BRSM 

Systems:  QMS ISO 9001 (2015) & EMS ISO 14001 (2015) 

Assessment Report/Checklist 
Form 009 

 
CLIENT‐ORGANIZATION (NAME): Lavan Ertebat Co. 
 
PHYSICAL LOCATION(s): Unit 24, 5th Floor, Vali‐e‐Asr commercial 
complex, Valadi St.,  
Tehran, Iran , Iran 
Stage II Audit Date(s): 28 & 29 Aug 2016 
Stage I Audit Date(s): 17 Aug  2016 
NAICS (or NACE) CODE 33.20 & 62.02 

NAICS : North America Industry Classification System (if you operate within the EC you may use NACE)

ISO 9001 EXCLUSIONS: ‐‐‐ 

Assessment objectives: Third party assessment of  requirements of  QMS ISO 
9001:2015 and ISO 14001:2015, is met in companies 
management system, as well as legal requirements 
 
ASSESSMENT TEAM INFORMATION 
Assessment Team Leader, ATL khoshgoo 
Assessor 2 Yasaman Zehtab  
Assessor 3  
Assessor 4
Assessor 5
Assessor 6
 
 
Note: Adjusting the language within this form to the type of activity and nature of the organization is acceptable.
 

 
  Reference Clause  Observation 

We pursuit to assure that client‐organization adheres to the protection of communities and consumers. This is to 
1  follow the intent to the substitution of the word “identify” to the word “determine” as part of the importance to 
the processes being capable of achieving desired outputs (including consumer’s well‐being). 
Consulting, designing, supporting, implementation, installation, sales and after sale 
2  Scope of activities 
services of computer networks and communication data centers 
BRSM requires that the organization’s legal obligations and regulatory are met. 
Legal status  Technical supervisor is main responsible for executing and monitoring of these 
3  regulations   ok 
Obligatory applicable 
standard which  N/a 
organization has to follow 

4  Context of the organization 
The organization has determined External and Internal issues relevant to its purpose / 
Understanding the  strategic direction, affecting its ability to achieve the intended result(s) of its quality 
organization and its  management system. 
4.1 

ok
context  Organization has done PEST and SOWT analysis.as example of strength point knowledge 
QMS/EMS  staff.  
MD approved Documents.
The interested parties relevant to quality management system, to meet customer and 
applicable statutory and regulatory requirements have been determined (while in stage I it 
was not identified); The requirements of these interested parties relevant to the quality 
Understanding the  management system have been determined External Issues: and DoE. The Internal issues 
have been determined. The organization monitors and reviews information about these 
needs and 
interested parties and their relevant requirements. Above information was documented,  
4.2  expectations of 

ok
Mrs Khakbaz is responsible for keeping monitor and view information about interested 
interested parties  parties.based on SWOT nad PEST analysis the list of interested party was estrablished. 
QMS/EMS   
, sample of matters considered in the expectations; Increase of controls over factories by 
authorities has led to increase  of monitoring and control costs over environment aspects, 
and the production has to consider these over heads in calculations 
Determining the 
scope of the 
quality/ 
4.3  Refer to stage I audit and 4.1 and 4.2

ok
environment 
management 
system 
 The processes needed for QMS/EMS and their application throughout the organization has 
been defined effectively. The sequence and interaction of these processes has been 
Determined effectively with a risk based approach.  
Quality/environment  Risk of organization were evaluated (refer to 4.1 and 4.2)  
management  Following documents were checked in stage I audit 
4.4 
ok

system and its  The process map  
processes  improvements 
Organization chart  

5  Leadership

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: June 2016                                                      Page 2 of 12 
  Reference Clause  Observation 

5.1  Leadership and commitment   
The MD demonstrates leadership and commitment with respect to the quality/environment
management system by: taking accountability for the effectiveness of the quality 
  management system. 
5.1.1  quality policy and quality objectives are established for the quality management system and 
General 

ok
qms  are compatible with the context and strategic direction and result of SWOT and Pest 
  analysis;  
integration of the quality management system requirements into the organization’s 
business processes was considered for establishing management systems
5.1.2  management demonstrated leadership and commitment with respect to customer focus 
Customer focus 

