3.

CFE MAJOR FLOWLINES

3.1. Baja California Sur


Bidders: ICA Fluor, Samsung, Arendal, Techint, Carso Electric,
Sonora Pacific, TMM, Gasoducto Aguaprieta (Sempra-IENova), Avanzia Instalaciones,
Sea NG, Mitsui, Korea Gas, GBM, Neomexicana de NG, Dredging, Faster NG, Gas
Natural del Noroeste (Source Gas Inc), Enagas, Acciona, Cava Energy, Fermaca,
Renger Energy, Abengoa

Further: info@aramoni.com
_______________________________

Related notes, ads and coming tenders


Coming Tenders

- Jaltipan-Salina Cruz/ 36 inch/ 247km


- Lazaro Cardenas-Acapulco/ 331km

Latest Assignments

LOS RAMONES PROJECT


- Phase 1 Camargo-Ramones: Pemex-IENOVA
- Phase 2 Ramones-San Luis Potosi: Pemex-IENOVA
- Phase South San Luis Potosi-Guanajuato: ICA Fluor-GDF Suez-Enagas

TRANSCANADA:
- Tula-Villa de Reyes: 8-Apr-2016
- Tuxpan-Tula: 10-Nov-2015
- El Oro-Mazatlan
- El Encino-Topolobampo

IENOVA (Sempra):
- Empalme (branch): 2-May-2016
- San Isidro-Samalayuca: 14-Jul-2015
- Ojinaga-El Encino 24-Nov-2014
- Sasabe-Guaymas
- Guaymas-El Oro

TRANSCANADA-SEMPRA
- South Texas-Tuxpan (marine): 13-Jun-2016

FERMACA:
- Villa de Reyes-Aguascalientes-Guadalajara: 29-Mar-2016
- La Laguna-Aguascalientes 16-Mar-2016
- El Encino-La Laguna 16-Dec-2014

CARSO:
- Samalayuca-Sasabe: 11-Sep-2015
- Waha-San Elizario TX (Norte III) 28-Jan-2015
- Waha-Presidio TX (Ojinaga) 8-Jan-2015

SPECTRA ENERGY
- Nueces-Brownsville TX: 14-Jun-2016

SIMSA:
- Villa de Reyes (branch): 27-Jul-15

ATCO:
- Tula (branch) 9-Oct-2014

SOURCE GAS
- Hermosillo (branch): 21-Jul-2016

------------------------------------------
PRIVATE DEVELOPMENTS

HOWARD (us) - CLISA (mx)


Nueva Era Pipeline
Texas - Monterrey: 300km

Further: info@aramoni.com
_______________________________

PIPELINE ARCHIVES Next page


_______________________________

4. HVDC Transmission System

Highway: Oaxaca - Mexico City


Distance: 600 km
Towers' height: 50m
Capacity: 3000 Mw
Contract
Object: HVDC transmission service
Type: construction, operation, maintenance and transfer
Estimate: $1,700m
Tender Status: RFP PENDING

- Sonora-Baja California/ 700km/ RFPs: early 2017

Further: info@aramoni.com

_______________________________

1. PEMEX MAJOR TENDERS


_______________________________

1.1. Abkatun-A: Marine pipe line repair and section replacement


Project
Scope: IPC
Location: Campeche basin GOM
Tender
Status: IN PROGRESS
Ref: 18575106-501-16
Type: international under Mexico's trade agreements
Register: expression of interest
Bidders: Permaducto (Protexa), Swiber, Diavaz, Doxsteel, Micoperi
Schedule
Public bid notice 26-May-2016
Site visit n/a
1st Bidders' meeting 30-May-2016
2nd Bidders' meeting 2-Jun-2016
Proposal submission 16-Jun-2016
Ruling: 30-Jun-16
Winner Permaducto (Protexa): $30.7m
Micoperi $19.9m: technical proposal rejected
Diavaz $29.9m: technical proposal rejected
HOC Offshore $31.3m: technical proposal rejected
Swiber $64.2m: technical proposal rejected
Doxsteel: n/a

