Вы находитесь на странице: 1из 9

BRSM 

Systems:QMS ISO 9001 (2008) 

AssessmentReport/Checklist 
Form 009 

 
CLIENT‐ORGANIZATION (NAME):    Ifa Pazhouhesh Pars  (IFAP) 

PHYSICAL LOCATION(s):   No.24, Sixth St , Asad‐Abadí Ave. Tehran,Iran. 

Stage  II Audit Date(s):    07 April 2016 

Stage I Audit Date(s):    17 April  2016 

NAICS (or NACE) CODE 46.69 

ISO 9001 EXCLUSIONS:    7-3,7-6, 7-5-2, 7-5-4, 7.6 

 
Assessment objectives: Attesting that the requirements of ISO 9001 
have been met in client’s system to protect 
consumers and meet legal requirements 
 
ASSESSMENT TEAM INFORMATION 
Assessment Team Leader, ATL Bijan Rajabi 
 
 
 
 
 
 
 
 
 
Note: Adjusting the language within this form to the type of activity and nature of the organization is acceptable.
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

We pursuit to assure that client‐organization adheres to the protection of communities and consumers. This is to 
1  follow the intent to the substitution of the word “identify” to the word “determine” as part of the importance to 
the processes being capable of achieving desired outputs (including consumer’s well‐being). 
Procurement of Electrical and/or Rotating Equipment 
2  Scope of activities  (in main cases rotating equipments are electrical and in some cases their sources are 
gasoline or manpower) 
BRSM requires that the organization’s legal obligations and regulatory 
3  Legal status  √ 
are met as part of granting certification.  
4  Quality Management System 
General 
Requirements – 
Theorganization has implemented quality management systems5 
4.1  What is the  √
month, all required procedures have been designed 
implementation / 
transition date? 
Based on the audit in stage I, organization has developed procedure for 
Documentation  controlling the documents and records.documents and records of the 
4.2  Requirements  QMS system are under control by Document and records Procedure for  √ 
(includes records)  all documents a version has been defined and for forms procedure and 
work instructions a coding system has been defined. 

Organization has developed the quality manual; the clause 7.3, 7.5.2, 
4.2.2  Quality Manual 7.5.4, 7.6 has been excluded. Quality manual has been approved by  √ 
Restaurant manager  

Control documents and control record Procedure is established. The 
method of developing, approving and obsoleting the documents has 
Control of 
4.2.3  been defined. The method code assignment to documents and records  √ 
Documents 
has been identified. Master list (F1) including determining documents 
distribution was observed. F2 Record retention has been determined in 
this procedure .they back up on hard disk base on defined instruction. 
Such as tender retention is 10 years after end of contract (in case 
tender is successful) and 5 years after tender (in case of un‐successful 
tender) 
Control of 
Tender documents shall keep on administration department. 
4.2.4  Records – Are  √ 
Accounting back up plan is: 
records… 
Daily on same PC 
Weekly on server 
Monthly on hard disk 
 
 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 2 of 9 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

 Management has committed to provide all needed resources  
Organization Chart objectives policy. 
Management  The policy includes expanding Market  
5  √ 
Commitment  Increase of satisfaction through versatility of service 
Manager is also committed to provide resources , human resources and 
training , 

Customer  Focus  – 
5.2  (may  relate  to  In clauses 7.2.1 and 8.2.1 customer Focused is explained in detail.  √
7.2.1 and 8.2.1) 

Quality Policies with the contexts such as  the commitment to quality is 
constant concern,  Increase of satisfaction through versatility of service 
5.3  Quality Policy √
Manager is also committed to provide resources , human resources and 
training and infrastructure 
Quality objectives are determined and monitored in internal audit and 
Planning ;5.4.1 management review meetings; objectives for current year has been 
Quality determined such as: 
Objectives/5.4.2 Increasing quantity of successful tenders (10 percent) before end of 
5.4  √
quality 1395 (one year). 
management Increasing of profit (10 percent)  before end of 1395 (one year). 
system planning
 

5.5 

Job description (F15)and organization Chart is define properly. CEO has 
approved Organizational Chart and responsibility and authority 
Responsibility,  documents. 
5.5.1  √
Authority   The job description of the R&D Manager and M.R observed. The 
Responsibilities are in Consistence with Job description and Authorities. 
 

Management  CEO has appointed Mr Amir Karimi Sahari as Management 
5.5.2  √
Representative  Representative by official letter on Dec 2015 

Internal Internal communication is Done through telephones. MS outlook  
5.5.3  √
Communication Verbal communication and face to face contacts 

5.6  Management review

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 3 of 9 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Management reviews  done every 6 month, 
5.6.1  General  The last management review meeting was conducted March, 2016.all  √
inputs are covered. Minute of the meeting was observed.   