ok
qms  and Documented information  
5.2  Policy
Quality/Environment Policy has been established in documented information, with ID: 
QP/00, Version: 0 Issued: Dec 2015 Approved by. Is appropriate to the purpose and context 
of the organization and supports its strategic direction; provides a framework for setting 
Establishing the 
quality objectives; includes a commitment to satisfy applicable requirements; includes a 
5.2.1  quality/environment 

ok
commitment to continual improvement of the quality management system. The policy is 
policy 
reviewed annually. 
 Policy: as the expansion of R & D unit, , increase market share and increase knowledge of 
personnel, decrease waste 
Policy has been established in documented information, with ID: QP, Version: 1 Issued: Dec
Communicating the  2015 Approved by. Quality policy was communicated to staff, as staff was asked they were 
5.2.2 

ok
quality policy  aware of the policy.QA Engineering and Contract Manager were asked. The policy is 
available to relevant interested parties. Such as: Contractor.  
The Management  approved related document s
Organization Chart was observed. 
Organizational roles, 
Job description was observed. 
5.3  responsibilities and 

ok
Job description of QA Manger, system Maintenance Expert was observed. 
authorities 
Mrs Khakbaz has appointed by MD as QA manager some of her responsibilities :  to ensure  
reporting on performance of the quality management system and fine  
6  Planning 
The organization has considered the issues affecting its strategies and directions 
and their requirements and has determined the risks and opportunities that need 
to be addressed.  
Sample of risks  and based on SWOT analysis: 
External  
Threat : new  technologies introduce in market it may cause competitors  
Actions to address  progressing advancing . 
6.1  Opportunities: loan with low interest for IT industries provided by private Bank. 
ok

risks and 
opportunities  The organization has integrated and implemented the actions into its quality 
management system processes. The organization has evaluated the effectiveness of 
the actions. Actions taken to address risks and opportunities are proportionate to 
the potential impact on the conformity of products and services. Above information 
was documented, Type of document: Procedure: risk assessment, Approved by: 
MD, Date issued: Dec 2015 Changes needed to the quality management system has 
been implemented 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: June 2016                                                      Page 3 of 12 
  Reference Clause  Observation 

The scope of environmental management system is environment effects resulted 
6.1.1 
producing paper filters, as Production process effectiveness and efficiency ,to 

ok
General 
ems 
manage these aspects the system has considered risks associated and controls  
Risks have been addressed in W02 work instruction, including risk, RPN , control if 
6.1.2  Environmental  needed and result after control, sample of risks considered: iron waste(scarp of 

ok
ems  aspects  metal sheet)  RPN  60  
After Reduction RPN 40 which is acceptable 
In Iran there is no obligation for this kind of storage and service providers. 
There for the organization make list of pollutant : 
6.1.3  Compliance  The have power usage, 

ok
ems  obligations  Energy usage for Heating and Cooling 
Paper usage 
scarp of metal sheet 
iron waste(scarp of metal sheet)  RPN  60  
6.1.4  After Reduction RPN 40 which is acceptable 

ok
Planning action 
ems  For reducing energy usage the use CLF lam and sensors. 
The windows has two shells. But at the end of Storage there was broken Window.
Quality Objectives have been documented, Issued: March 2015 Approved by, MD. 
Quality /  Objectives cover all QMS requirements, as  
environment  . The objectives include product conformity/customer satisfaction. The objectives 
6.2 
are being monitored.  

ok
objectives and 
6.2.1 
planning to achieve  Sample objectives: 3 % of reduction of Power energy, 
them  Increasing customer satisfaction 5% 
Reduction delivery time 10%  
  
Base on context of organization,the may have change in technology ,there for 
Planning of changes 
Change to MS is carried out in planned manner. Changes are planned to be 
6.3  Achieve  reviewed periodically every year. Planning of changes cover all MS requirements, as 

ok
environmental  follows: the purpose of the changes and their potential consequences; the integrity 
objectives 
of the quality management system; the availability of resources; the allocation or 
reallocation of responsibilities and authorities. To cover the standard 
7  Support  
7.1  Resources   
To determine and provide the resources needed for the establishment, 
implementation, maintenance and continual improvement of the quality 
7.1.1 
General  management system. The capabilities of, and constraints on, existing internal 
ok

qms 
resources has been considered. Needs to be obtained from external providers have 
been considered. 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: June 2016                                                      Page 4 of 12 
  Reference Clause  Observation 

Base on SWOT analysis and threat , the organization needs knowledge worker  
The organization has determined and provided the persons) necessary for the 
7.1.2 
People  effective implementation of its quality management system and for the operation 

ok
qms 
and control of its processes. 
Job Qualification of personnel were observed.  
The have storage infrastructure was checked. 
7.1.3  Instruction of instruction was observed. 
Infrastructure

nc
qms  Lift trucks have performance check (examination). 
In office software were keep updated. 
The organization has determined, provided and maintained the environment 
Environment for the  socially/psychologically and physically necessary for the operation of its processes 
7.1.4 
operation of  and to achieve conformity of products and services. Observation: Light and noise 

nc
qms 
processes  are in normal condition.  
 
