLUMNA C-8 0.4x0.4x2.8x2x2.4 2.15
COLUMNA C-9 0.4x0.4x2.8x2x2.4 2.15
COLUMNA C-10 (0.35x0.35+0.35x0.35)x2.8x2.4 1.65
COLUMNA C-11 (0.4x0.4+0.35x0.35)x2.8x2.4 1.90
COLUMNA C-12 (0.45x0.45+0.4x0.4)x2.8x2.4 2.44
MURO FACHADA 1.4x0.15x2.8x42 24.70
TOTAL: 485.51

CUARTO PISO METRADO TOTAL (ton)


PESO VIGAS EN X
VIGA 101 0.30*0.65*24.2*3*2.4 33.98
VIGA 102 0.25*0.65*24.2*2*2.4 18.88
PESO DE VIGA Y-Y
VIGA 103 0.25x0.60x19x4x2.4 27.36
VIGA 104 0.25x0.50x19x1x2.4 5.70
PESO DE LOSA 0.3x459.8 137.94
PESO ACABADO 0.12x459.8 55.18
PESO TABIQUERIA 0.1x459.8 45.98
SOBRECARGA 0.2x459.8 x0.25 22.99
COLUMNA C-1 0.3x0.3x2.8x2x2.4 1.21
COLUMNA C-2 0.35x0.35x2.8x4x2.4 3.30
COLUMNA C-3 (0.35x0.35+0.3x0.3)x2.8x2x2.4 2.86
COLUMNA C-4 (0.35x0.35)x2.8x2.4 0.82
COLUMNA C-5 (0.35x0.35)x2.8x2.4 0.82
COLUMNA C-6 (0.35x0.35)x2.8x2.4 0.82
COLUMNA C-7 0.4x0.4x2.8x2x2.4 2.15
COLUMNA C-8 0.4x0.4x2.8x2x2.4 2.15
COLUMNA C-9 0.4x0.4x2.8x2x2.4 2.15
COLUMNA C-10 0.35x0.35x2.8x2x2.4 1.15
COLUMNA C-11 (0.4x0.4+0.35x0.35)x2.8x2.4 1.90
COLUMNA C-12 (0.4x0.4+0.35x0.35)x2.8x2.4 1.90
MURO FACHADA 1.4x0.15x2.8x43.2 25.40
TOTAL: 394.64

QUINTO PISO METRADO TOTAL (ton)


PESO VIGAS EN X
VIGA 101 0.30*0.65*24.2*3*2.4 33.98
VIGA 102 0.25*0.65*24.2*2*2.4 18.88
PESO DE VIGA Y-Y
VIGA 103 0.25x0.60x19x4x2.4 27.36
VIGA 104 0.25x0.50x19x1x2.4 5.70
PESO DE LOSA 0.3x459.8 137.94
PESO ACABADO 0.12x459.8 55.18
PESO TABIQUERIA 0.1x459.8 45.98
SOBRECARGA 0.2x459.8 x0.25 22.99
COLUMNA C-1 0.3x0.3x1.4x2x2.4 0.61
COLUMNA C-2 0.35x0.35x1.4x4x2.4 1.65
COLUMNA C-3 (0.35x0.35+0.3x0.3)x1.4x2x2.4 1.43
COLUMNA C-4 (0.35x0.35)x1.4x2.4 0.41
COLUMNA C-5 (0.35x0.35)x1.4x2.4 0.41
COLUMNA C-6 (0.35x0.35)x1.4x2.4 0.41
COLUMNA C-7 0.4x0.4x1.4x2x2.4 1.08
COLUMNA C-8 0.4x0.4x1.4x2x2.4 1.08
COLUMNA C-9 0.4x0.4x1.4x2x2.4 1.08
COLUMNA C-10 0.35x0.35x1.4x2x2.4 0.58
COLUMNA C-11 (0.4x0.4+0.35x0.35)x1.4x2.4 0.95
COLUMNA C-12 (0.4x0.4+0.35x0.35)x1.4x2.4 0.95
TOTAL: 358.63
DETERMINACION DE RIGIDEZ LATERAL POR EL ME

DATOS :

SIMBOLO VALOR UNIDAD


E 217 Tn/cm2
VIGA 101 30x65 m2
VIGA 102 25x65 m2
VIGA 103 25x50 m2
VIGA 104 25x60 m2

MOMENTO DE INNERCIA
VIGAS SECCION I
V 101 30 65 686562.50
V 102 25 65 572135.42
V 103 25 60 450000.00
V 104 25 50 260416.67

RIGIDECES DE LAS VIGAS:

EJE X-X EJE Y-Y

PARA PORTICOS 1-1 Y 5-5 PARA PORTICOS A-A Y


VIGAS Iv(cm4) L(cm) K v(cm3) VIGAS
V1 686562.50 550 1248.30 V1
V2 686562.50 700 980.80 V2
V3 686562.50 550 1248.30 V3
V4 686562.50 500 1373.13 V4
V5 686562.50 550 1248.30
V"4 686562.50 120 5721.35

PARA PORTICOS 2-2, 3-3 Y 4-4 PARA PORTICOS B-B, C-C, D


VIGAS Iv(cm4) L(cm) K v(cm3) VIGAS
V1 572135.42 550 1040.25 V1
V2 572135.42 700 817.34 V2
V3 572135.42 550 1040.25 V3
V4 572135.42 500 1144.27 V4
V5 572135.42 550 1040.25
V"4 572135.42 120 4767.80

RIGIDECES LATERALES DE COLUMNAS Y CALCULO DE LAS RIGIDECES DE COLUMNAS EMPOTRAD

COLUMNAS SECCION Ic(cm4) ALTURA(cm)


C-1
C-1 IZQUIERDA
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 30 30 67500.00 280
C-1 DERECHA
1 piso 30 30 67500.00 360
2,3 piso 30 30 67500.00 280
C-2
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-3
C-3 IZQUIERDA
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 35 35 125052.08 280

C-3 DERECHA
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 30 30 67500.00 280
C-4
C-4 IZQUIERDO
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 35 35 125052.08 280
C-4 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-5
C-5 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-5 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-6
C-6 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-6 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-7
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-8
1 piso 55 55 762552.08 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-9
1 piso 55 55 762552.08 360
2 piso 50 50 520833.33 280
3,4,5 piso 40 40 213333.33 280
C-10
C-10 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-10 DERECHA
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-11
C-11 IZQUIERDO
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-11 DERECHA
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-12
C-12 IZQUIERDO
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-12 DERECHA
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280

CALCULO DE RIGIDEZ LATERAL DE COLUMNAS EJE X-X:

PORTICOS 1-1 Y 5-5:


PRIMER PISO:

C-1 IZQUIERDA
Kv1 Kc1 KEMP
Kv1 1248.30 592.59 11.93
Kc1
K = Kv1 / Kc1

a = (0.5+k)/(2+k)

C-1 DERECHA
Kv5 Kc1 KEMP
1248.30 3.77 3.77
Kv5
K =Kv5 / Kc1
Kc1
a = (0.5+k)/(2+k)

C-2
Kv1 Kv2 Kc2
Kv1 Kv2 1248.30 980.80 949.22

Kc2 K =(Kv1+Kv2)/Kc2

a = (0.5+k)/(2+k)

C-2
Kv2 Kv3 Kc2
Kv2 Kv3 980.80 1248.30 949.22

Kc2 K =(Kv1+Kv2)/Kc2

a = (0.5+k)/(2+k)

C-3IZQUIERDA
Kv3 Kv4 Kc3
Kv3 Kv4 1248.30 1373.13 592.59

Kc3 K =(Kv3+Kv4)/Kc3

a = (0.5+k)/(2+k)
K =(Kv3+Kv4)/Kc3

a = (0.5+k)/(2+k)

C-3DERECHA
Kv4 Kv5 Kc3
Kv4 Kv5 1373.13 1248.30 592.59

Kc3 K =(Kv4+Kv5)/Kc3

a = (0.5+k)/(2+k)

SEGUNDO PISO:

C-1IZQUIERDA
Kv1 Kc1 KEMP
1248.30 446.61 14.86
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1

C-1 DERECHA
Kv5 Kc1 KEMP
Kv5 1248.30 241.07 8.02

Kc1 K =∑Kvi / 2Kc1

a = k/(2+k)
Kv5

C-2
Kv1 Kv2 Kc2
Kv1 Kv2 1248.30 980.80 761.90
K =∑Kvi / 2Kc2
Kc2
a = K/(2+k)
Kv1 Kv2

C-2 Kv2 Kv3 Kc2


980.80 1248.30 761.90
Kv2 Kv3
K =∑Kvi / 2Kc2
Kc2

Kv2 a = k/(2+k)
Kv3

C-3IZQUIERDA
Kv3 Kv4 Kc3
Kv3 Kv4 1248.30 1373.13 446.61
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv3 Kv4
C-3DERECHA
Kv4 Kv5 Kc3
Kv4 Kv5 1373.13 1248.30 446.61
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4 Kv5

TERCER PISO

C-1IZQUIERDA
Kv1 Kc1 KEMP
1248.30 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1

C-1 DERECHA
Kv5 Kc1 KEMP
Kv5 1248.30 241.07 8.02

K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv5

C-2
Kv1 Kv2 Kc2
Kv1 Kv2 1248.30 980.80 446.61
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1 Kv2

C-2 Kv2 Kv3 Kc2


980.80 1248.30 446.61
Kv2 Kv3
K =∑Kvi / 2Kc2
Kc2

Kv2 a = k/(2+k)
Kv3

C-3IZQUIERDA
Kv3 Kv4 Kc3
Kv3 Kv4 1248.30 1373.13 446.61
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv3 Kv4

C-3DERECHA
Kv4 Kv5 Kc3
Kv4 Kv5 1373.13 1248.30 241.07
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4 Kv5

CUARTO PISO

C-1IZQUIERDA
Kv1 Kc1 KEMP
1248.30 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1

C-2
Kv1 Kv2 Kc2
Kv1 Kv2 1248.30 980.80 446.61
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1 Kv2

C-2 Kv2 Kv3 Kc2


980.80 1248.30 446.61
Kv2 Kv3
K =∑Kvi / 2Kc2
Kc2

Kv2 a = k/(2+k)
Kv3

C-3IZQUIERDA
Kv3 Kv4 Kc3
Kv3 Kv4 1248.30 1373.13 446.61
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv3 Kv4

C-3DERECHA
Kv4 Kv"4 Kv5
Kv4 Kv"4 1373.13 5721.35 1248.30
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4 Kv5

QUINTO PISO

C-1IZQUIERDA
Kv1 Kc1 KEMP
1248.30 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1

C-2
Kv1 Kv2 Kc2
Kv1 Kv2 1248.30 980.80 446.61
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1 Kv2

C-2 Kv2 Kv3 Kc2


980.80 1248.30 446.61
Kv2 Kv3
K =∑Kvi / 2Kc2
Kc2

Kv2 a = k/(2+k)
Kv3

C-3IZQUIERDA
Kv3 Kv4 Kc3
Kv3 Kv4 1248.30 1373.13 446.61
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv3 Kv4

