( E.E )
NAMA PEKERJAAN
KONSULTAN PERENCANA
TAHUN ANGGARAN 2018
BANYUWANGI
REKAPITULASI
1 2
I. PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
V PEKERJAAN DINDING
VI PEKERJAAN LANTAI
IX PEKERJAAN PLAFOND
A. JUMLAH PEKERJAAN
B. PPN 10%
C. TOTAL PEKERJAAN
D. DIBULATKAN
E. TERBILANG : Dua Ratus Tujuh Puluh Empat Juta Sepuluh Ribu Rupiah
REKAPITULASI
JUMLAH
HARGA
3
240,239,770.42
728,489,571.08
24,907,946.47
36,833,216.11
74,182,728.37
8,997,274.98
8,600,000.00
49,697,627.42
21,896,266.77
2,033,527.81
500,000.00
1,196,377,929.42
119,637,792.94
1,316,015,722.36
1,316,010,000.00
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran dan PemasanganBowplank 440.00 M1 A. 2.2.1.4
2 Laporan dan Foto Dokumentasi 1.00 Ls Ls
3 Pembersihan dan Perataan 8,500.00 M2 A. 2.2.1.9
1 2 3 4 5
V. PEKERJAAN DINDING
1 Pasangan Batu Bata Transraam Camp.1Pc : 2Ps 55.45 M2 A. 4.4.1.7
2 Pasangan Batu Bata Camp.1Pc : 4Ps 113.34 M2 A. 4.4.1.9
3 Pasangan Plesteran Camp.1Pc : 2ps 79.10 M 2
A. 4.4.2.2
4 Pasangan Plesteran Camp.1Pc : 4ps 226.68 M2 A. 4.4.2.4
5 Pengecatan Dinding Luar dan Dalam 273.98 M 2
A .4.7.1.10
No. URAIAN PEKERJAAN VOLUME SATUAN ANALISA
1 2 3 4 5
1 2 3 4 5
6 7
Rp 98,862.49 Rp 43,499,497.42
Rp 1,200,000.00 Rp 1,200,000.00
Rp 23,004.74 Rp 195,540,273.00
Rp 118,198.04 Rp 25,648,973.60
Rp 27,991.23 Rp 6,127,000.33
Rp 112,680.26 Rp 298,078,506.82
Rp 329,953.45 Rp 327,315,652.97
Rp 329,953.45 Rp 71,319,437.35
Rp 1,264,281.54 Rp 22,425,193.85
Rp 656,118.56 Rp 2,482,752.62
Rp 1,546,792.06 Rp 2,743,622.42
Rp 26,431.39 Rp 4,110,723.83
Rp 214,967.17 Rp 5,083,973.48
Rp 1,546,792.06 Rp 2,382,059.78
Rp 26,431.39 Rp 5,373,569.82
Rp 316,686.38 Rp 4,876,970.21
HARGA SATUAN JUMLAH HARGA
6 7
Rp 1,546,792.06 Rp 2,194,897.94
Rp 26,431.39 Rp 4,025,530.14
Rp 319,337.66 Rp 6,041,868.51
Rp 211,216.35 Rp 11,711,946.37
Rp 194,948.41 Rp 22,095,453.06
Rp 109,483.21 Rp 8,660,122.30
Rp 101,123.65 Rp 22,922,709.53
Rp 32,091.75 Rp 8,792,497.11
6 7
Rp 337,735.55 Rp 8,997,274.98
Rp 1,800,000.00 Rp 3,600,000.00
Rp 1,200,000.00 Rp 2,400,000.00
Rp 1,300,000.00 Rp 2,600,000.00
Rp 148,200.24 Rp 20,789,529.04
Rp 135,421.97 Rp 18,996,993.50
Rp 148,072.48 Rp 1,776,869.78
Rp 171,680.77 Rp 8,134,235.10
Rp 68,191.16 Rp 6,364,526.57
Rp 109,541.61 Rp 10,223,912.54
Rp 32,091.75 Rp 2,995,238.37
Rp 48,891.95 Rp 2,312,589.28
Rp 65,000.00 Rp 65,000.00
Rp 250,000.00 Rp 500,000.00
Rp 128,875.19 Rp 773,251.12
Rp 85,750.19 Rp 343,000.75
HARGA SATUAN JUMLAH HARGA
6 7
Rp 71,375.19 Rp 71,375.19
Rp 70,225.19 Rp 280,900.75
Rp 500,000.00 Rp 500,000.00
Err:509
LEBAR LEBAR
No. URAIAN PEKERJAAN PANJANG TINGGI
BAWAH ATAS
1 2
I. PEKERJAAN PERSIAPAN
1 Pengukuran dan PemasanganBowplank 8 10
2 Pembuatan papan pengenal proyek
3 Laporan dan Foto Dokumentasi
4 Pengukuran Kembali
5 Pembersihan dan Perataan 8 10
6 Sewa Barak dan gudang
1 2
-Total Volume
- Bekisting Sloof 47.3 0.15 0.25
3 Pekerjaan Kolom uk. 20 x 20 cm
