Honeywell

Honeywell (CEASA) Subic Bay Inc., Philippines

TPM STANDARD START - DAILY CHECKLIST


LIFT TABLE BRAKE ASSEMBLY-1
MACHINE NAME : Platform, Elevating, Electrohydraulic MONTH : January-17
MANUFACTURER : Bishamon EOA Hydraulic Lift, Inc. LOCATION : Brakes
DOCUMENT NO. : SB-SS-B01 OWNER : Allan Castillo
MODEL NO. : HLT-025-49-24064 LEADER'S CONFIRMATION :
SERIAL NO. : 810413-2

# Check Points Measurement Monitoring by Daily basis (mark 'V', '△', or actual No.)

Inspect machine for loosen Visual


1 check
nuts, sockets and screws

1 2 3 4 5 6 7 8 9 10

Actuate and observe smooth lift Trial 11 12 13 14 15 16 17 18 19 20


2 running
operation
21 22 23 24 25 26 27 28 29 30/31

1 2 3 4 5 6 7 8 9 10
Check oil level. Refill as necessary.
!! CAUTION : USE Acceptable 11 12 13 14 15 16 17 18 19 20
3 RECOMMENDED OIL ONLY level :
300~600 ml
(Last filled date : ) 21 22 23 24 25 26 27 28 29 30/31

1 2 3 4 5 6 7 8 9 10

Touch 11 12 13 14 15 16 17 18 19 20
4 Check all hoses for oil leaks hoses by
hand
21 22 23 24 25 26 27 28 29 30/31

1 2 3 4 5 6 7 8 9 10
Check top table guards for
damage. Replace as Visual 11 12 13 14 15 16 17 18 19 20
5 check
necessary.
21 22 23 24 25 26 27 28 29 30/31
(Last filled date : )
1 2 3 4 5 6 7 8 9 10

Owner's Signature for clearing overall 11 12 13 14 15 16 17 18 19 20


status
(Sign once all are OK or fixed to normal status.) 21 22 23 24 25 26 27 28 29 30/31

Maintenance Request Detail


Date Required Required Maintenance Date finished Performed by