C-3DERECHA
Kv4 Kv"4 Kc3
Kv4 Kv"4 1373.13 5721.35 241.07
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4 Kv"4

PORTICOS 2-2
PRIMER PISO

C-4 IZQUIERDA
Kv1 Kc4 KEMP
Kv1 1040.25 592.59 11.93
Kc4
K = Kv1 / Kc4

a = (0.5+k)/(2+k)

C-4 DERECHA
Kv5 Kc4 KEMP
1040.25 347.37 6.99
Kv5
K =Kv5 / Kc4
Kc4
a = (0.5+k)/(2+k)

C-7
Kv1 Kv2 Kc7
Kv1 Kv2 1040.25 817.34 1446.76

Kc7 K =(Kv1+Kv2)/Kc7

a = (0.5+k)/(2+k)

C-7
Kv2 Kv3 Kc7
Kv2 Kv3 817.34 1040.25 1446.76

Kc7 K =(Kv2+Kv3)/Kc7

a = (0.5+k)/(2+k)

C-10 IZQUIERDA
Kv3 Kv4 Kc10
Kv3 Kv4 1040.25 1144.27 949.22

Kc10 K =(Kv3+Kv4)/Kc10

a = (0.5+k)/(2+k)

C-10DERECHA
Kv4 Kv5 Kc10
Kv4 Kv5 1144.27 1040.25 949.22

Kc10 K =(Kv4+Kv5)/Kc10

a = (0.5+k)/(2+k)

SEGUNDO PISO

C-4 IZQUIERDA
Kv1 Kc1 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1

C-4 DERECHA
Kv5 Kc4 KEMP
Kv5 1040.25 241.07 8.02

Kc4 K =∑Kvi / 2Kc4

a = k/(2+k)
Kv5

C-7
Kv1 Kv2 Kc7
Kv1 Kv2 1040.25 817.34 1220.42
K =∑Kvi / 2Kc7
Kc7
a = K/(2+k)
Kv1 Kv2

C-7 Kv2 Kv3 Kc7


817.34 1040.25 1220.42
Kv2 Kv3
K =∑Kvi / 2Kc7
Kc7

Kv2 a = k/(2+k)
Kv3

C-10 IZQUIERDA
Kv3 Kv4 Kc10
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv3 Kv4

C-10 DERECHA
Kv4 Kv5 Kc10
Kv4 Kv5 1144.27 1040.25 761.90
K =∑Kvi / 2Kc10

a = k/(2+k)
Kv4 Kv5
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv4 Kv5

TERCER PISO

C-4 IZQUIERDA
Kv1 Kc4 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1

C-4 DERECHA
Kv5 Kc4 KEMP
Kv5 1040.25 241.07 8.02

K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv5

C-7
Kv1 Kv2 Kc7
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2

C-7 Kv2 Kv3 Kc7


817.34 1040.25 761.90
Kv2 Kv3
K =∑Kvi / 2Kc7
Kc7

Kv2 a = k/(2+k)
Kv3

C-10 IZQUIERDA
Kv3 Kv4 Kc10
Kv3 Kv4 1040.25 1144.27 949.22
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv3 Kv4

C-10 DERECHA
Kv4 Kv5 Kc10
Kv4 Kv5 1144.27 1040.25 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv4 Kv5
K =∑Kvi / 2Kc10

a = k/(2+k)
Kv4 Kv5

CUARTO PISO

C-4 IZQUIERDA
Kv1 Kc4 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1

C-7
Kv1 Kv2 Kc7
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2

C-7 Kv2 Kv3 Kc7


817.34 1040.25 761.90
Kv2 Kv3
K =∑Kvi / 2Kc7
Kc7

Kv2 a = k/(2+k)
Kv3

C-10 IZQUIERDA
Kv3 Kv4 Kc10
Kv3 Kv4 1040.25 1144.27 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv3 Kv4

C-10 DERECHA
Kv4 Kv"4 Kv5
Kv4 Kv"4 1144.27 4767.80 1040.25
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv4 Kv5

QUINTO PISO

C-4 IZQUIERDA
Kv1 Kc4 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
K =∑Kvi / 2Kc4

a = k/(2+k)
Kv1

C-7
Kv1 Kv2 Kc7
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2

C-7 Kv2 Kv3 Kc7


817.34 1040.25 761.90
Kv2 Kv3
K =∑Kvi / 2Kc7
Kc7

Kv2 a = k/(2+k)
Kv3

C-10 IZQUIERDA
Kv3 Kv4 Kc10
Kv3 Kv4 1040.25 1144.27 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv3 Kv4

C-10 DERECHA
Kv4 Kv"4 Kc10
Kv4 Kv"4 1144.27 4767.80 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv4 Kv"4

PORTICOS 3-3
PRIMER PISO

C-5 IZQUIERDA
Kv1 Kc5 KEMP
Kv1 1040.25 592.59 11.93
Kc5
K = Kv1 / Kc5

a = (0.5+k)/(2+k)

C-5 DERECHA
Kv5 Kc5 KEMP
1040.25 347.37 6.99
Kv5
K =Kv5 / Kc5
Kc5
a = (0.5+k)/(2+k)

C-8
Kv1 Kv2 Kc8
Kv1 Kv2 1040.25 817.34 2118.20

Kc8 K =(Kv1+Kv2)/Kc5

a = (0.5+k)/(2+k)

C-8
Kv2 Kv3 Kc8
Kv2 Kv3 817.34 1040.25 2118.20

Kc8 K =(Kv2+Kv3)/Kc8

a = (0.5+k)/(2+k)

C-11 IZQUIERDA
Kv3 Kv4 Kc11
Kv3 Kv4 1040.25 1144.27 1446.76

Kc11 K =(Kv2+Kv3)/Kc11

a = (0.5+k)/(2+k)

C-11 DERECHA
Kv4 Kv5 Kc11
Kv4 Kv5 1144.27 1040.25 949.22

Kc11 K =(Kv4+Kv5)/Kc11

a = (0.5+k)/(2+k)
K =(Kv4+Kv5)/Kc11

a = (0.5+k)/(2+k)

SEGUNDO PISO

C-5 IZQUIERDA
Kv1 Kc5 KEMP
1040.25 761.90 25.35
Kv1
K =∑Kvi / 2Kc5
Kc5
a = k/(2+k)
Kv1

C-5 DERECHA
Kv5 Kc5 KEMP
Kv5 1040.25 241.07 8.02

Kc5 K =∑Kvi / 2Kc5

a = k/(2+k)
Kv5

C-8
Kv1 Kv2 Kc8
Kv1 Kv2 1040.25 817.34 1220.42
K =∑Kvi / 2Kc8
Kc8
a = K/(2+k)
Kv1 Kv2

C-8 Kv2 Kv3 Kc8


817.34 1040.25 1220.42
Kv2 Kv3
K =∑Kvi / 2Kc8
Kc8

Kv2 a = k/(2+k)
Kv3

C-11 IZQUIERDA
Kv3 Kv4 Kc11
Kv3 Kv4 1040.25 1144.27 1220.42
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv3 Kv4

C-11 DERECHA
Kv4 Kv5 Kc11
Kv4 Kv5 1144.27 1040.25 761.90
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv4 Kv5
TERCER PISO

C-5 IZQUIERDA
Kv1 Kc5 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc5
Kc5
a = k/(2+k)
Kv1

C-5 DERECHA
Kv5 Kc5 KEMP
Kv5 1040.25 241.07 8.02

K =∑Kvi / 2Kc5
Kc5
a = k/(2+k)
Kv5

C-8
Kv1 Kv2 Kc8
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc8
Kc8
a = k/(2+k)
Kv1 Kv2

C-8 Kv2 Kv3 Kc8


817.34 1040.25 761.90
Kv2 Kv3
K =∑Kvi / 2Kc8
Kc8

Kv2 a = k/(2+k)
Kv3

C-11 IZQUIERDA
Kv3 Kv4 Kc11
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv3 Kv4

C-11 DERECHA
Kv4 Kv5 Kc11
Kv4 Kv5 1144.27 1040.25 446.61
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv4 Kv5

CUARTO PISO
C-5 IZQUIERDA
Kv1 Kc5 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc5
Kc5
a = k/(2+k)
Kv1

C-8
Kv1 Kv2 Kc8
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc8
Kc8
a = k/(2+k)
Kv1 Kv2

C-8 Kv2 Kv3 Kc8


817.34 1040.25 761.90
Kv2 Kv3
K =∑Kvi / 2Kc8
Kc8

Kv2 a = k/(2+k)
Kv3

C-11 IZQUIERDA
Kv3 Kv4 Kc11
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv3 Kv4

C-11 DERECHA
Kv4 Kv"4 Kv5
Kv4 Kv"4 1144.27 4767.80 1040.25
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv4 Kv5

QUINTO PISO

C-5 IZQUIERDA
Kv1 Kc5 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc5
Kc5
a = k/(2+k)
Kv1

C-8
Kv1 Kv2 Kc8
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc8
Kc8
a = k/(2+k)
Kv1 Kv2

C-8 Kv2 Kv3 Kc8


817.34 1040.25 761.90
Kv2 Kv3
K =∑Kvi / 2Kc8
Kc8

Kv2 a = k/(2+k)
Kv3

C-11 IZQUIERDA
Kv3 Kv4 Kc11
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc11
Kc11
a = k/(2+k)
Kv3 Kv4

C-11 DERECHA
Kv4 Kv"4 Kc11
Kv4 Kv"4 1144.27 4767.80 446.61
K =∑Kvi / 2Kc11
Kc10
a = k/(2+k)
Kv4 Kv"4

PORTICOS 4-4

PRIMER PISO
C-6 IZQUIERDA
Kv1 Kc6 KEMP
Kv1 1040.25 949.22 19.10
Kc6
K = Kv1 / Kc6

a = (0.5+k)/(2+k)

C-6 DERECHA
Kv5 Kc6 KEMP
1040.25 347.37 6.99
Kv5
K =Kv5 / Kc6
Kc6
a = (0.5+k)/(2+k)

C-9
Kv1 Kv2 Kc9
Kv1 Kv2 1040.25 817.34 2118.20

Kc9 K =(Kv1+Kv2)/Kc9

a = (0.5+k)/(2+k)

C-9
Kv2 Kv3 Kc9
Kv2 Kv3 817.34 1040.25 2118.20

Kc9 K =(Kv2+Kv3)/Kc9

a = (0.5+k)/(2+k)

C-12 IZQUIERDA
Kv3 Kv4 Kc12
Kv3 Kv4 1040.25 1144.27 1446.76

Kc12 K =(Kv3+Kv4)/Kc12

a = (0.5+k)/(2+k)

C-12 DERECHA
Kv4 Kv5 Kc12
Kv4 Kv5 1144.27 1040.25 949.22

Kc12 K =(Kv4+Kv5)/Kc12

a = (0.5+k)/(2+k)