- Cor beton K 250 3.5 0.2 0.2
- Besi beton -Tulangan Utama 4.45
-Tulangan Sengkang 0.69 0.2 0.25
-Total Volume
- Bekisting Kolom 3.5 0.2 0.2
4 Pekerjaan Ring Balok uk. 15 x 20 cm
- Cor beton K 250 47.3 0.15 0.2
- Besi beton 48.91
0.59 0.15 0.2
V. PEKERJAAN DINDING
1 Pasangan Batu Bata Transraam Camp.1Pc : 2Ps 47.3 0.5
2 Pasangan Batu Bata Camp.1Pc : 4Ps 47.3 3
3 Pasangan Plesteran Camp.1Pc : 2ps 47.3 0.5
4 Pasangan Plesteran Camp.1Pc : 4ps 47.3 3
5 Pengecatan Dinding Luar dan Dalam 32
LEBAR LEBAR
No. URAIAN PEKERJAAN PANJANG TINGGI
BAWAH ATAS
1 2
4 Profil Gypsum
1 Box Zakering
2 Kabel NYM
3 Lampu Tl 40 Watt
LEBAR LEBAR
No. URAIAN PEKERJAAN PANJANG TINGGI
BAWAH ATAS
1 2
5 Sakelar Ganda
6 Stop Kontak
1 Pembersihan Akhir
ACKUP DATA
36.00 M1
1.00 Ls
1.00 Ls
1.00 Ls
80.00 Ls
1.00 Ls
0.8 37.80 M3
13.01 M3
63.62 M3
2.37 M3
1.89 M3
17.74 M3
3.78 M3
1.77 M3
10 4 120.61 Kg
6 242 34.92
TEBAL DIAMETER UNIT LUAS VOLUME SATUAN
155.52 Kg
23.65 M2
11 1.54 M3
12 4 173.82 Kg
6 18 29.48
203.30 Kg
11 15.40 M2
1.42 M3
10 4 120.61 Kg
6 242 31.69
152.30 Kg
18.92 M2
55.45 M2
113.34 M2
79.10 M2
226.68 M2
273.98 M2
TEBAL DIAMETER UNIT LUAS VOLUME SATUAN
26.64 M2
0.04 M3
3.36 M2
6.00 Bh
1.00 Bh
1.00 Unit
0.21 M3
4 30 140.28 M2
4 30 140.28 M2
4 12.00 M1
4 47.38 M1
93.33 M2
93.33 M2
93.33 M2
47.30 M1
1.00 Unit
2.00 Glg
6.00 Unit
TEBAL DIAMETER UNIT LUAS VOLUME SATUAN
4.00 Unit
1.00 Unit
4.00 Unit
1.00 Ls
ANALISA SATUAN PEKERJAAN
B Bahan
Kayu Balok 5/7 M3 0.0120
A. 2.2.1.4
Paku Biasa Campur Kg 0.0200
Kayu Papan 3/20 M3 0.0070
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
A. 2.2.1.9
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
Tanah Timbunan Pilihan (Urug) M3 1.2000
T.14.a
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
A. 2.3.1.1
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
6 Pengurugan Kembali 1 m3 Galian dihitung 1/3 kali dari Koefisien Pekerjaan Galian
A Tenaga
Pekerja L.01 OH 0.1667
Mandor L.04 OH 0.0167
B Bahan
A. 2.3.1.9
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
7 Pengurugan 1 m3 Dengan Pasir Urug
A Tenaga
Pekerja L.01 OH 0.3000
Mandor L.04 OH 0.0100
B Bahan
Pasir Urug M3 1.2000
A. 2.3.1.11
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
Batu belah m3 1.2000
A. 3.2.1.2 Semen PC Kg 163.0000
Pasir Pasang m3 0.5200
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
Batu belah m3 1.2000
A.3.2.1.9
Pasir Urug Kg 0.4320
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
12 Membuat 1 m3 beton mutu fc'=21,7 Mpa (K250), Slump (12±2) cm, w/c=0,56
A Tenaga
Pekerja L.01 OH 1.6500
Tukang Batu L.02 OH 0.2750
Kepala Tukang L.03 OH 0.0280
Mandor L.04 OH 0.0830
B Bahan
Semen PC Kg 384.0000
A. 4.1.1.8 Pasir Beton Kg 692.0000
Agregat Pecah Mesin2/3 Kg 1,039.0000
Air Ltr 215.0000
A. 4.1.1.8
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
A. 4.1.1.17 Besi Polos Kg 10.5000
Kawat Beton Kg 0.1500
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
