Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
Structure Date Concrete Slump Cube Weight Density Failure Load (kN)
Compressive
and Location Cast Crush Class size of Cube Strength (N/mm2)
of Cube
(mm) (cm3) (kg) (g/cm3) 7/day 28/days 7/day 28/days
Remarks:
Contractor's Materials Engineer Checked By Materials Engineer