SEGUNDO PISO
C-6 IZQUIERDA
Kv1 Kc6 KEMP
1040.25 761.90 25.35
Kv1
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv1

C-6 DERECHA
Kv5 Kc6 KEMP
Kv5 1040.25 241.07 8.02

Kc6 K =∑Kvi / 2Kc6

a = k/(2+k)
Kv5

C-9
Kv1 Kv2 Kc9
Kv1 Kv2 1040.25 817.34 1860.12
K =∑Kvi / 2Kc9
Kc8
a = K/(2+k)
Kv1 Kv2

C-9 Kv2 Kv3 Kc9


817.34 1040.25 1860.12
Kv2 Kv3
K =∑Kvi / 2Kc9
Kc8

Kv2 a = k/(2+k)
Kv3

C-12 IZQUIERDA
Kv3 Kv4 Kc12
Kv3 Kv4 1040.25 1144.27 1220.42
K =∑Kvi / 2Kc12
Kc11
a = k/(2+k)
Kv3 Kv4

C-12 DERECHA
Kv4 Kv5 Kc12
Kv4 Kv5 1144.27 1040.25 761.90
K =∑Kvi / 2Kc12
Kc11
a = k/(2+k)
Kv4 Kv5

TERCER PISO

C-6 IZQUIERDA
Kv1 Kc6 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv1

C-6 DERECHA
Kv5 Kc6 KEMP
Kv5 1040.25 241.07 8.02

K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv5

C-9
Kv1 Kv2 Kc9
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv1 Kv2

C-9 Kv2 Kv3 Kc9


817.34 1040.25 761.90
Kv2 Kv3
K =∑Kvi / 2Kc9
Kc9

Kv2 a = k/(2+k)
Kv3

C-12 IZQUIERDA
Kv3 Kv4 Kc12
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4

C-12 DERECHA
Kv4 Kv5 Kc12
Kv4 Kv5 1144.27 1040.25 446.61
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv4 Kv5

CUARTO PISO

C-6 IZQUIERDA
Kv1 Kc6 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv1

C-9
Kv1 Kv2 Kc9
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv1 Kv2

C-9 Kv2 Kv3 Kc9


817.34 1040.25 761.90
Kv2 Kv3
K =∑Kvi / 2Kc9
Kc9

Kv2 a = k/(2+k)
Kv3

C-12 IZQUIERDA
Kv3 Kv4 Kc12
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4

C-12 DERECHA
Kv4 Kv"4 Kv5
Kv4 Kv"4 1144.27 4767.80 1040.25
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv4 Kv5

QUINTO PISO

C-6 IZQUIERDA
Kv1 Kc6 KEMP
1040.25 446.61 14.86
Kv1
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv1

C-9
Kv1 Kv2 Kc9
Kv1 Kv2 1040.25 817.34 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv1
K =∑Kvi / 2Kc9

a = k/(2+k)
Kv1 Kv2

C-9 Kv2 Kv3 Kc9


817.34 1040.25 761.90
Kv2 Kv3
K =∑Kvi / 2Kc9
Kc8

Kv2 a = k/(2+k)
Kv3

C-12 IZQUIERDA
Kv3 Kv4 Kc12
Kv3 Kv4 1040.25 1144.27 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4

C-12 DERECHA
Kv4 Kv"4 Kc12
Kv4 Kv"4 1144.27 4767.80 446.61
K =∑Kvi / 2Kc1
Kc12
a = k/(2+k)
Kv4 Kv"4

RESUMENES DE RIGIDEZ LATERAL EJE X-X


PORTICO PISO 1 PISO 2 PISO 3 PISO 4 PISO 5
1-1 54.64 66.73 50.65 45.38 45.60
2-2 68.58 78.44 62.10 58.57 59.30
3-3 81.98 84.97 66.81 62.95 63.69
4-4 84.67 91.10 66.81 62.95 63.69
5-5 54.64 66.73 50.65 45.38 45.60
SUMA 344.51 387.96 297.00 275.24 277.87

CALCULO DE RIGIDEZ LATERAL DE COLUMNAS EJE Y-Y:

PORTICOS A-A
PRIMER PISO

C-1
Kv1 Kc1 KEMP
Kv1 1000.00 592.59 11.93
Kc1
K = Kv1 / Kc1

a = (0.5+k)/(2+k)

C-1
Kv4 Kc1 KEMP
1000.00 592.59 11.93
Kv4
K =Kv4 / Kc1
Kc1
a = (0.5+k)/(2+k)

C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 592.59

Kc4 K =(Kv1+Kv2)/Kc4

a = (0.5+k)/(2+k)

C-5
Kv2 Kv3 Kc5
Kv2 Kv3 1125.00 750.00 949.22

Kc5 K =(Kv2+Kv3)/Kc5

a = (0.5+k)/(2+k)
K =(Kv2+Kv3)/Kc5

a = (0.5+k)/(2+k)

C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 949.22

Kc16 K =(Kv3+Kv4)/Kc6

a = (0.5+k)/(2+k)

SEGUNDO PISO

C-1
Kv1 Kc1 KEMP
1000.00 446.61 14.86
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1

C-1
Kv4 Kc1 KEMP
Kv4 1000.00 446.61 14.86

Kc1 K =∑Kvi / 2Kc1

a = k/(2+k)
Kv4

C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 446.61
K =∑Kvi / 2Kc4
Kc4
a = K/(2+k)
Kv1 Kv2

C-5 Kv2 Kv3 Kc5


1125.00 750.00 761.90
Kv2 Kv3
K =∑Kvi / 2Kc5
Kc5

Kv2 a = k/(2+k)
Kv3

C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 761.90
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4
TERCER PISO

C-1
Kv1 Kc1 KEMP
1000.00 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1

C-1
Kv4 Kc1 KEMP
Kv4 1000.00 241.07 8.02

K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv4

C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 446.61
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1 Kv2

C-5 Kv2 Kv3 Kc5


1125.00 750.00 446.61
Kv2 Kv3
K =∑Kvi / 2Kc5
Kc5

Kv2 a = k/(2+k)
Kv3

C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 446.61
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4

CUARTO PISO

C-1
Kv1 Kc1 KEMP
1000.00 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1

C-1
Kv4 Kc1 KEMP
Kv4 1000.00 241.07 8.02

K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv4

C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 446.61
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1 Kv2

C-5 Kv2 Kv3 Kc5


1125.00 750.00 446.61
Kv2 Kv3
K =∑Kvi / 2Kc5
Kc5

Kv2 a = k/(2+k)
Kv3

C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 446.61
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4

QUINTO PISO

C-1
Kv1 Kc1 KEMP
1000.00 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1

C-1
Kv4 Kc1 KEMP
Kv4 1000.00 241.07 8.02

K =∑Kvi / 2Kc1

a = k/(2+k)
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv4

C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 446.61
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1 Kv2

C-5 Kv2 Kv3 Kc5


1125.00 750.00 446.61
Kv2 Kv3
K =∑Kvi / 2Kc5
Kc5

Kv2 a = k/(2+k)
Kv3

C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 446.61
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4

PORTICOS B-B Y C-C

PRIMER PISO
C-2
Kv1 Kc2 KEMP
Kv1 578.70 949.22 19.10
Kc2
K = Kv1 / Kc2

a = (0.5+k)/(2+k)

C-2
Kv4 Kc2 KEMP
578.70 949.22 19.10
Kv4
K =Kv4 / Kc2
Kc2
a = (0.5+k)/(2+k)

C-7
Kv1 Kv2 Kc7
Kv1 Kv2 578.70 651.04 1446.76

Kc7 K =(Kv1+Kv2)/Kc7

a = (0.5+k)/(2+k)

C-8
Kv2 Kv3 Kc8
Kv2 Kv3 651.04 434.03 2118.20

Kc8 K =(Kv2+Kv3)/Kc8

a = (0.5+k)/(2+k)

C-9
Kv3 Kv4 Kc9
Kv3 Kv4 434.03 578.70 2118.20

Kc9 K =(Kv3+Kv4)/Kc9

a = (0.5+k)/(2+k)

SEGUNDO PISO

C-2
Kv1 Kc2 KEMP
578.70 761.90 25.35
Kv1
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
K =∑Kvi / 2Kc2

a = k/(2+k)
Kv1

C-2
Kv4 Kc2 KEMP
Kv4 578.70 761.90 25.35

Kc2 K =∑Kvi / 2Kc2

a = k/(2+k)
Kv4

C-7
Kv1 Kv2 Kc7
Kv1 Kv2 578.70 651.04 1220.42
K =∑Kvi / 2Kc7
Kc7
a = K/(2+k)
Kv1 Kv2

C-8 Kv2 Kv3 Kc8


651.04 434.03 1220.42
Kv2 Kv3
K =∑Kvi / 2Kc8
Kc8

Kv2 a = k/(2+k)
Kv3

C-9
Kv3 Kv4 Kc9
Kv3 Kv4 434.03 578.70 1860.12
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv3 Kv4

TERCER PISO

C-2
Kv1 Kc2 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1

C-2
Kv4 Kc2 KEMP
Kv4 578.70 446.61 14.86

K =∑Kvi / 2Kc2

a = k/(2+k)
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv4

C-7
Kv1 Kv2 Kc7
Kv1 Kv2 578.70 651.04 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2

C-8 Kv2 Kv3 Kc8


651.04 434.03 761.90
Kv2 Kv3
K =∑Kvi / 2Kc8
Kc8

Kv2 a = k/(2+k)
Kv3

C-9
Kv3 Kv4 Kc9
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv3 Kv4

CUARTO PISO

C-2
Kv1 Kc2 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1

C-2
Kv4 Kc2 KEMP
Kv4 578.70 446.61 14.86

K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv4

C-7
Kv1 Kv2 Kc7
Kv1 Kv2 578.70 651.04 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2

C-8 Kv2 Kv3 Kc8


651.04 434.03 761.90
Kv2 Kv3
K =∑Kvi / 2Kc8
Kc8

Kv2 a = k/(2+k)
Kv3

C-9
Kv3 Kv4 Kc9
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv3 Kv4

QUINTO PISO

C-2
Kv1 Kc2 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv1

C-2
Kv4 Kc2 KEMP
Kv4 578.70 446.61 14.86

K =∑Kvi / 2Kc2
Kc2
a = k/(2+k)
Kv4

C-7
Kv1 Kv2 Kc7
Kv1 Kv2 578.70 651.04 761.90
K =∑Kvi / 2Kc7
Kc7
a = k/(2+k)
Kv1 Kv2

C-8 Kv2 Kv3 Kc8


651.04 434.03 761.90
Kv2 Kv3
K =∑Kvi / 2Kc8
Kc8
a = k/(2+k)
K =∑Kvi / 2Kc8
Kc8

Kv2 a = k/(2+k)
Kv3

C-9
Kv3 Kv4 Kc9
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc9
Kc9
a = k/(2+k)
Kv3 Kv4

PORTICOS D-D :