15 Pemasangan 1 M2 Bekisting untuk Pondasi 2X Pakai
A Tenaga
Pekerja L.01 OH 0.5200
Tukang Kayu L.02 OH 0.2600
Kepala Tukang L.03 OH 0.0260
Mandor L.04 OH 0.0260
B Bahan
Kayu Kelas III (lokal) M3 0.0200
A. 4.1.1.20
Paku Biasa Campur Kg 0.1500
Minyak Bekisting Ltr 0.0500
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kelas III (lokal) M3 0.0225
A. 4.1.1.21
Paku Biasa Campur Kg 0.1500
Minyak Bekisting Ltr 0.0500
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kelas III (lokal) M3 0.0200
Paku Biasa Campur Kg 0.2000
A. 4.1.1.22 Minyak Bekisting Ltr 0.1000
Kayu Kelas II (lokal) M3 0.0075
Triplek 9 mm (122 x 244 cm) Lbr 0.1750
Kayu Dolken / Kelas IV Btg 1.0000
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
18 Pemasangan 1 M2 Bekisting untuk Balok 2X Pakai
A Tenaga
Pekerja L.01 OH 0.6600
Tukang Kayu L.02 OH 0.3300
Kepala Tukang L.03 OH 0.0330
Mandor L.04 OH 0.0330
B Bahan
Kayu Kelas III (lokal) M3 0.0200
Paku Biasa Campur Kg 0.2000
A. 4.1.1.23 Minyak Bekisting Ltr 0.1000
Kayu Kelas II (lokal) M3 0.0090
Triplek 9 mm (122 x 244 cm) Lbr 0.1750
Kayu Dolken / Kelas IV Btg 1.0000
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
27 Pemasangan 1 M2 langit - langit gypsum baord ukuran (120 x 240 x 9)mm,tebal 9mm
A Tenaga
Pekerja L.01 OH 0.1000
Tukang Besi L.02 OH 0.0500
Kepala Tukang L.03 OH 0.0050
Mandor L.04 OH 0.0050
B Bahan
A. 4.5.1.7
Gypsum board Lbr 0.3640
Paku Sekrup kg 0.1100
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
A.4.5.1.9 List Profil Kayu M 1.0500
Paku Kg 0.0100
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
29 Pemasangan 1 M2 Dinding Bata Merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
A Tenaga
Pekerja L.01 OH 0.3000
Tukang Batu L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0150
B Bahan
Batu Bata 5 x 11 x 22 Bh 70.0000
A. 4.4.1.7
Semen PC Kg 18.9500
Pasir Pasang M3 0.0380
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
30 Pemasangan 1 M2 Dinding Bata Merah (5x11x22) cm tebal ½ batu campuran 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.3000
Tukang Batu L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0150
B Bahan
Batu Bata 5 x 11 x 22 Bh 70.0000
A. 4.4.1.9
A. 4.4.1.9
Semen PC Kg 11.5000
Pasir Pasang M3 0.0430
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
A. 4.4.2.2 Semen PC Kg 10.2240
Pasir Pasang M3 0.0200
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
33 Pemasangan 1 M2 Plesteran 1SP : 4PP tebal 15 mm
A Tenaga
Pekerja L.01 OH 0.3000
Tukang Batu L.02 OH 0.1500
Kepala Tukang L.03 OH 0.0150
Mandor L.04 OH 0.0150
B Bahan
A. 4.4.2.4 Semen PC Kg 6.2400
Pasir Pasang M3 0.0240
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
Keramik 40 x 40 cm Bh 6.5625
A.4.4.3.36 Semen PC Kg 10.4000
Pasir Pasang M3 0.0450
Semen Warna Kg 0.5000
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
SNI.7393:2008
(6.20) Baja Ringan C75 M2 1.0500
C Peralatan
Ls 1.0000