1.2. Abkatun-A2: Offshore Production Platform


Project
ID: PB-ABK-A2
Scope: IPC + Transportation + Installation
Term: 900 days
Location: Campeche basin GOM
Tender
Status: ASSIGNED
Ref: CPEP-SCCI-O-RE-301-16
Type: National by invitation
Bidders: Dragados, ICA-Fluor, McDermott, Cicsa
Schedule
Public bid notice 1-Apr-2016
Site visit n/a
1st Bidders' meeting 13-Apr-2016
2nd Bidders' meeting 20-Apr-2016
3rd Bidders' meeting 27-Apr-2016
Proposal submission 27-May-2016
-McDermott: $471m
-Cicsa: $488m
-Dragados: $514m
-ICA-Fluor: n/a
Ruling: 8-Jun-2016
J. Ray McDermott: $471.4m Winner

_______________________________
PIPELINE ARCHIVES

South Texas-Tuxpan (marine)


800km/ 42"/ 2600mcfpd
Bidders: Gasoducto de Aguaprieta (Sempra-IENova), Enbridge Offshore, Carso
Electric-Cicsa, Transportadora de Gas Natural de la Huasteca (Transcanada), Enagas,
Permaducto (Protexa), Mota-Engil, Arendal, Techint, CFC, CCC, Abengoa
Proposals submission: 19-May-2016
Technical ruling and offers disclosure: 2-Jun-2016
Infraestructura Marina del Golfo (Transcanada-Sempra): $2,111m
Ducto Mar Gas (CCC Fabricaciones y Construcciones): technical proposal rejected
Ruling: 13-Jun-2016
Infraestructura Marina del Golfo (Transcanada-Sempra): $2,111m
Ducto Mar Gas (CCC Fabricaciones y Construcciones): technical proposal rejected
Ruling: 13-Jun-2016
Winner Infraestructura Marina del Golfo (Transcanada-Sempra): $2,111m,
$0.2494/Gj

Nueces-Brownsville TX
250km/ 42"/ 2600mcfpd
Bidders: Enagas, Transcanada, Williams, Kinder Morgan, Sempra, Enbridge, Spectra,
Morgan Lewis, Dimension
Proposal submission: 18-Apr-2016
Bids disclosure: 2-May-2016
Ruling: 14-Jun-2016
Winner Spectra Energy: $2,910m

Hermosillo (branch)
48km/ 16"/ 100mcfpd/ $68m
Interested bidders: Gasoducto de Aguaprieta (Sempra-IENova), Gas Natural del
Noroeste (Source Gas Inc), Arendal, Techint, Fermaca, CCC, GPA Energy, Terrabrio,
Temura, Cointer
Last meeting: 25-May-2016
Proposals submission: 27-Jun-2016
Economic offer disclosure: 13-Jul-2016
1. Gasoducto de Aguaprieta (Sempra-IENova): $21.9m
2. Gas Natural del Noroeste (Source Gas Inc): $25.3m
3. GPA Energy: $46.7m
Ruling: 21-Jul-2016
Winner Gas Natural del Noroeste (Source Gas Inc)

Empalme (branch)
20km/ 24"/ 236mcfpd
Proposals submission: 28-Mar-2016
Technical ruling & economic offer disclosure: 18-Apr-2016
Ruling: 2-May-2016
Winner Gasoducto de Aguaprieta (Sempra-IENova): $12.0m, 0.0131 USD/Gj
Gas Natural del Noroeste (Source Gas Inc): $21.5m, 0.0199 USD/Gj
Arendal: $31.1m, 0.0367 USD/Gj
CCC-Caabsa: technical proposal rejected
GPA Energy: technical proposal rejected
Tula-Villa de Reyes
280km/ 36"/ 550mcfpd/ $420m/ Jun 2015
Bidders: Gas Natural del Noroeste (Source Gas Inc), Enagas, Gasoducto de Aguaprieta
(Sempra-IENova), Transportadora de Gas Natural de la Huasteca (Transcanada),
Arendal, Carso Electric, Fermaca
Proposal submission: 15-Jan-2016
Ruling: 8-Apr-2016
Winner Transportadora de Gas Natural de la Huasteca (Transcanada): $554m
Enagas Internacional: $669m
Gasoducto de Aguaprieta (Sempra-IENova): $561m (not compliant)

La Laguna-Aguascalientes
600km/ 42"/ 1150mcfpd
Bidders: Carso Electric, Transportadora de Gas Natural de la Huasteca (Transcanada),
Gasoducto de Aguaprieta (Sempra-IENova), Fermaca Pipeline La Laguna, Gas Natural
del Noroeste (Source Gas Inc), Arendal, Techint
Proposals submission: 18-Feb-2016
Technical ruling & economic offer disclosure: 7-Mar-2016
Ruling: 16-Mar-2016
Winner Fermaca Pipeline La Laguna: $472.6m, 0.0902 USD/Gj
Transportadora de Gas Natural del Noroeste (Transcanada):
$784.4m, 0.1189 USD/Gj
Gasoducto de Aguaprieta (Sempra-IENova): Proposal Rejected