PRIMER PISO

C-3
Kv1 Kc3 KEMP
Kv1 578.70 592.59 11.93
Kc3
K = Kv1 / Kc3

a = (0.5+k)/(2+k)

C-3
Kv4 Kc3 KEMP
578.70 592.59 11.93
Kv4
K =Kv4 / Kc3
Kc3
a = (0.5+k)/(2+k)
K =Kv4 / Kc3
Kc3
a = (0.5+k)/(2+k)

C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 949.22

Kc10 K =(Kv1+Kv2)/Kc10

a = (0.5+k)/(2+k)

C-11
Kv2 Kv3 Kc11
Kv2 Kv3 651.04 434.03 1446.76

Kc11 K =(Kv2+Kv3)/Kc11

a = (0.5+k)/(2+k)

C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 1446.76

Kc12 K =(Kv3+Kv4)/Kc12

a = (0.5+k)/(2+k)

SEGUNDO PISO

C-3
Kv1 Kc3 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1

C-3
Kv4 Kc3 KEMP
Kv4 578.70 446.61 14.86

Kc3 K =∑Kvi / 2Kc3

a = k/(2+k)
Kv4

C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 761.90
K =∑Kvi / 2Kc10

a = K/(2+k)
Kv1 Kv2
K =∑Kvi / 2Kc10
Kc10
a = K/(2+k)
Kv1 Kv2

C-11 Kv2 Kv3 Kc11


651.04 434.03 1220.42
Kv2 Kv3
K =∑Kvi / 2Kc11
Kc11

Kv2 a = k/(2+k)
Kv3

C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 1220.42
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4

TERCER PISO

C-3
Kv1 Kc3 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1

C-3
Kv4 Kc3 KEMP
Kv4 578.70 446.61 14.86

K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4

C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2

C-11 Kv2 Kv3 Kc11


651.04 434.03 761.90
Kv2 Kv3
K =∑Kvi / 2Kc11

a = k/(2+k)
Kv2 Kv3
K =∑Kvi / 2Kc11
Kc11

Kv2 a = k/(2+k)
Kv3

C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4

CUARTO PISO

C-3
Kv1 Kc3 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1

C-3
Kv4 Kc3 KEMP
Kv4 578.70 446.61 14.86

K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4

C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2

C-11 Kv2 Kv3 Kc11


651.04 434.03 761.90
Kv2 Kv3
K =∑Kvi / 2Kc11
Kc11

Kv2 a = k/(2+k)
Kv3

C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4

QUINTO PISO

C-3
Kv1 Kc3 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1

C-3
Kv4 Kc3 KEMP
Kv4 578.70 446.61 14.86

K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4

C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2

C-11 Kv2 Kv3 Kc11


651.04 434.03 761.90
Kv2 Kv3
K =∑Kvi / 2Kc11
Kc11

Kv2 a = k/(2+k)
Kv3

C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4

PORTICOS E-E:
PRIMER PISO

C-3
Kv1 Kc3 KEMP
Kv1 578.70 592.59 11.93
Kc3
K = Kv1 / Kc3

a = (0.5+k)/(2+k)

C-3
Kv4 Kc3 KEMP
578.70 592.59 11.93
Kv4
K =Kv4 / Kc3
Kc3
a = (0.5+k)/(2+k)

C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 949.22

Kc10 K =(Kv1+Kv2)/Kc10

a = (0.5+k)/(2+k)

C-11
Kv2 Kv3 Kc11
Kv2 Kv3 651.04 434.03 949.22

Kc11 K =(Kv2+Kv3)/Kc11

a = (0.5+k)/(2+k)
K =(Kv2+Kv3)/Kc11

a = (0.5+k)/(2+k)

C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 949.22

Kc12 K =(Kv3+Kv4)/Kc12

a = (0.5+k)/(2+k)

SEGUNDO PISO

C-3
Kv1 Kc3 KEMP
578.70 446.61 14.86
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1

C-3
Kv4 Kc3 KEMP
Kv4 578.70 446.61 14.86

Kc3 K =∑Kvi / 2Kc3

a = k/(2+k)
Kv4

C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 761.90
K =∑Kvi / 2Kc10
Kc10
a = K/(2+k)
Kv1 Kv2

C-11 Kv2 Kv3 Kc11


651.04 434.03 761.90
Kv2 Kv3
K =∑Kvi / 2Kc11
Kc11

Kv2 a = k/(2+k)
Kv3

C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 761.90
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3
K =∑Kvi / 2Kc12

a = k/(2+k)
Kv3 Kv4

TERCER PISO

C-3
Kv1 Kc3 KEMP
578.70 241.07 8.02
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1

C-3
Kv4 Kc3 KEMP
Kv4 578.70 241.07 8.02

K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4

C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2

C-11 Kv2 Kv3 Kc11


651.04 434.03 446.61
Kv2 Kv3
K =∑Kvi / 2Kc11
Kc11

Kv2 a = k/(2+k)
Kv3

C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 446.61
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4

CUARTO PISO

C-3
Kv1 Kc3 KEMP
578.70 241.07 8.02
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1

C-3
Kv4 Kc3 KEMP
Kv4 578.70 241.07 8.02

K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4

C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2

C-11 Kv2 Kv3 Kc11


651.04 434.03 446.61
Kv2 Kv3
K =∑Kvi / 2Kc11
Kc11

Kv2 a = k/(2+k)
Kv3

C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 446.61
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4

QUINTO PISO

C-3
Kv1 Kc3 KEMP
578.70 241.07 8.02
Kv1
K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv1

C-3
Kv4 Kc3 KEMP
Kv4 578.70 241.07 8.02

K =∑Kvi / 2Kc3
Kc3
a = k/(2+k)
Kv4

C-10
Kv1 Kv2 Kc10
Kv1 Kv2 578.70 651.04 446.61
K =∑Kvi / 2Kc10
Kc10
a = k/(2+k)
Kv1 Kv2

C-11 Kv2 Kv3 Kc11


651.04 434.03 446.61
Kv2 Kv3
K =∑Kvi / 2Kc11
Kc11

Kv2 a = k/(2+k)
Kv3

C-12
Kv3 Kv4 Kc12
Kv3 Kv4 434.03 578.70 446.61
K =∑Kvi / 2Kc12
Kc12
a = k/(2+k)
Kv3 Kv4

PORTICO F-F:

PRIMER PISO
C-1
Kv1 Kc1 KEMP
Kv1 1000.00 187.50 3.77
Kc1
K = Kv1 / Kc1

a = (0.5+k)/(2+k)

C-1
Kv4 Kc1 KEMP
1000.00 187.50 3.77
Kv4
K =Kv4 / Kc1
Kc1
a = (0.5+k)/(2+k)

C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 347.37

Kc4 K =(Kv1+Kv2)/Kc4

a = (0.5+k)/(2+k)

C-5
Kv2 Kv3 Kc5
Kv2 Kv3 1125.00 750.00 347.37

Kc5 K =(Kv2+Kv3)/Kc5

a = (0.5+k)/(2+k)

C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 347.37

Kc16 K =(Kv3+Kv4)/Kc6

a = (0.5+k)/(2+k)

SEGUNDO PISO

C-1
Kv1 Kc1 KEMP
1000.00 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1
Kv1

C-1
Kv4 Kc1 KEMP
Kv4 1000.00 241.07 8.02

Kc1 K =∑Kvi / 2Kc1

a = k/(2+k)
Kv4

C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 241.07
K =∑Kvi / 2Kc4
Kc4
a = K/(2+k)
Kv1 Kv2

C-5 Kv2 Kv3 Kc5


1125.00 750.00 241.07
Kv2 Kv3
K =∑Kvi / 2Kc5
Kc5

Kv2 a = k/(2+k)
Kv3

C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 241.07
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4

TERCER PISO

C-1
Kv1 Kc1 KEMP
1000.00 241.07 8.02
Kv1
K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
Kv1

C-1
Kv4 Kc1 KEMP
Kv4 1000.00 241.07 8.02

K =∑Kvi / 2Kc1
Kc1
a = k/(2+k)
K =∑Kvi / 2Kc1

a = k/(2+k)
Kv4

C-4
Kv1 Kv2 Kc4
Kv1 Kv2 1000.00 1125.00 241.07
K =∑Kvi / 2Kc4
Kc4
a = k/(2+k)
Kv1 Kv2

C-5 Kv2 Kv3 Kc5


1125.00 750.00 241.07
Kv2 Kv3
K =∑Kvi / 2Kc5
Kc5

Kv2 a = k/(2+k)
Kv3

C-6
Kv3 Kv4 Kc6
Kv3 Kv4 750.00 1000.00 241.07
K =∑Kvi / 2Kc6
Kc6
a = k/(2+k)
Kv3 Kv4

RESUMENES DE RIGIDEZ LATERAL EJE Y-Y


PORTICO PISO 1 PISO 2 PISO 3 PISO 4 PISO 5
A-A 46.42 53.69 41.19 41.19 41.19
B-B 64.05 53.30 43.67 43.67 43.67
C-C 64.05 53.30 43.67 43.67 43.67
D-D 48.42 47.41 40.96 40.96 40.96
E-E 41.99 43.67 33.40 33.40 33.40
F-F 22.78 30.03 30.03 0 0
SUMA 287.70 281.39 232.91 202.89 202.89

LA RIGIDEZ FINAL DE CADA EJE ES:

RIGIDEZ LATERAL EJE MASAS


PISO X-X Y-Y X-X Y-Y
1 344.51 287.70 507.98 507.98
2 387.96 281.39 496.02 496.02
3 297.00 232.91 485.51 485.51
4 275.24 202.89 394.64 394.64
5 277.87 202.89 358.63 358.63

m = 358.63ton m = 358.63ton

K = 277.87 K = 202.89

m = 394.64 ton m = 394.64 ton

K = 275.24 K = 202.89

m = 485.51 ton m = 485.51 ton

K = 297.00 K = 232.91

m = 496.02 ton m = 496.02 ton

K = 387.96 K = 281.39

m = 507.98 ton m = 507.98 ton

K = 344.51 K = 287.70

MODELO DINAMICO X-X MODELO DINAMICO Y-Y

MODELO DINAMICO CON RIGIDEZ DE WILBUR


Z LATERAL POR EL METODO DE MUTO

EJE Y-Y

PARA PORTICOS A-A Y F-F


Iv(cm4) L(cm) K v(cm3)
450000.00 450 1000.00
450000.00 400 1125.00
450000.00 600 750.00
450000.00 450 1000.00

PARA PORTICOS B-B, C-C, D-D Y E-E


Iv(cm4) L(cm) K v(cm3)
260416.67 450 578.70
260416.67 400 651.04
260416.67 600 434.03
260416.67 450 578.70

S DE COLUMNAS EMPOTRADAS :