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
SNI.03-3436-
Kepala Tukang L.03 OH 0.0080
Mandor L.04 OH 0.0080
B Bahan
SNI.03-3436-
2002 (6.32) Atap Zinclaume M2 1.0000
Paku Ring Kg 0.1000
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
A .4.5.2.37 Rabung Zincalum 0m3mm Bh 1.1000
Paku biasa 1/2" - 1" Kg 0.0500
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
Balok kayu m3 1.1000
A.4.6.1.1
Paku 10cm Kg 1.2500
Lem Kayu Kg 1.0000
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
Papan Kayu m3 0.0400
A.4.6.1.5
Lem Kayu Kg 0.5000
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
A .4.6.2.2
Kunci Tanam Biasa Bh 1.0000
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
A .4.6.2.5
Engsel Pintu Bh 1.0000
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
45 Pemasangan 1 M2 Bidang Kayu Baru (1 lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
A Tenaga
Pekerja L.01 OH 0.0700
Tukang Cat L.02 OH 0.0090
Kepala Tukang L.03 OH 0.0060
Mandor L.04 OH 0.0030
B Bahan
Cat Menie Kg 0.2000
Plamur Kg 0.1500
Cat Dasar Kg 0.1700
A .4.7.1.4
Cat Penutup Kg 0.2600
Kuas Bh 0.0100
Pengencer Kg 0.0300
Ampelas Lbr 0.2000
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
46 Pengecatan 1 M2 Tembok Baru ( 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
A Tenaga
Pekerja L.01 OH 0.0200
Tukang Cat L.02 OH 0.0630
Kepala Tukang L.03 OH 0.0063
Mandor L.04 OH 0.0030
B Bahan
Plamur Kg 0.1000
A .4.7.1.10
Cat dasar Kg 0.1000
Cat Penutup Kg 0.2600
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
SNI 03-3434-
Lisplank GRC M' 1.10
2002(6.51)
Paku Biasa 2"-5" Kg 0.06
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
61 Pasang 1 Titik Instalasi Penerangan dan Stop Kontak dengan Kabel NYA 3 x 2,5 mm
A Tenaga
Pekerja L.01 OH 0.25
Tukang L.02 OH 0.25
Kepala Tukang L.03 OH 0.03
PK Supl.1
Mandor L.04 OH 0.00
B Bahan
Kabel NYA 3x2,5 mm M' 9.00
PK Supl.1
Conduit Btg 3.00
Alat bantu Ls 1.00
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
PK Supl.2 Lampu TL 1 x 40 Watt M' 1.00
Alat bantu Ls 1.00
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
PK Supl.4 Lampu Downlight M' 1.00
Alat bantu Ls 1.00
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
PK Supl.6 Stop Kontak Tanam M' 1.00
PK Supl.6
Alat bantu Ls 1.00
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
B Bahan
PK Supl.8 Saklar Ganda M' 1.00
Alat bantu Ls 1.00
C Peralatan
D Jumlah (A+B+C)
E Over Head & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
NALISA SATUAN PEKERJAAN
98,862.49
132,541.20 13,254.12
168,688.80 16,868.88
180,738.00 1,807.38
135,000.00 675.00
2,789,389.80 33,472.68
18,180.00 363.60
2,789,389.80 19,525.73
85,967.39
12,895.11
98,862.49
23,004.74
132,541.20 13,254.12
135,000.00 6,750.00
20,004.12
3,000.62
23,004.74
112,680.26
132,541.20 43,738.60
135,000.00 4,050.00
45,540.00 54,648.00
102,436.60
10,243.66
112,680.26
118,198.04
132,541.20 99,405.90
135,000.00 3,375.00
102,780.90
