List of Method Statement

No Document Reference Method Statement


1 TCS/MSM/CW/01 Concreting Works
2 TCS/MSM/FW/02 Formworks
3 TCS/MSM/SR/03 Steel Reinforcement
4 TCS/MSM/BW/04 Brickworks
5 TCS/MSM/PW/05 Plastering Works
6 TCS/MSM/WPW/06 Water Proofing Works
7 TCS/MSM/FWTW/07 Floor and Wall Tiling Works
8 TCS/MSM/SCW/08 Skim Coat Works
9 TCS/MSM/CW/09 Ceiling Works
10 TCS/MSM/SW/10 Screeding Works
11 TCS/MSM/SSW/11 Structural Steel Works
12 TCS/MSM/AWW/12 Aluminium Window Works
13 TCS/MSM/DW/13 Door Works
14 TCS/MSM/RW/14 Roof Works
15 TCS/MSM/PW/15 Painting Works
16 TCS/MSM/EIW/16 Electrical Installation Works
17 TCS/MSM/PSIW/17 Plumbing And Sanitary Installation Works
18 TCS/MSM/EXRW/18 External Sewer Reticulation Works
19 TCS/MSM/DW/19 Drainage Works
20 TCS/MSM/WRW/20 Water Reticulation Works
21 TCS/MSM/SW/21 Skimming Works
22 TCS/MSM/SLW/22 Street Lighting Works
23 TCS/MSM/LW/23 Landscaping Works
24 TCS/MSM/AVW/24 Air-Conditioning & Ventilation Works
25 TCS/MSM/ES/25 Elevator System
26 TCS/MSM/FPS/26 Fire Protection System
27 TCS/MSM/PW/27 Plumbing Works
28 TCS/MSM/WPT/28 Water Ponding Test
29 TCS/MSM/PS/29 Structural Works-Pour Strip
List of Method Statement ( Subcontractor)

NO Company Method Statement


1 MM Two M Machinery Sdn Bhd a)Installation Of Tower Cranes 1
b)Installation Of Tower Cranes 2
2 Pentens Construction Chemicals Pentens Top 1 Non-Metallic Floor Hardener
3 Keller (M) Sdn Bhd Method Statement For Bored Piling Works
4 Keller (M) Sdn Bhd Method Statement For Pile Testing :
a)Pile Dynamics Analyzer
b)Pile Integrity Test
5 Keller (M) Sdn Bhd Method Statement For :
Preliminary Test Pile Maintain Load Test