The document lists 29 method statements for construction works on a project numbered 1 through 29. It also lists 5 method statements from subcontractors on the project, numbered 1 through 5. The method statements reference specific construction tasks and systems like concreting works, formworks, steel reinforcement, and electrical installation works.
The document lists 29 method statements for construction works on a project numbered 1 through 29. It also lists 5 method statements from subcontractors on the project, numbered 1 through 5. The method statements reference specific construction tasks and systems like concreting works, formworks, steel reinforcement, and electrical installation works.
The document lists 29 method statements for construction works on a project numbered 1 through 29. It also lists 5 method statements from subcontractors on the project, numbered 1 through 5. The method statements reference specific construction tasks and systems like concreting works, formworks, steel reinforcement, and electrical installation works.
1 TCS/MSM/CW/01 Concreting Works 2 TCS/MSM/FW/02 Formworks 3 TCS/MSM/SR/03 Steel Reinforcement 4 TCS/MSM/BW/04 Brickworks 5 TCS/MSM/PW/05 Plastering Works 6 TCS/MSM/WPW/06 Water Proofing Works 7 TCS/MSM/FWTW/07 Floor and Wall Tiling Works 8 TCS/MSM/SCW/08 Skim Coat Works 9 TCS/MSM/CW/09 Ceiling Works 10 TCS/MSM/SW/10 Screeding Works 11 TCS/MSM/SSW/11 Structural Steel Works 12 TCS/MSM/AWW/12 Aluminium Window Works 13 TCS/MSM/DW/13 Door Works 14 TCS/MSM/RW/14 Roof Works 15 TCS/MSM/PW/15 Painting Works 16 TCS/MSM/EIW/16 Electrical Installation Works 17 TCS/MSM/PSIW/17 Plumbing And Sanitary Installation Works 18 TCS/MSM/EXRW/18 External Sewer Reticulation Works 19 TCS/MSM/DW/19 Drainage Works 20 TCS/MSM/WRW/20 Water Reticulation Works 21 TCS/MSM/SW/21 Skimming Works 22 TCS/MSM/SLW/22 Street Lighting Works 23 TCS/MSM/LW/23 Landscaping Works 24 TCS/MSM/AVW/24 Air-Conditioning & Ventilation Works 25 TCS/MSM/ES/25 Elevator System 26 TCS/MSM/FPS/26 Fire Protection System 27 TCS/MSM/PW/27 Plumbing Works 28 TCS/MSM/WPT/28 Water Ponding Test 29 TCS/MSM/PS/29 Structural Works-Pour Strip List of Method Statement ( Subcontractor)
NO Company Method Statement
1 MM Two M Machinery Sdn Bhd a)Installation Of Tower Cranes 1 b)Installation Of Tower Cranes 2 2 Pentens Construction Chemicals Pentens Top 1 Non-Metallic Floor Hardener 3 Keller (M) Sdn Bhd Method Statement For Bored Piling Works 4 Keller (M) Sdn Bhd Method Statement For Pile Testing : a)Pile Dynamics Analyzer b)Pile Integrity Test 5 Keller (M) Sdn Bhd Method Statement For : Preliminary Test Pile Maintain Load Test