15,417.14
118,198.04
27,991.23
132,541.20 22,090.20
135,000.00 2,250.00
24,340.20
3,651.03
27,991.23
329,953.45
132,541.20 39,762.36
135,000.00 1,350.00
204,836.40 245,803.68
286,916.04
43,037.41
329,953.45
1,264,281.54
132,541.20 198,811.80
168,688.80 126,516.60
180,738.00 13,555.35
135,000.00 10,125.00
250,470.00 300,564.00
2,048.40 333,889.20
222,910.20 115,913.30
1,099,375.25
164,906.29
1,264,281.54
656,118.56
132,541.20 103,382.14
168,688.80 65,788.63
180,738.00 7,048.78
135,000.00 5,265.00
250,470.00 300,564.00
204,836.40 88,489.32
570,537.87
85,580.68
656,118.56
1,546,792.06
132,541.20 218,692.98
168,688.80 46,389.42
180,738.00 5,060.66
135,000.00 11,205.00
2,048.40 786,585.60
159.22 110,181.33
160.66 166,921.58
-
1,345,036.58
201,755.49
1,546,792.06
264,313.89
132,541.20 9,277.88
168,688.80 11,808.22
180,738.00 1,265.17
135,000.00 540.00
19,278.90 202,428.45
30,123.00 4,518.45
229,838.17
34,475.72
264,313.89
206,947.67
132,541.20 68,921.42
168,688.80 43,859.09
180,738.00 4,699.19
135,000.00 3,510.00
2,789,389.80 55,787.80
18,180.00 2,727.00
9,000.00 450.00
179,954.50
26,993.17
206,947.67
214,967.17
132,541.20 68,921.42
168,688.80 43,859.09
180,738.00 4,699.19
135,000.00 3,510.00
2,789,389.80 62,761.27
18,180.00 2,727.00
9,000.00 450.00
186,927.97
28,039.20
214,967.17
316,686.38
132,541.20 87,477.19
168,688.80 55,667.30
180,738.00 5,964.35
135,000.00 4,455.00
2,789,389.80 55,787.80
18,180.00 3,636.00
9,000.00 900.00
1,536,975.00 11,527.31
58,300.00 10,202.50
39,762.00 39,762.00
275,379.46
41,306.92
316,686.38
319,337.66
132,541.20 87,477.19
168,688.80 55,667.30
180,738.00 5,964.35
135,000.00 4,455.00
2,789,389.80 55,787.80
18,180.00 3,636.00
9,000.00 900.00
1,536,975.00 13,832.78
58,300.00 10,202.50
39,762.00 39,762.00
277,684.92
41,652.74
319,337.66
68,191.16
132,541.20 13,254.12
168,688.80 8,434.44
180,738.00 903.69
135,000.00 675.00
85,383.00 31,079.41
45,000.00 4,950.00
59,296.66
8,894.50
68,191.16
48,891.95
132,541.20 6,627.06
168,688.80 8,434.44
180,738.00 903.69
135,000.00 405.00
24,471.00 25,694.55
45,000.00 450.00
42,514.74
6,377.21
48,891.95
211,216.35
132,541.20 39,762.36
168,688.80 16,868.88
180,738.00 1,807.38
135,000.00 2,025.00
1,084.50 75,915.00
2,048.40 38,817.18
222,910.20 8,470.59
183,666.39
27,549.96
211,216.35
194,948.41
132,541.20 39,762.36
168,688.80 16,868.88
180,738.00 1,807.38
135,000.00 2,025.00
1,084.50 75,915.00
2,048.40 23,556.60
222,910.20 9,585.14
169,520.36
25,428.05
194,948.41
109,483.21
132,541.20 39,762.36
168,688.80 25,303.32
180,738.00 2,711.07
135,000.00 2,025.00
2,048.40 20,942.84
222,910.20 4,458.20
95,202.80
14,280.42
109,483.21
101,123.65
132,541.20 39,762.36
168,688.80 25,303.32
180,738.00 2,711.07
135,000.00 2,025.00
2,048.40 12,782.02
222,910.20 5,349.84
87,933.61
13,190.04
101,123.65
337,735.55
132,541.20 92,778.84
168,688.80 59,041.08
180,738.00 6,325.83
135,000.00 4,725.00
14,860.65 97,523.02
