What is QA - QC ?

QA = Qualit y Assurance
( A docum ent ed com pany m anagem ent
syst em )

QC = Qualit y Cont rol


( I nspect ion and t est ing rout ines)

QC is a part of t he QA syst em

Paint School
The cha lle ng e for t he pa int QC

• To ensure t hat t he coating


specificat ion is m et
• To verify t he qualit y of
work carried out by t he
cont ract or/ applicat or.
• To prepare writ t en records
for t he st andard work
– Approval ( Good enough?)
– Not accept able ( non- conform ance)

Paint School
What needs t o be inspected ?
If relevant, the following stages
of the production need to be inspected

• Shop-priming of the steel


• The steel work
(Pre-blasting preparation)
• Cleaning and surface preparation prior
to paint application
• Application of paint
• The applied paint film and its
curing/drying conditions.

Paint School
I nspect ion of st e e l w or k ( Pre- blast ing preparat ion)

The following items need to


be inspected during construction
‚ Rounding of sharp edges.
‚ Smoothing of rough welding seams.
‚ Removal / grinding of weld spatter and
beads.
‚ Cracks and pittings.
‚ Surface faults like laminates etc.
‚ ISO 12944 - 3 , or ISO 8501 - 3

Paint School
I nspect ion of cleaning and sur face preparat ion
pr ior t o a pplica t ion

If relevant, the following conditions


must be inspected / verified

‚ Cleanliness (salt, oil, grease and dust/dirt)


‚ Evaluation of present condition (rust grade)
‚ Surface preparation (e.g. blast cleaning)
‚ Cleanliness of prepared surface
(salts, oil, grease, dust and dirt)
‚ Climatic conditions
(temperature, relative humidity etc.)

Paint School
I nspect ion du r in g a pplica t ion

The following must be verified, inspected or tested:



Record name of coating and batch no.


Ensure proper mixing of 2-pack paints


Ensure use of the correct thinner


Measuring the wet film thickness (WFT)


Number of coats as given in the specification


Cleanliness between coats (salts, dust, oil etc.)


Drying time / recoating intervals


Control of equipment: Pressure, nozzle etc.
Climatic conditions (Ventilation, Air and steel temperature and
the relative humidity)

Paint School
I nspect ion a ft e r a pplica t ion

After application
the following must be checked
‚ Climatic conditions (Ventilation,
Temperature and humidity)
‚ Curing / drying of the film
‚ Dry film thickness (DFT)
‚ Adhesion
‚ Holiday detection (if required)

Paint School