2 Surface preparation Drawing Visual, 100% - Free from loose particles Engineer /
Contract Specs. - Free from grease and dirt Foremen/
Mfr's. data sheet - Clean and dry Quality Engineer
- Holes filled with appropriate filler
- Shuttering nails to be removed
3 Application of Paint Drawing Visual, 100% - Paint system and application method Engineer /
Contract Specs. as per specification Foremen/
Mfr's. data sheet - For internal surface minimum 2 coat Quality Engineer
epoxy bituminous paint or as required
- For external surface minimum 2 coat
proprietary cut back bitumen or as required
4 Final inspection Drawing Visual, 100% - Even coat thickness Engineer /
Contract Specs. - Free from drips, runs, bubbles or Foremen/
any other defects Quality Engineer
- Finish in accordance with specification
ainting on Masonry / Concrete Surfaces
Doc. No. CIVIL QC~Plan- 010/ Rev. 0
RECORD