2,048.40 21,303.36
222,910.20 10,030.96
3,910.00 1,955.00
293,683.08
44,052.46
337,735.55
148,200.24
132,541.20 13,254.12
168,688.80 42,172.20
180,738.00 4,518.45
135,000.00 675.00
65,000.00 68,250.00
-
35,000.00 35,000.00
128,869.77
19,330.47
148,200.24
135,421.97
132,541.20 18,555.77
168,688.80 12,651.66
180,738.00 1,445.90
135,000.00 1,080.00
79,524.90 79,524.90
45,000.00 4,500.00
117,758.23
17,663.73
135,421.97
148,072.48
132,541.20 33,135.30
168,688.80 25,303.32
180,738.00 2,711.07
135,000.00 1,755.00
59,040.90 64,944.99
18,180.00 909.00
128,758.68
19,313.80
148,072.48
11,684,397.88
132,541.20 927,788.40
168,688.80 3,542,464.80
180,738.00 379,549.80
135,000.00 47,250.00
4,717,261.80 5,188,987.98
20,484.00 25,605.00
48,700.00 48,700.00
10,160,345.98
1,524,051.90
11,684,397.88
1,049,512.39
132,541.20 132,541.20
168,688.80 506,066.40
180,738.00 54,221.40
135,000.00 6,750.00
4,717,261.80 188,690.47
48,700.00 24,350.00
912,619.47
136,892.92
1,049,512.39
220,541.61
132,541.20 1,325.41
168,688.80 84,344.40
180,738.00 9,036.90
135,000.00 675.00
96,393.60 96,393.60
191,775.31
28,766.30
220,541.61
84,242.91
132,541.20 1,988.12
168,688.80 25,303.32
180,738.00 2,711.07
135,000.00 1,080.00
42,172.20 42,172.20
73,254.71
10,988.21
84,242.91
52,459.40
132,541.20 9,277.88
168,688.80 1,518.20
180,738.00 1,084.43
135,000.00 405.00
78,319.80 15,663.96
7,000.00 1,050.00
34,400.00 5,848.00
34,400.00 8,944.00
14,040.00 140.40
9,500.00 285.00
7,000.00 1,400.00
45,616.87
6,842.53
52,459.40
32,091.75
132,541.20 2,650.82
168,688.80 10,627.39
180,738.00 1,138.65
135,000.00 405.00
7,000.00 700.00
34,400.00 3,440.00
34,400.00 8,944.00
27,905.87
4,185.88
32,091.75
6,134,330.00
70,000.00 840,000.00
22,000.00 902,000.00
40,000.00 440,000.00
7,500.00 240,000.00
8,500.00 144,500.00
3,000.00 96,000.00
3,500.00 143,500.00
200.00 8,200.00
45,000.00 2,520,000.00
5,334,200.00
800,130.00
6,134,330.00
171,680.77
132,541.20 19,881.18
168,688.80 42,172.20
180,738.00 4,518.45
135,000.00 10,125.00
65,000.00 71,500.00
18,180.00 1,090.80
149,287.63
22,393.14
171,680.77
198,137.47
132,541.20 33,135.30
168,688.80 42,172.20
180,738.00 4,518.45
135,000.00 337.50
3,570.00 32,130.00
15,000.00 45,000.00
15,000.00 15,000.00
172,293.45
25,844.02
198,137.47
128,875.19
132,541.20 13,254.12
168,688.80 16,868.88
180,738.00 1,807.38
135,000.00 135.00
65,000.00 65,000.00
15,000.00 15,000.00
112,065.38
16,809.81
128,875.19
85,750.19
132,541.20 13,254.12
168,688.80 16,868.88
180,738.00 1,807.38
135,000.00 135.00
27,500.00 27,500.00
15,000.00 15,000.00
74,565.38
11,184.81
85,750.19
70,225.19
132,541.20 13,254.12
168,688.80 16,868.88
180,738.00 1,807.38
135,000.00 135.00
14,000.00 14,000.00
15,000.00 15,000.00
61,065.38
9,159.81
70,225.19
71,375.19
132,541.20 13,254.12
168,688.80 16,868.88
180,738.00 1,807.38
135,000.00 135.00
15,000.00 15,000.00
15,000.00 15,000.00
62,065.38
9,309.81
71,375.19
DAFTAR HARGA SATUAN UPA