All Inputs have been discussed. At the meeting such as results of audits; 
customer feedback; process performance and product conformance 
status of corrective and preventive actions; 
5.6.2  Review Inputs  √
follow‐up action from earlier management reviews; 
changes that could affect the QMS,  
recommendations for improvement 

Some outputs are as follows 
5.6.3  Review Output Implanting SWOT Analysis for 1396 (next solar year) objectives.  √
Adapting ISO 9001:2015 Version,  

6  Resource Management

6.1  Refer to 6.2 ,6.3, 7.4 ,8.2.1


6.2  Human Resources 

They have determined job description for all job positions defined in 
6.2.1  General  organization chart. For each job position, they have determined 
required qualifications, authorities and infrastructures. 

Training procedure:
.the training plan F11 was observed. 
Competence,  They service training Plan for new personnel. 

P-11
6.2.2  Awareness  and   In second six half of 1394(Sep2015 to March2016) , (requirements ISO  AR
Training  9001),( commercial rights )conducted  
For requirements Of QMS the score of M.R was 95%. 
Training effectiveness evaluation process has not done 

Infrastructure is decent and Meet the needs of the organization. 
6.3  Infrastructure  √   
IT department ensure quality of PC’s and internet. 

Work 
6.4  Work environment is tidy and clean. Effective for the scope.   √   
Environment  

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 4 of 9 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

7  Product Realization 
Planning and project control procedures were checked. After winning 
the tender and the signing of the contract. Project Manager prepares 
Planning of  need information in coordination with the project planner and client to 
7.1  Product  provide basic issues related to entering the phase1 of project.  √   
Realization  Records of supply of  Rotor complete assembly P/N SA05223059‐ 
‐TERMINAL BOX.MAIN‐ CFR SHARGE TO ASSALUYER for  National Iranian 
Gas Company were observed 

They  customer  the  considered  this  items  in  their  Contract  and 
Determination of  attachments.  Such  as  delivery  time.  Delivery  place,  Technical 
Requirements  requirements. 
7.2.1  √   
Related to the  Contract  and  technical  requirements  for  Rotor  complete  assembly  P/N 
Product   SA05223059 on Oct 2015 were observed. 
 

7.2  Customer‐Related Processes 
Review of  Feasibility Study of the project is done Supply and tender procedure: P-
Requirements  13.for Rotor complete assembly P/N SA05223059 for National Iranian
7.2.2  √   
Related to the  Gas Company were observed.
Product  

Communication with customers is done base on telephone and email. 
Records  and letter of communication with  National Iranian Gas 
Customer 
7.2.3  Company on Nov and Dec 2015   √  
Communication 
were observed  

7.3  Design and Development  excluded 

Design and 
7.3.1  Development  ‐‐  N/A   
Planning 

7.3.2  D & D Inputs  ‐‐‐  N/A   

7.3.3  D & D Outputs  ‐‐‐  N/A   

D & D 
7.3.4  ‐‐‐  N/A   
Reviewing 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 5 of 9 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

7.3.5  Verification  ‐‐‐  N/A   

Control of (D & D) 
7.3.6  ‐‐‐  N/A   
Changes 
Control of (D & D) 
7.3.7  ‐‐‐  N/A   
Changes 
7.4  Purchasing 
Purchasing  The approved supplier list and suppliers were checked.  
7.4.1    √  
Process 
Purchasing  Supplier evaluation form (F10), has been designed base on factors such: 
7.4.2  market prices , quality,   √  
Information  
Suppler evaluation for  
Shenzhen Telemax Technology Co. Limited and Keifo Machinery & 
Electronics Co. were checked. 
 
Purchasing procedure is established. 
Record of purchase No 18 Forms (F12) For Rotor complete assembly 
P/N SA05223059 on Nov 2015 was observed. Performa and Technical 
Verification of  Specifications Manual which was received from supplier were observed.
7.4.3  Delivery time 50 days  √
Purchases 
Place of delivery:  Assaluyeh  Port 
Date 22/Dec/2016 
Equipment Delivered timely. Control is done according to DATA SHEET 
ITEMS specifications. Mr. Mousavi. Singed the inspection forms. 
 
 

7.5  Production and Service Provision 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 6 of 9 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Purchasing in done accordance with the planned schedule client 
project's implementation schedule. 
Purchased must done in time. 
Control of  No delays have been reported on the purchase. 
7.5.1  Production and    √  
Service Provision  Clearance instructions are developed .after clearance Company control 
equipment in client site base on technical manual and date sheets. 
Record of purchase No 18 Forms 
Place of delivery:  Assaluyeh  Port 
Date 22/Dec/2016 
Equipment Delivered timely. Control is done according to  DATA SHEET 
ITEMS specifications. Mr. Mousavi. Singed the inspection forms. 
 