7.1.5  Monitoring and measuring resources   
Equipment is suitable for the specific type of monitoring and measurement 
7.1.
Equipment is maintained to ensure their continuing fitness for their purpose. The 
5.1  General 

ok
organization has established documented information as evidence of fitness for 
qms 
purpose of the monitoring and measurement resources, Procedure name:  
List of calibrate equipment (MF.003.001) were checked. As sample the calibration 
7.1. of the ohmmeter, Calibration by Laksar company in Jan 2016. 
Measurement 
5.2   

Ok
traceability 
qms 

The organization has determined the knowledge necessary for the operation of its 
processes and to achieve conformity of products and services. 
Every six month the personnel have gathering about technical and market and the 
communicate about new technologies or markets, after that from the minute of the 
7.1.6  Organizational  meeting   , the extract useful points and try to use it as explicit knowledge. 

ok
qms  knowledge  The minute of the last meeting in March 2016 was observed. 
Also as training plan, after any staff attend in seminar or conference out of the 
organization he/she must give documented repots about main keys and 
achievements of external training. 
 
They have developed training procedure and there are training profiles for each 
staff. 
For Mrs.khakbaz. (Operation staff) profile was checked. Training plan with 
determining 5 training courses, (including, ISO 9001:2016 requirements) were 
7.2  Competence 
ok

observed. The records of this course in 5‐Dec‐15 were observed including training 
effectiveness evaluation for Mrs. khakbaz with score of 95%. 
for Mr.samiei (IT staff)training effectiveness evaluation for CISCO courses in Jan 
2016 Was observed. 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: June 2016                                                      Page 5 of 12 
  Reference Clause  Observation 

Quality policy was communicated to staff, as staff was asked they were aware of 
the policy. Staff asked. Staff is aware of their contribution to the effectiveness of 
7.3  Awareness 

ok
the quality management system and the implications of not conforming to the 
quality management system requirements are not feed backed to staff.  
The organization has determined the internal and external communications 
7.4  Communication  relevant to the quality management system. The communication includes following 

ok
criteria: communications are mostly; verbally, Face to Face, Out look  
And external communications are by email and letter.  The communication is 
7.4.1  Internal  effective and efficient according to the complications and size of organization. the 

ok
ems  communication  order of Customer in April 2016 through email was observed. 

7.4.2  External 

ok
ems  communication 

7.5  Documented information   
Documented information required by current International Standard(s); has been 
determined: Such as: Documented information by the organization as being 
7.5.1  General 

ok
necessary for the effectiveness of the quality management system has been 
determined: Such as: educational programs ,QC plans  

Creating and  Documented Information such as QC repots forms, customer  orders, Customer 
7.5.2 

ok
updating  satisfaction has date, author ,reference  number ,format are PDF and scanned  

7.5.3  Control of documented information 
Staff based on their responsibilities have access to date and information in networks, 
7.5.3.1 
For dales staff the accessibility in networks was checked. Also storage instruction is installed in walls of storage. 
The organization try to use paper less system and according the backup plan and priority of information they 
have every 2 month and every week back up from documented procedure. 
They have master list  which contains the methods distribution, access, preservation … 
Method of defining distribution: green and red stamp. Method of retrieving of records: backup of raw electronic 
7.5.3.2  file. Method of disposing of records: when a new record is in place the old one is collected and disposed.  
As evidence records of Customer NO 0123 PDf, approved by sale manager and customer Singh was observed..  
Sample of external documents:  regulations of DOE 
8  Operation 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: June 2016                                                      Page 6 of 12 
  Reference Clause  Observation 