PEKERJAAN :
:
LOKASI :
1 2
1 Pekerja
2 Mandor
3 Tukang
4 Kepala Tukang
1 2
A. TIMBUNAN / GALIAN
1 Tanah Timbun
2 Pasir Urug
3 Pasir Pasang
B. BAHAN PEREKAT
1 Portland Cement (PC)
2 Cement Putih
C. BATU / PASIR
1 Batu Pecah 2 - 3 cm
2 Batu Pecah 3 - 5 cm
3 Batu Pecah 5 - 7 cm
4 Batu Belah / Kali 10 - 15 cm
5 Batu Belah / Kali 15 - 20 cm
6 Batu Crusher 1 - 2 cm
7 Batu Crusher 2 - 3 cm
8 Batu Crusher 3 - 5 cm
9 Batu Bata Biasa
10 Batu Bata Besar
D. KAYU / LANGIT - LANGIT
1 Kayu Meranti Biasa
2 Kayu Sembarang Keras
HARGA SATUAN UPAH DAN BAHAN 2017
HARGA
SATUAN SATUAN
( Rp. )
3 4
Org/Hari 132,541.20
OH 135,000.00
OH 168,688.80
OH 180,738.00
HARGA
SATUAN SATUAN
( Rp. )
3 4
m³ 45,540.00
m³ 204,836.40
m³ 222,910.20
Kg 2,048.40
Kg 3,910.00
m³ 216,885.60
m³ 455,400.00
m³ 216,885.60
m³ 250,470.00
m³ 250,470.00
m³ 372,000.00
m³ 285,695.00
m³ 260,000.00
Bh 1,084.50
Bh 870.00
m³ 4,717,261.80
m³ 1,536,975.00
DAFTAR HARGA SATUAN UPA
PEKERJAAN :
:
LOKASI :
1 2
3 Kayu Sembarang Biasa
4 Kayu Lat Asbes
5 Kayu Dolken / Kayu laut Ø 7 -10 cm ( 300 cm )
6 Gipsum t = 9 mm
7 Propil Gipsum Biasa
8 Tepung gypsum
9 Paku skrup
10 Rangka Puring
11 Kawat diameter 4 mm
12 Tripleks 120 x 240 cm, t = 9 mm
13 Tripleks 120 x 240 cm, t = 6 mm
14 Tripleks 120 x 240 cm, t = 4 mm
15 Tripleks 120 x 240 cm, t = 3 mm
E. BESI / ALLUMINIUM
1 Besi Beton Polos
2 Besi Profil
3 Besi Siku
4 Besi Pelat t = 5 mm
5 Pipa Besi Ø 1,5 "
6 Pipa Besi Ø 1 "
7 Kawat Besi Beton
8 Paku Biasa 0,5 - 2"
9 Paku Biasa 2 - 5"
10 Kawat Las Besi
F. PENUTUP LANTAI DAN DINDING
1 Ubin Keramik 20 x 20 cm (warna)
2 Ubin Keramik 20 x 25 cm (warna)
3 Ubin Keramik 25 x 25 cm (warna)
4 Ubin Keramik 25 x 40 cm (warna)
HARGA SATUAN UPAH DAN BAHAN 2017
HARGA
SATUAN SATUAN
( Rp. )
3 4
m³ 2,789,389.80
m' 5,688.00
Btg 39,762.00
Lbr 85,383.00
Btg 24,471.00
Kg 16,300.00
Kg 45,000.00
M' 5,000.00
Kg 29,700.00
m2 58,300.00
m2 35,400.00
m2 31,600.00
m2 25,700.00
Kg 19,278.90
Kg 12,180.00
Kg 12,180.00
Kg 12,180.00
m' 50,900.00
m' 42,300.00
Kg 30,123.00
Kg 18,180.00
Kg 20,484.00
Kg 28,917.90
Bh 14,860.65
Bh 12,675.00
Bh 5,700.00
Bh 10,800.00
DAFTAR HARGA SATUAN UPA
PEKERJAAN :
:
LOKASI :
1 2
5 Ubin Keramik 30 x 30 cm (warna)
6 Ubin Keramik 40 x 40 cm (warna)
7 Batu Alam
HARGA SATUAN UPAH DAN BAHAN 2017
HARGA
SATUAN SATUAN
( Rp. )
3 4
Bh 12,330.00
Bh 14,860.65
m2 229,258.80
DAFTAR HARGA SATUAN UPA
PEKERJAAN :
:
LOKASI :
1 2
G. PENUTUP ATAP
1 Profil C 75 mm
2 Atap Zincalum tebal 0,30mm
3 Atap Prima deck warna tebal 0,35mm
4 Nok Genteng Metal
5 Reng 35
6 Secrew Truss
7 Fisher Baut
8 Krekeat siku
9 Dynabolt
10 Atap Seng Gelombang 3' x 6'
11 Rabung Seng BJLS 20 3' x 6'
12 Listplank GRC
13 Rangka Utama ( Main Tee)
14 Rangka Silang (Cross Tee)
15 Rangka Ke dinding (Wall angle )
16 Penggantung (Adjustable Hanger Clip)
17 Pengikat (Suspension Rod) 3mm x 2400mm
18 Braket Sudut (Angle Bracket)
19 Paku Ramset
20 Paku Beton
HARGA
SATUAN SATUAN
( Rp. )
3 4