Villa de Reyes-Aguascalientes-Guadalajara
355km/ 42"/ 1000mcfpd
Bidders: Carso Electric, Transportadora de Gas Natural de la Huasteca (Transcanada),
Gasoducto Aguaprieta (Sempra-IENova), Fermaca, Enagas, Gas Natural del Noroeste
(Source Gas Inc), Arendal, Techint
Proposals submission: 25-Feb-2016
Technical ruling & economic offer disclosure: 15-Mar-2016
Ruling: 29-Mar-2016
Winner Fermaca Pipeline de Occidente: $293.5m, 0.0877 USD/Gj
Energia Occidente de Mexico (Transcanada): $488.2m, 0.1044 USD/Gj
Enagas Internacional: $784.3m, 0.1232 USD/Gj
Gasoducto Aguaprieta (Sempra-IENova) $447.1m: Proposal Rejected

Samalayuca-Sasabe
Proposals submission: 21-Aug-2015
Techical ruling: 4-Sep-2015
Ruling: 11-Sep-2015
Winner Carso electric - Ideal: 0.2852 USD/Gj
2.Transportadora del Noroeste (Transcanada): 0.3553 USD/Gj
3.Gasoducto de Aguaprieta (Sempra-IENova): 0.3821 USD/Gj
4.Fisterra Energy Mexico IX - Operadora Mexicana de Gasoductos: 0.4181 USD/Gj
Copavisa - PMC ca Rejected

Tuxpan-Tula
Proposals submission: 16-Oct-2015
Technical ruling: 2-Nov-2015
Ruling: 10-Nov-2015
Winner Transportadora de Gas Natural de la Huasteca (Transcanada)
Carso Electric-Ideal
Sacyr-Invex-Apollo
Enagas-Elecnor
Gasoducto Aguaprieta (Sempra-IENova)

San Isidro-Samalayuca
Proposal submission: 23-Jun-2015
Technical ruling: 7-Jul-2015
Dynamica-Invex-CGM Rejected
Coconal-Semmaterials Rejected
Ruling: 14-Jul-2015
Winner Gasoducto de Aguaprieta (Sempra-IENova): 0.0099 USD/Gj
2.Fermaca: 0.0109 USD/Gj
3.Transportadora Zacatecas (Simsa): 0.0120 USD/Gj
4.Carso-Ideal: 0.0200 USD/Gj

Villa de Reyes (branch)


Los Ramones Line to Villa de Reyes Power Plant
10km/ 16"/ 200mmcfpd
Technical ruling: 20-Jul-2015
Ruling: 27-Jul-15
Winner Transportadora Zacatecas (Simsa)-Distribuidora de GN Mexico-Distribuidora
de GN del Noroeste-GN Industrial-GN del Noroeste: $16.71m/ 0.0077 USD/Gj
CCC-Sicilsaldo: $32.45m Rejected
GPA Energy: $35.34m Rejected
Dynamica-Invex Rejected
Cava Energy-Antar-Ortiz Rejected

Waha-San Elizario TX (Norte III): Gas 42in x 360km


Proposal submission 13-Jan-2015
Bid proposals: Sempra, TC Continental, Kinder Morgan Texas, Energy Transfer Partners
- Mastec - Carso Energy, Operadora Mexicana de Gasoductos
Ruling 28-Jan-2015
Winner: Energy Transfer Partners - Mastec - Carso Energy

Waha-Presidio TX (Ojinaga), NG 2831 MMCFPD, 42in x 230km


Proposal submission 9-Dec-2014
Bid proposals: Sempra, Crestwood Midstream Partners, TC Continental, Energy
Transfer Partners - Mastec - Carso Energy, Embridge-Spectra Energy Transmission,
Operadora Mexicana de Gasoductos
Ruling 8-Jan-2015
Winner: Energy Transfer Partners - Mastec - Carso Energy