Kc (cm3) KEMP(tn/cm)
592.59 11.93
446.61 14.86
241.07 8.02

187.50 3.77
241.07 8.02

949.22 19.10
761.90 25.35
446.61 14.86

592.59 11.93
446.61 14.86
446.61 14.86

592.59 11.93
446.61 14.86
241.07 8.02

592.59 11.93
446.61 14.86
446.61 14.86

347.37 6.99
241.07 8.02

949.22 19.10
761.90 25.35
446.61 14.86

347.37 6.99
241.07 8.02

949.22 19.10
761.90 25.35
446.61 14.86

347.37 6.99
241.07 8.02

1446.76 29.12
1220.42 40.60
761.90 25.35

2118.20 42.63
1220.42 40.60
761.90 25.35

2118.20 42.63
1860.12 61.89
761.90 25.35

949.22 19.10
761.90 25.35
446.61 14.86

949.22 19.10
761.90 25.35
446.61 14.86

1446.76 29.12
1220.42 40.60
761.90 25.35

949.22 19.10
761.90 25.35
446.61 14.86

1446.76 29.12
1220.42 40.60
761.90 25.35

949.22 19.10
761.90 25.35
446.61 14.86
K a KC1 (tn/cm)
2.11 0.63 7.57

K a KC1 (tn/cm)
330.78 1.00 3.76

KEMP K a KC2 (tn/cm)


19.10 2.35 0.66 12.51

KEMP K a KC2 (tn/cm)


19.10 2.35 0.66 12.51

KEMP K a KC3 (tn/cm)


11.93 4.42 0.77 9.14
KEMP K a KC3 (tn/cm)
11.93 4.42 0.77 9.14

K a KC1 (tn/cm)
2.80 0.58 8.66

K a KC1 (tn/cm)
5.18 0.72 5.79

KEMP K a KC2 (tn/cm)


25.35 2.93 0.59 15.06

KEMP K a KC2 (tn/cm)


25.35 2.93 0.59 15.06

KEMP K a KC3 (tn/cm)


14.86 5.87 0.75 11.08
KEMP K a KC3 (tn/cm)
14.86 5.87 0.75 11.08

K a KC1 (tn/cm)
5.18 0.72 5.79

K a KC1 (tn/cm)
5.18 0.72 5.79

KEMP K a KC2 (tn/cm)


14.86 4.99 0.71 10.61

KEMP K a KC2 (tn/cm)


14.86 4.99 0.71 10.61

KEMP K a KC3 (tn/cm)


14.86 5.87 0.75 11.08

KEMP K a KC3 (tn/cm)


8.02 10.87 0.84 6.77

K a KC1 (tn/cm)
5.18 0.72 5.79

KEMP K a KC2 (tn/cm)


14.86 4.99 0.71 10.61

KEMP K a KC2 (tn/cm)


14.86 4.99 0.71 10.61

KEMP K a KC3 (tn/cm)


14.86 5.87 0.75 11.08

Kc3 KEMP K a KC3 (tn/cm)


241.07 8.02 20.15 0.91 7.30

K a KC1 (tn/cm)
5.18 0.72 5.79

KEMP K a KC2 (tn/cm)


14.86 4.99 0.71 10.61

KEMP K a KC2 (tn/cm)


14.86 4.99 0.71 10.61

KEMP K a KC3 (tn/cm)


14.86 5.87 0.75 11.08

KEMP K a KC3 (tn/cm)


8.02 29.43 0.94 7.51
K a KC4 (tn/cm)
1.76 0.60 7.16

K a KC4 (tn/cm)
2.99 0.70 4.89

KEMP K a KC7 (tn/cm)


29.12 1.28 0.54 15.82

KEMP K a KC7 (tn/cm)


29.12 1.28 0.54 15.82

KEMP K a KC10 (tn/cm)


19.10 2.30 0.65 12.44

KEMP K a KC10 (tn/cm)


19.10 2.30 0.65 12.44

K a KC4 (tn/cm)
2.33 0.54 7.99

K a KC4 (tn/cm)
4.32 0.68 5.48

KEMP K a KC7 (tn/cm)


40.60 1.52 0.43 17.55

KEMP K a KC7 (tn/cm)


40.60 1.52 0.43 17.55

KEMP K a KC10 (tn/cm)


25.35 2.87 0.59 14.93

KEMP K a KC10 (tn/cm)


25.35 2.87 0.59 14.93
K a KC4 (tn/cm)
2.33 0.54 7.99

K a KC4 (tn/cm)
4.32 0.68 5.48

KEMP K a KC7 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC7 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC10 (tn/cm)


19.10 2.30 0.54 10.22

KEMP K a KC10 (tn/cm)


14.86 4.89 0.71 10.55
K a KC4 (tn/cm)
2.33 0.54 7.99

KEMP K a KC7 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC7 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC10 (tn/cm)


14.86 4.89 0.71 10.55

Kc10 KEMP K a KC10 (tn/cm)


446.61 14.86 9.06 0.82 12.17

K a KC4 (tn/cm)
2.33 0.54 7.99
KEMP K a KC7 (tn/cm)
25.35 2.44 0.55 13.93

KEMP K a KC7 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC10 (tn/cm)


14.86 4.89 0.71 10.55

KEMP K a KC10 (tn/cm)


14.86 13.24 0.87 12.91
K a KC5 (tn/cm)
1.76 0.60 7.16

K a KC5 (tn/cm)
2.99 0.70 4.89

KEMP K a KC8 (tn/cm)


42.63 0.88 0.48 20.40

KEMP K a KC8 (tn/cm)


42.63 0.88 0.48 20.40

KEMP K a KC11 (tn/cm)


29.12 1.51 0.57 16.67

KEMP K a KC11 (tn/cm)


19.10 2.30 0.65 12.44
K a KC5 (tn/cm)
1.37 0.41 10.28

K a KC5 (tn/cm)
4.32 0.68 5.48

KEMP K a KC8 (tn/cm)


40.60 1.52 0.43 17.55

KEMP K a KC8 (tn/cm)


40.60 1.52 0.43 17.55

KEMP K a KC11 (tn/cm)


40.60 1.79 0.47 19.18

KEMP K a KC11 (tn/cm)


25.35 2.87 0.59 14.93
K a KC5 (tn/cm)
2.33 0.54 7.99

K a KC5 (tn/cm)
4.32 0.68 5.48

KEMP K a KC8 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC8 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC11 (tn/cm)


25.35 2.87 0.59 14.93

KEMP K a KC11 (tn/cm)


14.86 4.89 0.71 10.55
K a KC5 (tn/cm)
2.33 0.54 7.99

KEMP K a KC8 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC8 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC11 (tn/cm)


25.35 2.87 0.59 14.93

Kc11 KEMP K a KC11 (tn/cm)


446.61 14.86 9.06 0.82 12.17

K a KC5 (tn/cm)
2.33 0.54 7.99
KEMP K a KC8 (tn/cm)
25.35 2.44 0.55 13.93

KEMP K a KC8 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC11 (tn/cm)


25.35 2.87 0.59 14.93

KEMP K a KC11 (tn/cm)


14.86 13.24 0.87 12.91
K a KC6 (tn/cm)
1.10 0.52 9.85

K a KC6 (tn/cm)
2.99 0.70 4.89

KEMP K a KC9 (tn/cm)


42.63 0.88 0.48 20.40

KEMP K a KC9 (tn/cm)


42.63 0.88 0.48 20.40

KEMP K a KC12 (tn/cm)


29.12 1.51 0.57 16.67

KEMP K a KC12 (tn/cm)


19.10 2.30 0.65 12.44
K a KC6 (tn/cm)
1.37 0.41 10.28

K a KC6 (tn/cm)
4.32 0.68 5.48

KEMP K a KC9 (tn/cm)


61.89 1.00 0.33 20.61

KEMP K a KC9 (tn/cm)


61.89 1.00 0.33 20.61

KEMP K a KC12 (tn/cm)


40.60 1.79 0.47 19.18

KEMP K a KC12 (tn/cm)


25.35 2.87 0.59 14.93

K a KC6 (tn/cm)
2.33 0.54 7.99

K a KC6 (tn/cm)
4.32 0.68 5.48

KEMP K a KC9 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC9 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC12 (tn/cm)


25.35 2.87 0.59 14.93

KEMP K a KC12 (tn/cm)


14.86 4.89 0.71 10.55

K a KC6 (tn/cm)
2.33 0.54 7.99
KEMP K a KC9 (tn/cm)
25.35 2.44 0.55 13.93

KEMP K a KC9 (tn/cm)


25.35 2.44 0.55 13.93

KEMP K a KC12 (tn/cm)


25.35 2.87 0.59 14.93

Kc12 KEMP K a KC12 (tn/cm)


446.61 14.86 9.06 0.82 12.17

K a KC6 (tn/cm)
2.33 0.54 7.99

KEMP K a KC9 (tn/cm)


25.35 2.44 0.55 13.93
KEMP K a KC9 (tn/cm)
25.35 2.44 0.55 13.93

KEMP K a KC12 (tn/cm)


25.35 2.87 0.59 14.93

KEMP K a KC12 (tn/cm)


14.86 13.24 0.87 12.91
K a KC1 (tn/cm)
1.69 0.59 7.08

K a KC1 (tn/cm)
1.69 0.59 7.08

KEMP K a KC4 (tn/cm)


11.93 3.59 0.73 8.72

KEMP K a KC5 (tn/cm)


19.10 1.98 0.62 11.90
KEMP K a KC6 (tn/cm)
19.10 1.84 0.61 11.65

K a KC1 (tn/cm)
2.24 0.53 7.85

K a KC1 (tn/cm)
2.24 0.53 7.85

KEMP K a KC4 (tn/cm)


14.86 4.76 0.70 10.46

KEMP K a KC5 (tn/cm)


25.35 2.46 0.55 13.98

KEMP K a KC6 (tn/cm)


25.35 2.30 0.53 13.55
K a KC1 (tn/cm)
4.15 0.67 5.41

K a KC1 (tn/cm)
4.15 0.67 5.41

KEMP K a KC4 (tn/cm)


14.86 4.76 0.70 10.46

KEMP K a KC5 (tn/cm)


14.86 4.20 0.68 10.06

KEMP K a KC6 (tn/cm)


14.86 3.92 0.66 9.84

K a KC1 (tn/cm)
4.15 0.67 5.41
K a KC1 (tn/cm)
4.15 0.67 5.41

KEMP K a KC4 (tn/cm)


14.86 4.76 0.70 10.46

KEMP K a KC5 (tn/cm)


14.86 4.20 0.68 10.06

KEMP K a KC6 (tn/cm)


14.86 3.92 0.66 9.84

K a KC1 (tn/cm)
4.15 0.67 5.41

K a KC1 (tn/cm)
4.15 0.67 5.41
KEMP K a KC4 (tn/cm)
14.86 4.76 0.70 10.46

KEMP K a KC5 (tn/cm)


14.86 4.20 0.68 10.06

KEMP K a KC6 (tn/cm)


14.86 3.92 0.66 9.84
K a KC2 (tn/cm)
0.61 0.43 8.12

K a KC2 (tn/cm)
0.61 0.43 8.12

KEMP K a KC7 (tn/cm)


29.12 0.85 0.47 13.79

KEMP K a KC8 (tn/cm)