The organization has planned, implemented and controlled the processes needed 
to meet the requirements for the provision of services, and to implement the 
actions determined in by: Determining the requirements for the products and 
services, Establishing criteria for the processes, and the acceptance of products and 
services, Determining the resources needed to achieve conformity to the product 
Operational  and service requirements, Controlling of the processes in accordance with the 

AR
8.1  planning and  criteria, Determining, maintaining and retaining documented information to the 
control  extent necessary, criteria established for  the processes, and the acceptance of 
products and services, The output of this planning is suitable for the organization’s 
operations. 
Sample: The project of Consulting and Installation of Mehr Ayin Company where 
checked. 
Segregation of waste has not been done appropriately 
Emergency  A drill for Firing has been run in the company, in Feb 2016, the emergency teams 
8.2 
preparedness and  have been formed ahead of circumstances, and everybody knows his/her duty in 

ok
ems 
response  case of accident, all Fire extinguishers Capsule is charged timely.  
8.2 
Requirements for products and services 
qms 
Requirements met in communication with customers are as follows 
Sample : 
They have website, emails  
For Mehy Ayin project the customer requirements where checked. They had sent 
8.2.1  Customer 
proposal to customer that contains project durations, information about changes in  Ok
qms  communication 
requirements and etc… 
In case of repair the keep customer property in defined area in storage, and put 
label which demonstrate statues of project. 
 
Determining the  The organization has determined service requirements, Such as:  
8.2.2  requirements for  Record for product requirements observed, For Mehy Ayin project the customer  
ok
qms  products and 
services 
The organization reviews service requirements, Such as: requirements specified by 
the customer, requirements for delivery and post‐delivery activities, Requirements 
not stated by the customer but necessary for specified or intended use,  applicable 
regulatory requirements related to the product, requirements specified by the 
Review of the 
organization, The company reviews the product requirements through formal 
8.2.3  requirements for 
documented communications with customer . Sample: Mehr Ayin projects  ok 
qms  products and 
Proposal No 0153 Contract no. MAC‐01543, dated Feb 2016, for customer:  
services 
They customer needed the LAN network for 18 Computers and  base on wife 
system , 
The organization reviewed customer order then issued proposal for customer. 
 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: June 2016                                                      Page 7 of 12 
  Reference Clause  Observation 

, where Service requirements were changed, the organization may change the plan 
Changes to 
in consultation with customer , 
8.2.4  requirements for 
For example for Mehr Ayin projects at firs Customer want wiring then after  ok 
qms  products and 
reviewing project they decided to use Wife systems, all records related to changes 
services 
were observed. 
8.3 
Design and development of products and services   
qms 
8.3.1 
General  e
qms  Each project base on the customer order they make proposal and they 
Design and  established Map, 
8.3.2  Base on Map other requirements and subsequence  
development  e
qms 
planning 
Sample of  projects: Mehr Ayin 
Peroposal No : 0153 
MAP No : M‐MAC‐0153  (approved by Technical manager of Lavan on 26 Feb 
Design and  2016 and approved by customer 1 March 2016) 
8.3.3 
development  2 staff was considered to run the projects.  e
qms 
inputs  They software (windows server 2012) and hardware (rack, modem, hub/switch,) 
were determined. 
The method of validation and verification was determined. 
 
In Mehr Ayin projects: 
As example of verification: controlling maps and inputting requirements with 
Design and 
8.3.4  implementing systems. 
development  e
qms  As example of  validations : After implantation,  
controls 
Through access point they check internet connection in network and sharing 
Center section(records of 11 March 2016) 
Design and  Refer to 8.3.4 
8.3.5 
development  Records of all checking criteria were observed.  e
qms 
outputs   
In accordance the scope of activity for each projects the have to design new plan 
Design and 
8.3.6  and maps based on customer requirements, if the changes are needed approval 
development  e
qms  of customer is necessary. 
changes 
 
8.4 
Control of externally provided processes, products and services 
qms 
Suppliers evaluation and selection, Approved by: Hussein Highlight The organization 
8.4.1  evaluates and selects suppliers based on their ability to supply product in 
General  ok
qms  accordance with the organization’s requirements, the Criteria for selection, 
evaluation and re‐evaluation has been established . ,  

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: June 2016                                                      Page 8 of 12 
  Reference Clause  Observation 

The organization evaluates suppliers periodically, every 12 months. The evaluation 
of suppliers includes 'ability and performance of supplier', 'effect of the purchased 
product on the quality of the product' and is proportionate to the risk associated. 
Sample of criteria: distance ‐ price ‐ equipment ‐ a ‐ b ‐ c. . .  sample of criteria: 
distance 
8.4.2  Type and extent of  Records of supplier evaluation of, switch /Hub date (Dec 2015) rack Cable provider 
ok 
qms  control  (date of last evaluation Jan 2016), virtual Box, hyper V (Dec 2015).  Windows server 
(Jan 2016) where observed. 
 