El Encino-La Laguna, NG 1500 MMCFPD, 42in x 400km


Bid proposals (investment/ tariff / PV-1 / PV-2):
Fermaca: $630.1m / $0.1222 per Gj / $602.2m / $530.1m
Enagas-Elecnor: $997.3m / $0.1610 per Gj / $756.5m / $665.9m
Transcanada: $899.6m / $0.1546 per Gj / $781.2m / $687.7m
Carso: $914.3m / $0.2073 per Gj / $965.0 / $849.5m
Sempra-IENova: $883.3m / $0.1951 per Gj / $1003.6m / $883.5m
Abengoa-China Petroleum Pipeline Berau (disqualified at technical stage)
Ruling 16-Dec-2014
Winner: Fermaca Pipeline el Encino

Ojinaga-El Encino, NG 1356 MMCFPD, 42in x 250km:


Bid proposals (investment / tariff / PV-1 / PV-2):
1. Gasoducto de Aguaprieta (Sempra-IENova): $298.9m / $0.0560 per Gj / $192.2m /
$242.3m
2. Transportadora de Gas Natural del Noroeste (Transcanada): $344.6m / $0.0657 per
Gj / $221.8m / $279.4m
3. Carso Energy: $323.4m / $0.0721 per Gj / $239.1m / $301.2m
4. Enagas-Elecnor: $419.8m / $0.0725 per Gj / $248.4m / $313.0m
5. Fermaca: $311.9m / $0.0749 per Gj / $250.5m / 315.6m
Omega (disqualified at technical stage)
Ruling 24-Nov-2014
Winner: Gasoducto de Aguaprieta (Sempra-IENova)

Tula (branch), NG 485 MMCFPD, 30in


Proposal submission 17-Sep-2014
Bid proposals Arendal $59.5m, ATCO $48.8m
Ruling 9-Oct-2014: ATCO

Further detail: info@aramoni.com


______________________________

http://www.cfe.gob.mx/Licitaciones/Licitaciones/Paginas/Principal
esProyectos.aspx
EL PROYECTO BAJA CALIFORNIA III CONTEMPLA LA
CONSTRUCCIÓN Y OPERACIÓN DE UNA CENTRAL DE CICLO
COMBINADO A GAS NATURAL DE 300MW EN EL ESTADO
MEXICANO DE BAJA CALIFORNIA. LA INFRAESTRUCTURA DEL
PROYECTO CONTEMPLA UNA COMBINACIÓN DE
TURBOGENERADORES A GAS Y VAPOR, UN SISTEMA DE
RECUPERACIÓN POR CALOR, INFRAESTRUCTURA DE
TRANSMISIÓN Y DUCTOS DE SUMINISTRO DE GAS NATURAL. LA
CENTRAL INYECTARÁ SU GENERACIÓN A LA FUTURA
SUBESTACIÓN DE 230KV SE-LA JOVITA EN EL MUNICIPIO DE
ENSENADA. EN ENERO DEL 2014, EL GRUPO ENERGÉTICO
ESPAÑOL IBEDROLA SE ADJUDICÓ UN CONTRATO PARA
DESARROLLAR, CONSTRUIR Y OPERAR LA CENTRAL POR 25
AÑOS. LA INVERSIÓN PARA EL PROYECTO SE ESTABLECIÓ EN
US$270MN, MIENTRAS QUE LA CONSTRUCCIÓN DE LA CENTRAL
Y SUS INSTALACIONES ASOCIADAS COMENZARÁ EN ABRIL DEL
2014. LAS OPERACIONES COMERCIALES ARRANCARÍAN EN
AGOSTO DEL 2016.
17 de febrero de 2016

Los proyectos de infraestructura de mayor


inversión en México
HSBC Banca de Empresas

En el país existen varios proyectos de infraestructura que en los próximos años se espera que impulsen el
crecimiento de la economía y la generación de empleo. Conozca los más grandes según el monto de
inversión.

 COMPARTIR
 IMPRIMIR

El nuevo Aeropuerto Internacional de la Ciudad de México (NAICM) se posiciona como


el proyecto de mayor inversión al menos en lo que va del siglo XXI; aunque debido al
alza del dólar, sus dimensiones y en general su elevado costo, supone un reto enorme
para la actual administración.
Las dimensiones del proyecto son tales que se requerirán cerca de 15 veces la
inversión destinada a la presa La Yesca, la segunda mayor hidroeléctrica del mundo
tras la presa de las Dos Bocas, en China, y muy por encima de los recursos para los
gasoductos de Los Ramones, que se encuentran en proceso de construcción.

