QC~PLAN.

Project No. & Name: Bituminous Painting on Masonry / Conc


Name of Client/ Consultant:

SL ACTIVITY CONTROLLING NATURE & EXTENT ACCEPTANCE CRITERIA PERSON RESP.


No. DOCUMENT OF INSP./TEST AT LOCATION

1 Environmental Drawing Visual, 100% - No rain, fog or mist Engineer /


conditions Contract Specs. - Surface temp. between 5º C & 50º C Foremen/
Mfr's. data sheet - Dust free environment Quality Engineer

2 Surface preparation Drawing Visual, 100% - Free from loose particles Engineer /
Contract Specs. - Free from grease and dirt Foremen/
Mfr's. data sheet - Clean and dry Quality Engineer
- Holes filled with appropriate filler
- Shuttering nails to be removed
3 Application of Paint Drawing Visual, 100% - Paint system and application method Engineer /
Contract Specs. as per specification Foremen/
Mfr's. data sheet - For internal surface minimum 2 coat Quality Engineer
epoxy bituminous paint or as required
- For external surface minimum 2 coat
proprietary cut back bitumen or as required
4 Final inspection Drawing Visual, 100% - Even coat thickness Engineer /
Contract Specs. - Free from drips, runs, bubbles or Foremen/
any other defects Quality Engineer
- Finish in accordance with specification
ainting on Masonry / Concrete Surfaces
Doc. No. CIVIL QC~Plan- 010/ Rev. 0

RECORD

Daily Painting Log


CIVIL QC~Form- 022-01/ REV 0
Bituminous Painting on
Masonry / Concrete Surfaces
CIVIL QC~Form- 010-01/ REV 0
Daily Painting Log
CIVIL QC~Form- 022-01/ REV 0
Bituminous Painting on
Masonry / Concrete Surfaces
CIVIL QC~Form- 010-01/ REV 0
Daily Painting Log
CIVIL QC~Form- 022-01/ REV 0
Bituminous Painting on
Masonry / Concrete Surfaces
CIVIL QC~Form- 010-01/ REV 0

Daily Painting Log


CIVIL QC~Form- 022-01/ REV 0
Bituminous Painting on
Masonry / Concrete Surfaces
CIVIL QC~Form- 010-01/ REV 0