 
  
 
All requirements met in Information for external providers as follows: products and 
services; acceptance: sample of the acceptance data observed. Methods, processes 
and equipment for approval100 % control. The method of release of services; after 
8.4.3  Information for 
approval by TE manager. Competence, including any required qualification of  ok 
qms  external providers 
persons; qc people have trainings in controlling the Services. The external providers’ 
interactions with the organization; the MR of the supplier in touch with 
organization.  
8.5 
 Production and service provision   
qms 
All requirements met in Control of production and service provision as follows: the 
Control of 
8.5.1  characteristics of the, the services to be provided, or the activities to be performed; 
production and  ok 
qms  the results to be achieved; the availability and use of suitable monitoring and 
service provision 
measuring resources;  
Organization controls and records the unique identification of the product. Sample 
8.5.2  Identification and  product taken: Mehr Ayin project the traceability was checked. 
ok
qms  traceability  As sample: the technical expert of project was Mr Godarzi and  Mr kharazam, 
The external provider of sofwares ,Tamin Tec novin Company  
Property belonging  In Case of repair the keep customer property in defined area in storage, and put 
8.5.3 
to customers or  label which demonstrate statues of project.   ok
qms 
external providers   
The organization have one Storage: Preservation method includes: Identification, 
Handling, Packaging, Storage and protection. Sample product: The storage of racks, 
8.5.4 
Preservation  Wires, cables, was checked. the Cable Quantity was not accordance the storage  AR
qms 
transaction sheet  
 Operator was aware of environment aspects related to his department. 
As sample repair of Switch related of Fazel Company were checked. the records 
8.5.5  Post‐delivery 
of repair, list of changes of equipment, the responsible of repair  were checked.  e
qms  activities 
Records Have Code which  through that traceability is possible 
The organization reviews and controls changes for service provision, to ensure 
8.5.6 
Control of changes  continuing conformity with requirements. Results of the review of changes have  ok
qms 
been recorded in: management review.  

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: June 2016                                                      Page 9 of 12 
  Reference Clause  Observation 

Records of conformity with the acceptance criteria observed inform F502, for 
Release of  service: filter press paper, Date finished: 34‐ May 16the person(s) authorizing the 
8.6 
products and  release is traceable to each time release.Mr. Bashiri is authorized to release. There  ok 
qms 
services  has been no circumstance till now that the product has been released before all 
arrangements being satisfactory fulfilled. 
 Controls and related responsibilities and authorities for dealing with 
nonconforming product have been defined. Mr. fatteh is authorized to deal with 
non‐conforming arise in project. The organization deals with non‐ conformities in 
following ways: .Sample non‐conforming services/records observed: some racks 
Control of 
8.7  were damages. Correction action was considered in Nov 2015.the shelf for keeping 
nonconforming  ok
qms  rack had been changed. 
outputs 
Other sample: 
In  Mashahd Saze project  there was delay for finishing the project .the rout causes 
was :the order points of cable was not define properly, during the project they 
faced shortage of cable. They have reviewed all order point. 
9  Performance evaluation   
9.1  Monitoring, measurement, analysis and evaluation   
All requirements met in Monitoring, measurement, analysis and evaluation ,as 
follows: Items needed to be measured, such as; processes, quality controls, 
objectives, the methods used for monitoring, measurement, analysis and evaluation 
9.1.1  General  to ensure valid results; such as; statistical methods, data gathering, when the  ok 
monitoring and measuring is performed; every 6 months, when the results from 
monitoring and measurement is analyzed and evaluated; before internal audits 
Above information was documented, Type of document : Form : Process measuring. 
Records of satisfaction customer evaluation were observed such as: 
9.1.2  Customer  Customer – mehr Ayin  –‐ Score 86% 
ok
qms  satisfaction  Customer – mr zare  ‐ ‐ Score 79% 
Customer – Mashad  sazeh–‐ score 92%.  