Validation of 
Processes for 
7.5.2 

 
Production and 
Service Provision 
Identification  and  Each Client and Order  has unique Code ,The Code of Iranian National 
7.5.3  √  
Traceability  Gas Company Traceability code is IGI025‐18
Customer 
7.5.4  exclude  √  
Property 
They product from port to clients site so the there is  no storage, just for  
Preservation of 
7.5.5  Office items there is small storage, which s list of items and quantity of  √  
Product 
the is prepared 
Control of 
Monitoring and 
7.6  Exclude.  √  
Measuring 
Devices 
8  Measurement, Analysis and Improvement 
8.1  General       
8.2  Monitoring and Measuring 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 7 of 9 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

The organization has established Customer satisfaction forms ,after 
each project they asked the customer to fill out this forms ,they collect 
and analysis this Questioners. There was total 5 forms, average 86, 
objective is 80. 
Customer  Least item is control project (75%) corrective action E12, corrective 
8.2.1  √  
satisfaction  action is training course for all personnel in contact with customers with 
subject “customer focus” which has held on 12 and 19 February for all 
personnel, effectiveness will measured on end of april. 
the Forms of Iran national gas on Feb 2016 and South Pars Gas Complex 
on Jan 2016 where observed. 
Last Internal Audit on Feb 2016 impartial personnel 
Two non‐conformity were discovered in internal Audit.   
1‐ evaluation of supplier was not complete 
8.2.2  Internal Audits  √  
2‐ Data analysis was none base on the procedure.  
Appropriate corrective action, correction and rout cause were 
considered.  
Monitoring  and  The process measurements are under control by process indices where 
8.2.3  Measurement  the results of process measures are shown in data analysis table and if  √  
Process  the criteria is not met , corrective action is considered 
Monitoring  and 
Refer to 7.2.1 and 7.2.2 
8.2.4  Measurement  of  √  
 
Product 
Control of Non‐
8.3  Conforming  No‐ non‐conforming was detected during past year.  √  
Product 
According to the Data Analysis & Process Monitoring Procedure they 
have developed a from for processes criteriathe record of data analysis 
and process monitoring was observed for examplecustomer satisfaction 
8.4  Analysis of Data  √

 
average of 90% and criteria of 80%, supplier evaluation average of 
82.5% and criteria of 85%, delay in delivery 0and criteria of 15 days in 
0% 

8.5  Improvement 

Continual  They  considered  feed  backs  and  done  marketing  research    and  R&D  to 
8.5.1  √   
Improvement  improve the service  
Corrective actions are taken to eliminate causes of nonconformities 
8.5.2  Corrective Action  √   
effective in preventing recurrences and nonconformities effective in 
preventing recurrences. 
The corrective action of internal audit observed. 
8.5.3  Preventive Action  The root Course analysis is complete and the effectiveness evaluations  √   
were checked 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 8 of 9 
By exception, we indicate the specific Strengths and weakness of the organization in light of the management system, as we perceive and seen through
processes in reference to requirements of the criteria being ascribed as these apply and relate to the assessment plan and planning of the assessment.
This aspect relates to Accreditation Body as it does to the protection of consumers in the client-organization’s role within their respective supply – chain.

Disclaimers: (1) herein, we reiterate that any suggestion or opinion that the assessment team expresses does not construe to be a contractual
requirement. (2) The degree of certainty in conclusions increases by the competence of the assessment team as well as the attestation within the
assessment protocol, values, mission and vision under which we operate for the protection of consumers, still remains a certain level of uncertainty.

Strength Weakness

Management commitment Training evaluation 
 

action Request Type I Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:N/A

action Request Type II Form-008 – as we indicate and that each of the AR addresses the basic four (4) questions
as seen in Form-008:

Training effectiveness evaluation process has not done

Observation Form-018 – with uniquely specific identification :N/A

ATL: Bijan Rajabi DATE: 17 April 2016

END of REPORT
 

FORM-014 – Opening Meeting Checklist FORM-009 – MS Reporting,


FORM-017 – Closing Meeting Checklist FORM-008 – RA / AR, as requires
FORM-005 – Participants of opening & closing meetings FORM-018 – OBS, as requires
FORM-004 – Assessment Plan FORM-010 – As requires, recommendation for CoR
FORM-007 – Planning onto -004, as process determined FORM-026 – Assessment documents check-sheet, optional

Вам также может понравиться