42.63 0.51 0.40 17.18

KEMP K a KC9 (tn/cm)


42.63 0.48 0.39 16.83

K a KC2 (tn/cm)
0.76 0.28 6.98
K a KC2 (tn/cm)
0.76 0.28 6.98

KEMP K a KC7 (tn/cm)


40.60 1.01 0.34 13.60

KEMP K a KC8 (tn/cm)


40.60 0.89 0.31 12.50

KEMP K a KC9 (tn/cm)


61.89 0.54 0.21 13.24

K a KC2 (tn/cm)
1.30 0.39 5.84

K a KC2 (tn/cm)
1.30 0.39 5.84
KEMP K a KC7 (tn/cm)
25.35 1.61 0.45 11.32

KEMP K a KC8 (tn/cm)


25.35 1.42 0.42 10.54

KEMP K a KC9 (tn/cm)


25.35 1.33 0.40 10.12

K a KC2 (tn/cm)
1.30 0.39 5.84

K a KC2 (tn/cm)
1.30 0.39 5.84

KEMP K a KC7 (tn/cm)


25.35 1.61 0.45 11.32
KEMP K a KC8 (tn/cm)
25.35 1.42 0.42 10.54

KEMP K a KC9 (tn/cm)


25.35 1.33 0.40 10.12

K a KC2 (tn/cm)
1.30 0.39 5.84

K a KC2 (tn/cm)
1.30 0.39 5.84

KEMP K a KC7 (tn/cm)


25.35 1.61 0.45 11.32

KEMP K a KC8 (tn/cm)


25.35 1.42 0.42 10.54
KEMP K a KC9 (tn/cm)
25.35 1.33 0.40 10.12

K a KC3 (tn/cm)
0.98 0.50 5.92

K a KC3 (tn/cm)
0.98 0.50 5.92
KEMP K a KC10 (tn/cm)
19.10 1.30 0.54 10.41

KEMP K a KC11 (tn/cm)


29.12 0.75 0.45 13.24

KEMP K a KC12 (tn/cm)


29.12 0.70 0.44 12.94

K a KC3 (tn/cm)
1.30 0.39 5.84

K a KC3 (tn/cm)
1.30 0.39 5.84

KEMP K a KC10 (tn/cm)


25.35 1.61 0.45 11.32
KEMP K a KC11 (tn/cm)
40.60 0.89 0.31 12.50

KEMP K a KC12 (tn/cm)


40.60 0.83 0.29 11.91

K a KC3 (tn/cm)
1.30 0.39 5.84

K a KC3 (tn/cm)
1.30 0.39 5.84

KEMP K a KC10 (tn/cm)


14.86 2.75 0.58 8.61

KEMP K a KC11 (tn/cm)


25.35 1.42 0.42 10.54
KEMP K a KC12 (tn/cm)
25.35 1.33 0.40 10.12

K a KC3 (tn/cm)
1.30 0.39 5.84

K a KC3 (tn/cm)
1.30 0.39 5.84

KEMP K a KC10 (tn/cm)


14.86 2.75 0.58 8.61

KEMP K a KC11 (tn/cm)


25.35 1.42 0.42 10.54

KEMP K a KC12 (tn/cm)


25.35 1.33 0.40 10.12
K a KC3 (tn/cm)
1.30 0.39 5.84

K a KC3 (tn/cm)
1.30 0.39 5.84

KEMP K a KC10 (tn/cm)


14.86 2.75 0.58 8.61

KEMP K a KC11 (tn/cm)


25.35 1.42 0.42 10.54

KEMP K a KC12 (tn/cm)


25.35 1.33 0.40 10.12
K a KC3 (tn/cm)
0.98 0.50 5.92

K a KC3 (tn/cm)
0.98 0.50 5.92

KEMP K a KC10 (tn/cm)


19.10 1.30 0.54 10.41

KEMP K a KC11 (tn/cm)


19.10 1.14 0.52 9.99
KEMP K a KC12 (tn/cm)
19.10 1.07 0.51 9.76

K a KC3 (tn/cm)
1.30 0.39 5.84

K a KC3 (tn/cm)
1.30 0.39 5.84

KEMP K a KC10 (tn/cm)


25.35 1.61 0.45 11.32

KEMP K a KC11 (tn/cm)


25.35 1.42 0.42 10.54

KEMP K a KC12 (tn/cm)


25.35 1.33 0.40 10.12
K a KC3 (tn/cm)
2.40 0.55 4.38

K a KC3 (tn/cm)
2.40 0.55 4.38

KEMP K a KC10 (tn/cm)


14.86 2.75 0.58 8.61

KEMP K a KC11 (tn/cm)


14.86 2.43 0.55 8.15

KEMP K a KC12 (tn/cm)


14.86 2.27 0.53 7.90

K a KC3 (tn/cm)
2.40 0.55 4.38

K a KC3 (tn/cm)
2.40 0.55 4.38

KEMP K a KC10 (tn/cm)


14.86 2.75 0.58 8.61

KEMP K a KC11 (tn/cm)


14.86 2.43 0.55 8.15

KEMP K a KC12 (tn/cm)


14.86 2.27 0.53 7.90

K a KC3 (tn/cm)
2.40 0.55 4.38
K a KC3 (tn/cm)
2.40 0.55 4.38

KEMP K a KC10 (tn/cm)


14.86 2.75 0.58 8.61

KEMP K a KC11 (tn/cm)


14.86 2.43 0.55 8.15

KEMP K a KC12 (tn/cm)


14.86 2.27 0.53 7.90
K a KC1 (tn/cm)
5.33 0.80 3.00

K a KC1 (tn/cm)
5.33 0.80 3.00

KEMP K a KC4 (tn/cm)


6.99 6.12 0.82 5.70

KEMP K a KC5 (tn/cm)


6.99 5.40 0.80 5.57

KEMP K a KC6 (tn/cm)


6.99 5.04 0.79 5.50

K a KC1 (tn/cm)
4.15 0.67 5.41
K a KC1 (tn/cm)
4.15 0.67 5.41

KEMP K a KC4 (tn/cm)


8.02 8.81 0.82 6.54

KEMP K a KC5 (tn/cm)


8.02 7.78 0.80 6.38

KEMP K a KC6 (tn/cm)


8.02 7.26 0.78 6.29

K a KC1 (tn/cm)
4.15 0.67 5.41

K a KC1 (tn/cm)
4.15 0.67 5.41
KEMP K a KC4 (tn/cm)
8.02 8.81 0.82 6.54

KEMP K a KC5 (tn/cm)


8.02 7.78 0.80 6.38

KEMP K a KC6 (tn/cm)


8.02 7.26 0.78 6.29
m = 358.63ton

.89
m = 394.64 ton

.89
m = 485.51 ton

.91
m = 496.02 ton

.39
m = 507.98 ton

.70

LO DINAMICO Y-Y

BUR
DETERMINACION DE RIGIDEZ LATERAL POR EL M

DATOS :

SIMBOLO VALOR UNIDAD


E 217 Tn/cm2
VIGA 101 30x60 m2
VIGA 102 25x65 m2
VIGA 103 25x50 m2
VIGA 104 25x60 m2

MOMENTO DE INNERCIA
VIGAS SECCION Iv
V 101 30 65 686562.50
V 102 25 65 572135.42
V 103 25 50 260416.67
V 104 25 60 450000.00

RIGIDECES DE LAS VIGAS:

EJE X-X EJE Y-Y

PARA PORTICOS 1-1 Y 5-5 PARA PORTICOS A-A Y


VIGAS Iv(cm4) L(cm) Iv/L(cm3) VIGAS
V1 572135.42 550 1040.25 V1
V2 572135.42 700 817.34 V2
V3 572135.42 550 1040.25 V3
V4 572135.42 500 1144.27 V4
V5 572135.42 550 1040.25
V"4 572135.42 120 4767.80

PARA PORTICOS 2-2, 3-3 Y 4-4 PARA PORTICOS B-B, C-C, D


VIGAS Iv(cm4) L(cm) Iv/L(cm3) VIGAS
V1 260416.67 550 473.48 V1
V2 260416.67 700 372.02 V2
V3 260416.67 550 473.48 V3
V4 260416.67 500 520.83 V4
V5 260416.67 550 473.48
V"4 260416.67 120 2170.14

RIGIDECES LATERALES DE COLUMNAS Y CALCULO DE LAS RIGIDECES DE COLUMNAS EMPOTRAD

COLUMNAS SECCION Ic(cm4) ALTURA(cm)


C-1
C-1 IZQUIERDA
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 30 30 67500.00 280
C-1 DERECHA
1 piso 30 30 67500.00 360
2,3 piso 30 30 67500.00 280
C-2
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-3
C-3 IZQUIERDA
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 35 35 125052.08 280

C-3 DERECHA
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 30 30 67500.00 280
C-4
C-4 IZQUIERDO
1 piso 40 40 213333.33 360
2 piso 35 35 125052.08 280
3,4,5 piso 35 35 125052.08 280
C-4 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-5
C-5 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-5 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-6
C-6 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-6 DERECHA
1 piso 35 35 125052.08 360
2,3 piso 30 30 67500.00 280
C-7
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-8
1 piso 55 55 762552.08 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-9
1 piso 55 55 762552.08 360
2 piso 50 50 520833.33 280
3,4,5 piso 40 40 213333.33 280
C-10
C-10 IZQUIERDO
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-10 DERECHA
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-11
C-11 IZQUIERDO
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-11 DERECHA
1 piso 45 45 341718.75 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280
C-12
C-12 IZQUIERDO
1 piso 50 50 520833.33 360
2 piso 45 45 341718.75 280
3,4,5 piso 40 40 213333.33 280
C-12 DERECHA
1 piso 50 45 379687.50 360
2 piso 40 40 213333.33 280
3,4,5 piso 35 35 125052.08 280

CALCULO DE RIGIDEZ LATERAL DE COLUMNAS EJE X-X:

PORTICOS 1-1 Y 5-
PISO H 48xE/Hi 4*hi
1 360 28.98276 1440 PISO C-1 IZQUIERDA
2 280 37.2635486 1120 1 592.59
3 280 37.2635486 1120 2 446.61
4 280 37.2635486 1120 3 241.07
5 280 37.2635486 1120 4 241.07
5 241.07

PRIMER PISO

KL 55.4696448

SEGUNDO, TERCERO Y CUARTO PISO

KL2 60.3645123
KL3 45.9504969
KL4 43.8221821

QUINTO PISO
KL5 46.3641407

PORTICOS 2-2

PISO H 48xE/Hi 4*hi


1 360 28.98276 1440 PISO C-4 IZQUIERDA
2 280 37.2635486 1120 1 592.59
3 280 37.2635486 1120 2 446.61
4 280 37.2635486 1120 3 446.61
5 280 37.2635486 1120 4 446.61
5 446.61