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: June 2016                                                      Page 10 of 12 
  Reference Clause  Observation 

According to the data analysis procedure monitoring processes were observed. 
Organization collect, identify and analyze appropriate data to demonstrate 
efficiency. 
if score of customer satisfaction below than 75 or every item be zero corrective 
action must be done. Score of customer satisfaction for was more than 75.  
Supplier evaluation process after supplier evaluation for the first time, 2 suppliers 
removed from the list. Because of the score was under acceptable define criteria. 
9.1.3  Acceptable Deviation  of  defined finishing date  is 3%,the result is 1.9% 
Analysis and 
Qms   
evaluation of 
9.1.2   
ems  compliance 
All requirements met in design and development inputs as follows: conformity of 
products and services; the degree of customer satisfaction; the performance and 
effectiveness of the quality management system; if planning has been implemented 
effectively; the effectiveness of actions taken to address risks and opportunities; 
the performance of external providers; the need for improvements to the quality 
management system. 
the environmental noise is less than 90 db in west/east/south/north of the 

ok
warehouse 
Internal audit planning for this year observed. Interval for internal audit are once a 
9.2/ Internal audit 
year. The first internal audit has held on 94.10.02. (Oct 2015) checklist of internal 

ok
9.2.1  General 
audit is in form FRM02. Evidences have recorded completely. One nonconformity 
observed and recorded. It was about records of customer satisfaction which 
Internal audit  correction action and effeteness were checked. 
9.2.2 
programme 

ok
9.3  Management review 
The intervals of management review meeting have been determined in; every 12 
9.3.1  General  ok
Months The latest management review was conducted in: 29‐ Jan ‐16.  
Management  Management review are planned every annually. This commission is held on 29 Jan 
9.3.2  ok
review inputs  2016. All inputs observed in record.  
Some  of Outputs are : 
Updating Analyzing data procedure by end of the year and using last version of 
Management  software. 
9.3.3  ok
review outputs  Painting storage. 
 
10  Improvement 
in general the organization identifies and implements any changes necessary to 
10.1  General  ensure and maintain the continued suitability, adequacy and effectiveness of the  ok
quality management system  
In  Mashahd Saze project  there was delay for finishing the project .the rout causes 
Nonconformity and 
10.2  was :the order points of cable was not define properly, during the project they  ok
corrective action 
faced shortage of cable. They have reviewed all order point. 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: June 2016                                                      Page 11 of 12 
  Reference Clause  Observation 

The organization continually improves the suitability, adequacy and effectiveness of 
Continual  the quality management system In accordance With minute of Management review 
10.3  ok 
improvement  ,the organization has plan to expand R & D unit. 
Also the feasibility study in order to increasing variety of services has started. 
 

By exception we indicate the specific Strengths and weakness of the organization in light of the management system of the management system, as we
perceive and seen through processes in reference to requirements of the criteria being ascribed as these apply and relate to the assessment plan and
planning of the assessment. This aspect relates to AVA™ as it does to the protection of consumers in the client-organization’s role within their respective
supply – chain.
Disclaimers: (1) herein, we reiterate that any suggestion or opinion that the assessment team expresses does not construe to be a contractual
requirement. (2) The degree of certainty in conclusions increases by the competence of the assessment team as well as the attestation within the
assessment protocol, values, mission and vision under which we operate for the protection of consumers, still remains a certain level of uncertainty.
Strength Weakness

Human resources – management commitment Management system Knowledge of staff  
 

action Request Type I Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:

action Request Type II Form-008 – as we indicate and that each of the AR addresses the basic four (4) questions
as seen in Form-008:

The Cable Quantity was not accordance the storage transaction sheet. 

Segregation of waste has not been done appropriately  

Observation Form-018 – with uniquely specific identification:

ATL: Khoshgoo DATE: 29 Aug 2016

END of REPORT

FORM-009 – MS Reporting,
FORM-014 – Opening Meeting Checklist
FORM-008 – RA / AR, as requires
FORM-017 – Closing Meeting Checklist
FORM-018 – OBS, as requires
FORM-005 – Participants of opening & closing meetings
FORM-010 – As requires, recommendation for CoR
FORM-004 – Assessment Plan
FORM-026 – Assessment documents check-sheet,
FORM-007 – Planning onto -004, as process determined
for guidance purpose
 