kg 14,950.00
m² 79,524.90
m² 64,200.00
m' 59,040.90
kg 14,950.00
Bh 500.00
Bh 2,000.00
Bh 10,000.00
Bh 2,000.00
lbr 69,100.00
lbr 36,300.00
m1 65,000.00
btg 70,000.00
btg 22,000.00
btg 40,000.00
bh 7,500.00
bh 8,500.00
bh 3,000.00
bh 3,500.00
bh 200.00
Bh 96,393.60
Bh 82,400.00
Bh 42,172.20
Bh 30,123.00
Bh 22,500.00
Bh 25,300.00
DAFTAR HARGA SATUAN UPA
PEKERJAAN :
:
LOKASI :
1 2
7 Hak Angin Lipat
8 Handel Jendela
9 Kaca Bening, t = 5 mm
10 Kaca buram, t = 5 mm
11 Kaca Reyben, t = 5 mm
I. CAT / MINYAK
1 Cat Dasar
2 Cat Tembok Setara Vinilex
3 Cat Minyak Untuk Kayu
4 Cat Minyak Untuk Besi
5 Cat Menie Kayu
6 Plamir
7 Dempul Gypsum
8 Minyak Cat
9 Lem Kayu
10 Kuas
11 Ampelas
12 Minyak Bekisting
J. LISTRIK / ACSESORIES
1 Lampu TL 40 W
2 Lampu Hemat Energi 28 Watt
3 Saklar Tunggal
4 Saklar Ganda
5 Stop Kontak
6 Zekring Box
7 Kabel Listrik NYYM 1x 25 mm
8 Fitting
9 Instalasi Listrik
10 Pipa Kabel Listrik
HARGA SATUAN UPAH DAN BAHAN 2017
HARGA
SATUAN SATUAN
( Rp. )
3 4
Bh 25,300.00
Bh 11,000.00
Kaki 23,700.00
Kaki 30,700.00
Kaki 27,700.00
Kg 34,400.00
Kg 39,156.30
Kg 69,800.00
Kg 69,800.00
Kg 78,319.80
Kg 7,000.00
Kg 16,300.00
Kg 32,700.00
Kg 48,700.00
bh 14,040.00
lbr 7,000.00
ltr 9,000.00
Bh 65,000.00
Bh 27,500.00
Bh 4,000.00
Bh 15,000.00
Bh 14,000.00
Unit 108,300.00
m' 3,570.00
Bh 11,900.00
titik 154,800.00
m' 5,166.67
DAFTAR HARGA SATUAN UPA
PEKERJAAN :
:
LOKASI :
1 2
11 Kotak MCB Presto
12 MCB 6 A
K. BAHAN BAKAR DAN PELUMAS
1 Minyak Solar
2 Bensin Premium
L. BAHAN PLUMBING DAN SANITASI
1 Pipa PVC AW 1/2"
2 Pipa PVC AW 3/4"
3 Pipa PVC AW 2"
4 Pipa PVC AW 4"
5 Pipa PVC tipe D 3"
6 Pipa PVC Tipe D 4"
7 Pipa GIP 3/4"
8 Pipa GIP 1/2"
9 Pipa GIP 1"
10 Pipa GIP 2"
11 Pipa GIP 3"
9 Elbow 1/2 "
6 Socket 1/2 "
7 Tee 1/2 "
8 Elbow 3/4 "
9 Socket 3/4 "
10 Tee 3/4 "
11 Elbow 2"
12 Socket 2 "
13 Tee 2"
14 Reducer
15 Kran Air 1/2 "
16 Closet Jongkok
HARGA SATUAN UPAH DAN BAHAN 2017
HARGA
SATUAN SATUAN
( Rp. )
3 4
Bh 54,200.00
Bh 61,900.00
Ltr 7,650.00
Ltr 8,550.00
m' 6,200.00
m' 52,371.00
m' 89,415.00
m' 56,300.00
m' 27,600.00
m' 50,500.00
m' 24,193.20
m' 14,990.25
m' 19,828.95
m' 91,350.00
m' 66,412.50
Bh 4,500.00
Bh 2,400.00
Bh 10,100.00
Bh 3,100.00
Bh 2,400.00
Bh 10,100.00
Bh 26,000.00
Bh 33,000.00
Bh 43,300.00
Bh 35,000.00
Bh 37,600.00
Bh 148,100.00
DAFTAR HARGA SATUAN UPA
PEKERJAAN :
:
LOKASI :
1 2
17 Closet Duduk Biasa
18 Bak Air Fiber Glass
19 Tangki Air Fibre Glass 1 M3
20 Tangki Air Fibre Glass 1,5 M3
HARGA SATUAN UPAH DAN BAHAN 2017
HARGA
SATUAN SATUAN
( Rp. )
3 4
Bh 1,470,000.00
Bh 341,000.00
Bh 2,202,500.00
Bh 3,083,700.00
PANJANG LEBAR TINGGI AREA
PEKERJAAN TANAH
1 Pekerjaan galian Tanah Pondasi 1.00
2 Pekerjaan urugan tanah kembali 2.89
3 Pekerjaan Timbunan Tanah dipadatkan 6.42 5.66 0.40
4 Pekerjaan urugan pasir dibawah Lantai 6.42 5.66 0.15
5 Pekerjaan Urugan Pasir dibawah Pondasi 0.15
JUMLAH TOTAL VOL
216 217.00
216 218.89
182 2,645.35
182 992.01
216 216.15