PRIMER PISO

KL 54.9035942
SEGUNDO, TERCERO Y CUARTO PISO

KL2 49.0648321
KL3 44.1043594
KL4 48.2165029

QUINTO PISO

KL5 55.5829798

PORTICOS 3-3

PISO H 48xE/Hi 4*hi


1 360 28.98276 1440 PISO C-5 IZQUIERDA
2 280 37.2635486 1120 1 949.22
3 280 37.2635486 1120 2 761.90
4 280 37.2635486 1120 3 446.61
5 280 37.2635486 1120 4 446.61
5 446.61

PRIMER PISO

KL 63.2435378

SEGUNDO, TERCERO Y CUARTO PISO

KL2 51.3877505
KL3 45.9115183
KL4 50.7644871

QUINTO PISO

KL5 58.9965552

PORTICOS 4-4
PISO H 48xE/Hi 4*hi
1 360 28.98276 1440 PISO C-6 IZQUIERDA
2 280 37.2635486 1120 1 949.22
3 280 37.2635486 1120 2 761.90
4 280 37.2635486 1120 3 446.61
5 280 37.2635486 1120 4 446.61
5 446.61

PRIMER PISO

KL 63.5742669

SEGUNDO, TERCERO Y CUARTO PISO

KL2 54.3388278
KL3 45.9115183
KL4 50.7644871

QUINTO PISO
KL5 58.9965552

RESUMENES DE RIGIDEZ LATERAL EJE X-X


PORTICO PISO 1 PISO 2 PISO 3 PISO 4 PISO 5
1-1 55.47 60.36 45.95 43.82 46.36
2-2 54.90 49.06 44.10 48.22 55.58
3-3 63.24 51.39 45.91 50.76 59.00
4-4 63.57 54.34 45.91 50.76 59.00
5-5 55.47 60.36 45.95 43.82 46.36
SUMA 292.66 275.52 227.83 237.39 266.30

CALCULO DE RIGIDEZ LATERAL DE COLUMNAS EJE Y-Y:

PORTICOS A-A

PISO H 48xE/Hi 4*hi Ic/


1 360 28.98276 1440 PISO C-1
2 280 37.2635486 1120 1 592.59
3 280 37.2635486 1120 2 446.61
4 280 37.2635486 1120 3 241.07
5 280 37.2635486 1120 4 241.07
5 241.07
PRIMER PISO

KL 42.8038797

SEGUNDO, TERCERO Y CUARTO PISO

KL2 40.2313604
KL3 33.4453783
KL4 33.4453783

QUINTO PISO

KL5 33.4453783

PORTICOS B-B Y C-C


PISO H 48xE/Hi 4*hi Ic/
1 360 28.98276 1440 PISO C-2
2 280 37.2635486 1120 1 949.22
3 280 37.2635486 1120 2 761.90
4 280 37.2635486 1120 3 446.61
5 280 37.2635486 1120 4 446.61
5 446.61

PRIMER PISO

KL 81.6197624

SEGUNDO, TERCERO Y CUARTO PISO

KL2 74.2361707
KL3 58.1016844
KL4 58.1016844

QUINTO PISO

KL5 58.1016844
PORTICOS D-D :

PISO H 48xE/Hi 4*hi Ic/


1 360 28.98276 1440 PISO C-3
2 280 37.2635486 1120 1 592.59
3 280 37.2635486 1120 2 446.61
4 280 37.2635486 1120 3 446.61
5 280 37.2635486 1120 4 446.61
5 446.61

PRIMER PISO

KL 64.1833616

SEGUNDO, TERCERO Y CUARTO PISO


KL2 63.9041656
KL3 54.7879709
KL4 54.7879709

QUINTO PISO

KL5 54.7879709

PORTICOS E-E:

PISO H 48xE/Hi 4*hi Ic/


1 360 28.98276 1440 PISO C-3
2 280 37.2635486 1120 1 592.59
3 280 37.2635486 1120 2 446.61
4 280 37.2635486 1120 3 241.07
5 280 37.2635486 1120 4 241.07
5 241.07

PRIMER PISO
^

KL 56.4823602

SEGUNDO, TERCERO Y CUARTO PISO

KL2 56.289711
KL3 41.2323299
KL4 41.2323299

QUINTO PISO

KL5 41.2323299

PORTICO F-F:
PISO H 48xE/Hi 4*hi Ic/
1 360 28.98276 1440 PISO C-1
2 280 37.2635486 1120 1 187.50
3 280 37.2635486 1120 2 241.07
3 241.07

PRIMER PISO

KL 22.2677442

SEGUNDO

KL2 25.4478938

TERCER PISO

KL5 26.0833611

RESUMENES DE RIGIDEZ LATERAL EJE Y-Y


PORTICO PISO 1 PISO 2 PISO 3 PISO 4
A-A 42.80 40.23 33.45 33.45
B-B 81.62 74.24 58.10 58.10
C-C 81.62 74.24 58.10 58.10
D-D 64.18 63.90 54.79 54.79
E-E 56.48 56.29 41.23 41.23
F-F 22.27 25.45 26.08
SUMA 348.98 334.35 271.75 245.67

LA RIGIDEZ FINAL DE CADA EJE ES:

RIGIDEZ LATERAL EJE MASAS


PISO X-X Y-Y X-X Y-Y
1 292.66 348.98 488.73 488.73
2 275.52 334.35 477.61 477.61
3 227.83 271.75 466.59 466.59
4 237.39 245.67 407.84 407.84
5 266.30 245.67 371.83 371.83

m = 358.63ton m = 358.63ton

K = 266.30 K = 245.67

m = 394.64 ton m = 394.64 ton

K = 237.39 K = 245.67

m = 485.51 ton m = 485.51 ton

K = 227.83 K = 271.75

m = 496.02 ton m = 496.02 ton

K = 275.52 K = 334.35

m = 507.98 ton m = 507.98 ton

K = 292.66 K = 348.98

MODELO DINAMICO X-X MODELO DINAMICO Y-Y

MODELO DINAMICO CON RIGIDEZ DE MUTO


Z LATERAL POR EL METODO DE MUTO

EJE Y-Y

PARA PORTICOS A-A Y F-F


Iv(cm4) L(cm) Iv/L(cm3)
260416.67 450 578.70
260416.67 400 651.04
260416.67 600 434.03
260416.67 450 578.70

PARA PORTICOS B-B, C-C, D-D Y E-E


Iv(cm4) L(cm) Iv/L(cm3)
450000.00 450 1000.00
450000.00 400 1125.00
450000.00 600 750.00
450000.00 450 1000.00

ES DE COLUMNAS EMPOTRADAS :

Ic/L(cm3)
592.59
446.61
241.07

187.50
241.07

949.22
761.90
446.61

592.59
446.61
446.61

592.59
446.61
241.07

592.59
446.61
446.61

347.37
241.07

949.22
761.90
446.61

347.37
241.07

949.22
761.90
446.61

347.37
241.07

1446.76
1220.42
761.90

2118.20
1220.42
761.90

2118.20
1860.12
761.90

949.22
761.90
446.61

949.22
761.90
446.61

1446.76
1220.42
761.90

949.22
761.90
446.61

1446.76
1220.42
761.90

1054.69
761.90
446.61
Ic/Hi
C-1 DERECHA C-2 C-2 C-3 IZQUIERDA C-3 DERECHA SUMA(Ic/Hi)
187.50 949.22 949.22 360 592.59 3631.12
241.07 761.90 761.90 280 446.61 2938.11
241.07 446.61 446.61 280 241.07 1896.44
446.61 446.61 280 241.07 1655.37
446.61 446.61 280 241.07 1655.37
Ic/Hi
C-4 DERECHA C-7 C-7 C-10 IZQUIERDA C-10 DERECHA SUMA(Ic/Hi)
347.37 1446.76 1446.76 949.22 949.22 5731.92
241.07 1220.42 1220.42 761.90 761.90 4652.34
241.07 761.90 761.90 446.61 446.61 3104.72
761.90 761.90 446.61 446.61 2863.65
761.90 761.90 446.61 446.61 2863.65
Ic/Hi
C-5 DERECHA C-8 C-8 C-11 IZQUIERDA C-11 DERECHA SUMA(Ic/Hi)
347.37 2118.20 2118.20 1446.76 949.22 7928.96
241.07 1220.42 1220.42 1220.42 761.90 5426.15
241.07 761.90 761.90 761.90 446.61 3420.01
761.90 761.90 761.90 446.61 3178.94
761.90 761.90 761.90 446.61 3178.94
Ic/Hi
C-6 DERECHA C-9 C-9 C-12 IZQUIERDA C-12 DERECHA SUMA(Ic/Hi)
347.37 2118.20 2118.20 1446.76 1054.69 8034.43
241.07 1860.12 1860.12 1220.42 761.90 6705.54
241.07 761.90 761.90 761.90 446.61 3420.01
761.90 761.90 761.90 446.61 3178.94
761.90 761.90 761.90 446.61 3178.94
Ic/Hi
C-4 C-5 C-6 C-1 SUMA(Ic/Hi)
592.59 949.22 949.22 592.59 3676.22
446.61 761.90 761.90 446.61 2863.65
446.61 446.61 446.61 241.07 1821.99
446.61 446.61 446.61 241.07 1821.99
446.61 446.61 446.61 241.07 1821.99
Ic/Hi
C-7 C-8 C-9 C-2 SUMA(Ic/Hi)
1446.76 2118.20 2118.20 949.22 7581.60
1220.42 1220.42 1860.12 761.90 5824.78
761.90 761.90 761.90 446.61 3178.94
761.90 761.90 761.90 446.61 3178.94
761.90 761.90 761.90 446.61 3178.94
Ic/Hi
C-10 C-11 C-12 C-3 SUMA(Ic/Hi)
949.22 1446.76 1446.76 592.59 5027.92
761.90 1220.42 1220.42 446.61 4095.98
446.61 761.90 761.90 446.61 2863.65
446.61 761.90 761.90 446.61 2863.65
446.61 761.90 761.90 446.61 2863.65
Ic/Hi
C-10 C-11 C-12 C-3 SUMA(Ic/Hi)
949.22 949.22 1054.69 592.59 4138.31
761.90 761.90 761.90 446.61 3178.94
446.61 446.61 446.61 241.07 1821.99
446.61 446.61 446.61 241.07 1821.99
446.61 446.61 446.61 241.07 1821.99
Ic/Hi
C-4 C-5 C-6 C-1 SUMA(Ic/Hi)
347.37 347.37 347.37 187.50 1417.10
241.07 241.07 241.07 241.07 1205.36
241.07 241.07 241.07 241.07 1205.36

ERAL EJE Y-Y


PISO 5
33.45
58.10
58.10
54.79
41.23

245.67

m = 358.63ton

7
m = 394.64 ton

7
m = 485.51 ton

5
m = 496.02 ton

5
m = 507.98 ton

DINAMICO Y-Y
METRADO DE CARGAS EN VIGAS

En el metrado se considera el peso de la losa y s/c para luego solo cargas las vigas en el programa etbas mas no la

