Академический Документы
Профессиональный Документы
Культура Документы
QA = Qualit y Assurance
( A docum ent ed com pany m anagem ent
syst em )
QC is a part of t he QA syst em
Paint School
The cha lle ng e for t he pa int QC
Paint School
What needs t o be inspected ?
If relevant, the following stages
of the production need to be inspected
Paint School
I nspect ion of st e e l w or k ( Pre- blast ing preparat ion)
Paint School
I nspect ion of cleaning and sur face preparat ion
pr ior t o a pplica t ion
Paint School
I nspect ion du r in g a pplica t ion
‚
‚
Record name of coating and batch no.
‚
Ensure proper mixing of 2-pack paints
‚
Ensure use of the correct thinner
‚
Measuring the wet film thickness (WFT)
‚
Number of coats as given in the specification
‚
Cleanliness between coats (salts, dust, oil etc.)
‚
Drying time / recoating intervals
‚
Control of equipment: Pressure, nozzle etc.
Climatic conditions (Ventilation, Air and steel temperature and
the relative humidity)
Paint School
I nspect ion a ft e r a pplica t ion
After application
the following must be checked
‚ Climatic conditions (Ventilation,
Temperature and humidity)
‚ Curing / drying of the film
‚ Dry film thickness (DFT)
‚ Adhesion
‚ Holiday detection (if required)
Paint School