Para la construcción del Nuevo Aeropuerto de la Ciudad de México, en la primera


etapa, la Federación asignará 5,500 millones de pesos como parte de los recursos
hacia la Secretaría de Comunicaciones y Transportes, mientras que se asignarán 3,150
millones de pesos a la Secretaría de Medio Ambiente y Recursos Naturales para
atender los requisitos de implementación de la obra en dicha materia.

Este proyecto podría llegar a costar 208,000 millones de pesos, sin embargo, ante la
caída de los ingresos provenientes de las ventas del petróleo, este año no se
construirán 751 proyectos de infraestructura previstos, toda vez que el monto
destinado para este rubro disminuyó 20% en 2016, ante esto, el gobierno federal
puede llegar a buscar otras fórmulas de financiamiento para que la iniciativa privada
participe hasta con 70% del capital frente al 42% que se tenía previsto en el plan
original, según fuentes oficiales consultadas por la agencia internacional Reuters.
Entre los programas que sí se harán este año, 29 son de Petróleos Mexicanos
(Pemex), lo que representan 81% de los recursos destinados a los proyectos de
inversión, de acuerdo a un análisis realizado por el Centro de Estudios de las Finanzas
Públicas de la Cámara de Diputados.

Se trata de proyectos a cargo de Pemex Exploración y Producción. El más importante


es el mantenimiento del,“Ku- Maloob-Zaap”, ubicado en aguas someras de
Campeche, donde se producen 853 mil barriles diarios de crudo, lo que representa
37.5% de la producción nacional.

Con una inversión de 40,000 millones de pesos se harán obras para la operación y
mantenimiento de pozos productores, perforación de pozos de desarrollo y
construcción de infraestructura complementaria para el manejo de la producción de
nuevos campos en esa zona. De acuerdo con el Programa Nacional de Infraestructura
2014-2018, este proyecto tendrá una inversión de 247,945.5 millones de pesos entre
2013 y 2018.

Dos proyectos más en el Estado de México tienen asignada inversión para 2016, se
trata de la primera etapa del Tren Interurbano México-Toluca, que tendrá 7,112
millones de pesos. Este proyecto incluirá 6 estaciones, 2 son terminales (Zinacantepec
y Observatorio) y 4 intermedias (Terminal de Autobuses, Metepec, Lerma y Santa Fe) y
servirán para descongestionar las principales carreteras del país y mejorar el acceso a
la zona Poniente de la Ciudad de México.

También se aprobaron 2,500 millones de pesos para el proyecto de extensión de la


Línea A del metro Chalco-La Paz. La inversión total prevista es de 11,000 millones de
pesos y se llevará a cabo entre 2015 y 2017.

En puertos, la federación estima invertir 3,800 millones de pesos, en la que destaca la


ampliación natural del Puerto de Veracruz, en donde la propuesta de inversión para
2016 es de 1,154 millones de pesos.

Por otro lado, la ampliación del Sistema del Tren Eléctrico Urbano en la Zona
Metropolitana de Guadalajara con 4,880 millones de pesos, para descongestionar
algunas de las principales vialidades y reducir los tiempos de traslado en la ciudad.

Para el Túnel Emisor Oriente (TEO) se invertirán 3,913 millones de pesos en la


construcción de un túnel de 7 metros de diámetro para desalojar el agua residual y
pluvial de la zona metropolitana de la Ciudad de México. Como continuación de la
obra iniciada en 2008, que concluirá en 2018.
Mientras que la Comisión Federal de Electricidad (CFE) tendrá tres proyectos. El
primero, Rosario III (Unidades 8 y 9), en el municipio de Playas de Rosario, Estado de
Baja California, se invertirán 2,000 millones de pesos para la construcción de una
central de generación de energía eléctrica con capacidad neta máxima de 405
megawatts, utilizando gas natural como combustible principal y diésel como
combustible de respaldo.

El segundo, es la Ampliación de Redes de Distribución de 13 Divisiones con una


asignación de 2,101.7 millones de pesos, con una construcción de nuevas
instalaciones, así como en la ampliación de redes de distribución. Y el tercero, será
para el mantenimiento a unidades generadoras termoeléctricas de ciclo combinado y
turbogas de nueva tecnología con recursos por 3,204 millones de pesos.

Fuente: PWC, El Financiero, Secretaría de Hacienda.

Вам также может понравиться