PESOS UNITARIOS
CONCRETO ARMADO 2.4 tn/m3
LOSA ALIGERADA 0.3 tn/m2
PESO ACABADO 0.12 tn/m2
PESO TABIQUERIA 0.1 tn/m2
SOBRECARGA 0.2 tn/m2

PESOS
B(m) H(m) PESOS
V 101 0.30 0.65 0.468 tn/m3
V 102 0.25 0.65 0.390 tn/m4
V 103 0.25 0.60 0.360 tn/m5
V 104 0.25 0.50 0.300 tn/m6

VIGAS DEL 1RO AL 3ER NIVEL


Areas Tributarias:

Descripcion Ancho (mts) Largo (mts)


Eje A 2.875 19.250
Eje B 6.250 19.250
Eje C 6.250 19.250
Eje D 5.250 19.250
Eje E 5.250 19.250
Eje F 2.875 19.250
Eje 1 2.375 28.750
Eje 2 4.250 28.750
Eje 3 5.000 28.750
Eje 4 5.250 28.750
Eje 5 2.375 28.750

VIGA EJE A = VIGA EJE F

0.25 x 0.50 m

1 2 3 4 5
EJE A

CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.30 0.30
Carga de Losa 0.30 2.63 0.7875
Acabados 0.12 2.88 0.345
Tabiquería 0.10 2.88 0.2875
SUMA 1.72

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 2.88 0.575

VIGA EJE B = VIGA EJE C

0.25 x 0.60 m

1 2 3 4 5
EJE B

CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.36 0.36
Carga de Losa 0.30 6.00 1.8
Acabados 0.12 6.25 0.75
Tabiquería 0.10 6.25 0.625
SUMA 3.54

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 6.25 1.25

VIGA EJE D = VIGA EJE E

0.25 x 0.60 m

1 2 3 4 5
EJE D

CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.36 0.36
Carga de Losa 0.30 5.00 1.5
Acabados 0.12 5.25 0.63
Tabiquería 0.10 5.25 0.525
SUMA 3.02

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.25 1.05

VIGA EJE 1 = VIGA EJE 5

0.25 x 65.00 m

1 2 3 4 5 6
EJE 1
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.39 0.39
Carga de Losa 0.30 2.13 0.6375
Acabados 0.12 2.38 0.285
Tabiquería 0.10 2.38 0.2375
SUMA 1.55

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 2.38 0.475

VIGA EJE 2

0.30 x 65.00 m

1 2 3 4 5 6
EJE 2
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.47 0.47
Carga de Losa 0.30 4.00 1.2
Acabados 0.12 4.25 0.51
Tabiquería 0.10 4.25 0.425
SUMA 2.60

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 4.25 0.85

VIGA EJE 3

0.30 x 65.00 m

1 2 3 4 5 6
EJE 3

CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.47 0.47
Carga de Losa 0.30 4.75 1.425
Acabados 0.12 5.00 0.6
Tabiquería 0.10 5.00 0.5
SUMA 2.99
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.00 1

VIGA EJE 4

0.30 x 65.00 m

1 2 3 4 5 6
EJE 4

CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.47 0.47
Carga de Losa 0.30 5.00 1.5
Acabados 0.12 5.25 0.63
Tabiquería 0.10 5.25 0.525
SUMA 3.12

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.25 1.05

VIGAS DEL 4TO Y 5TO NIVEL


VIGA EJE A = VIGA EJE F

0.25 x 0.50 m

1 2 3 4 5
EJE A

CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.30 0.30
Carga de Losa 0.30 2.63 0.7875
Acabados 0.12 2.88 0.345
Tabiquería 0.10 2.88 0.2875
SUMA 1.72
CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 2.88 0.575

VIGA EJE B = VIGA EJE C

0.25 x 0.60 m

1 2 3 4 5
EJE B

CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.360 0.36
Carga de Losa 0.30 6.00 1.8
Acabados 0.12 6.25 0.75
Tabiquería 0.10 6.25 0.625
SUMA 3.54

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 6.25 1.25

VIGA EJE D = VIGA EJE E

0.25 x 0.60 m

1 2 3 4 5
EJE D

CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.360 0.36
Carga de Losa 0.30 5.00 1.5
Acabados 0.12 5.25 0.63
Tabiquería 0.10 5.25 0.525
SUMA 3.02

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.25 1.05

VIGA EJE 1 = VIGA EJE 5

0.25 x 65.00 m

1 2 3 4 5
EJE 1
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.390 0.39
Carga de Losa 0.30 2.13 0.6375
Acabados 0.12 2.38 0.285
Tabiquería 0.10 2.38 0.2375
SUMA 1.55

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 2.38 0.475

VIGA EJE 2

0.30 x 65.00 m

1 2 3 4 5
EJE 2

CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.468 0.47
Carga de Losa 0.30 4.00 1.2
Acabados 0.12 4.25 0.51
Tabiquería 0.10 4.25 0.425
SUMA 2.60

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 4.25 0.85

VIGA EJE 3

0.30 x 65.00 m

1 2 3 4 5
EJE 3
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.468 0.47
Carga de Losa 0.30 4.75 1.425
Acabados 0.12 5.00 0.6
Tabiquería 0.10 5.00 0.5
SUMA 2.99

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.00 1

VIGA EJE 4

0.30 x 65.00 m

1 2 3 4 5
EJE 4
CARGAS MUERTAS
METRADO PESO A.T TOTAL(tn/m)
Peso Propio 0.468 0.47
Carga de Losa 0.30 5.00 1.5
Acabados 0.12 5.25 0.63
Tabiquería 0.10 5.25 0.525
SUMA 3.12

CARGAS VIVAS
METRADO PESO A.T TOTAL(tn/m)
Sobrecarga 0.20 5.25 1.05
n el programa etbas mas no la losa.
6
ANALISIS SIMICO ESTATICO

piso peso
1 507.98
2 496.02
3 485.51
4 394.64
5 358.63
suma 2242.78

1.CALCULO DEL CORTANTE BASAL

Los parametros puestos estan en la hoja de


word adjunta en el presente trabajo

V = ( Z.U.C.S / R ) . P

T = hn / Ct

C/R > 0.125

C = 2.5 ( Tp / T ) C < = 2.5

Parametros Valores Descripcion

Z 0.30 Zona 2 ( Huancavelica )


U 1.00 Edificacion para hoteles
S 1.20 Suelo intermedios (S1)
R 8.00 coeficiente de reducción (R) para estructuras regulares
Tp 0.60 Factor que depende de "S"
hn 14.80 Altura total de la edificacion (mts)
Ct 60.00 Coeficiente para estimar el periodo fundamental
T 0.25 Periodo fundamental de la estructura
C calculado 6.08 Coeficiente de amplificacion sismica
C asumido 2.50 Coeficiente de amplificacion sismica
P ( Tn ) 2,242.78 Peso total de la edificacion
V ( Tn ) 252.31 Fuerza cortante en la base de la estructura

2. DISTRIBUCION DE LA FUERZA CORTANTE EN ALTURA

Como T = 0.25seg < 0.7 seg entonces no habra Fa

Pi x hi / ∑ (Pi x
PISO Pi hi Pi x hi Fi Vi
hi)

1 507.98 3.60 1,828.74 0.094 23.72 252.56


2 496.02 6.40 3,174.52 0.163 41.13 228.84
3 485.51 9.20 4,466.68 0.229 57.78 187.72
4 394.64 12.00 4,735.68 0.243 61.31 129.94
5 358.63 14.80 5,307.65 0.272 68.63 68.62
2,242.78 19,513.28 252.56

68.63
68.62

61.31
129.94

57.78
187.72

41.13
228.84

23.72
252.56

Fuerzas Inerciales ( Fi ) Fuerzas Cortantes ( Vi )

3. COMBINACIONES DE CARGA.

U  1.4CM  1.7CV
U  1.25 (CM  CV )  CS
U  0.9CM  CS
Todas las combinaciones de carga generadas seran ingresadas al programa SAP 2000:
Comb 1 1.4 CM + 1.7 CV
Comb 21 1.25 ( CM + CV )+ SISMO X
Comb 22 1.25 ( CM + CV ) - SISMO X
Comb 23 0.90 CM + SISMO X
Comb 24 0.90 CM - SISMO X
Comb 25 1.25 ( CM + CV ) + SISMO Y
Comb 26 1.25 ( CM + CV ) - SISMO Y
Comb 27 0.90 CM + SISMO Y
Comb 28 0.90 CM - SISMO Y
Envolv x De todas las combinaciones referidas a x
Envolv y De todas las combinaciones referidas a y

4. DEZPLAZAMIENTOS Y CONTROL DE DERIVAS.

4.1. PRIMER MODELO SIN MURO DE CORTE:

RESULTADOS OBTENIDOS DEL PROGRAMA ETABS DE LA COMBINACION DESPLAZAMIENTO EN "X E Y"


COMUN
DESPLAZ. "X" "Y" "H(m)"
5to NIVEL 0.164904 -0.170871 2.8
4to NIVEL 0.146821 -0.153271 2.8
3er NIVEL 0.115112 -0.12079 2.8
2do NIVEL 0.076125 -0.079656 2.8
1er NIVEL 0.03934 0.040805 3.6
Nota: Medidas en Metros

DERIVAS (COMUN) VERIFICANDO


DESPLAZ. "X" "Y" "X" "Y"
5to NIVEL 0.0065 0.0063 ok ok
4to NIVEL 0.0113 0.0116 error error
3er NIVEL 0.0139 0.0147 error error
2do NIVEL 0.0131 0.0430 error error
1er NIVEL 0.0109 0.0113 error error
Nota: Medidas en Metros

COMO LAS DERIVAS DE PISO SON MAYORES QUE 0.007m ENTONCES AGREGAREMOS MUROS DE CORTE.
LOS MUROS DE CORTE SERAN DE 0.3M DE ESPESOR

4.1. SEGUNDO MODELO CON MURO DE CORTE:

RESULTADOS OBTENIDOS DEL PROGRAMA ETABS DE LA COMBINACION DESPLAZAMIENTO EN "X E Y"

COMUN
DESPLAZ. "X" "Y" "H(m)"
5to NIVEL 0.011061 -0.014394 2.8
4to NIVEL 0.008347 -0.010874 2.8
3er NIVEL 0.005664 -0.00746 2.8
2do NIVEL 0.003202 -0.004221 2.8
1er NIVEL 0.00123 -0.00162 3.6
Nota: Medidas en Metros

DERIVAS (COMUN) VERIFICANDO


DESPLAZ. "X" "Y" "X" "Y"
5to NIVEL 0.0010 0.0013 ok ok
4to NIVEL 0.0010 0.0012 ok ok
3er NIVEL 0.0009 0.0012 ok ok
2do NIVEL 0.0007 0.0009 ok ok
1er NIVEL 0.0003 0.0005 ok ok
Nota: Medidas en Metros

COMO LAS DERIVAS DE PISO SON MENORES QUE 0.007m ENTONCES CUMPLE CON
LOS REQUERIMIENTO QUE BRINDA LA NORMA E.030.