COMPANY PROFILE

C G Edifice is known to be a hard work, and a can-do attitude


when providing construction services in the commercial, civil
infrastructure

CG Edifice is 100% employee-owned. As owners, employees are


motivated to excel, to hold each other accountable, and to ensure
that everyone has the responsibility, the freedom, and the power to
act.

CG Edifice is an integrated construction company headquartered in


Mumbai, India. Founded in 2016, has grown into a company
renowned for its classy developments in Office Buildings,
Residential, within a year of its inception, a phenomenal growth
fuelled by the resolute and dynamic leadership of its founding
Managing Director, Mr Ajay Thakur

Works being done:


Building (Residential & Commercial)
Structural
I reported for training in CG Edifice Thane mumbai on 12-02-
18
I was asked to report at the site in Thane Mumbai where a
major construction was
going on. The project was the construction of a residential building.
In connection with
Same, I have reported to a Project Manager Mr. Kamlesh Yadav at
Hiranandani Meadows Thane mumbai
He gave me brief introduction of this project under.

I have worked at Structural Site under the guidance of


Mr.Kamlesh Yadav (Project Manager) and Mr. Manower Shaikh
(Project Engineer)

About C G Edifice
C G Edifice is a leading real estate and construction company
with operations in Thane Mumbai. The robust team consisting of
Civil Engineers, Project Management experts and Marketing and
Finance professionals create the synergy required to offer unmatched
housing options and related services across the state of Mumbai

CG Edifice has earned a formidable reputation for delivering


innovative solutions that go beyond plotting and enter the realm of
integrated projects that incorporate high-end residential spaces with
walk-to-work environments.C G Venuzia is a residential commune
that blends the finesse of global living with the essence of nature to
swathe you in a golden glow of luxury, purity and abundance.

Industrial training
(i) Aim
The main aim of industrial Training program is to produce graduates
who are ready to face the working world. The program also aims to
produce the knowledgeable, skilled and experienced graduates,
demanded by employers, who are able to apply the knowledge
acquired at university to the working world. The industrial training
program provides opportunities for exposure to the working world,
which will make graduates more aware of the hopes and expectations
that industry has of them. The program will also equip students with
real work experience. Placing students in industry also increases their
chances of employment after diploma, as there is a strong possibility
that they will be offered a job in the same place where they do their
training. Apart from this, the training experience will further solidify
the on-campus learning process and activities, while also providing
student with relevant work experience.

(ii) Objective
The Industrial Training program has main objectives:
1) To give students the opportunity to apply the knowledge and
skills they have acquired in a real-life work situation.
2) To provide students with opportunities for practical, hands-on
learning from Practitioners in the students field of study.
3) To give students work experience while they are studying their
chosen subject.
4) To expose students to the work environment, common
practices, employment Opportunities and work ethics in the
relevant field.
5) To inculcate soft skills relevant to the needs of employers.
6) To provide opportunities for student to be offered jobs in the

same organizations where they undergo Industrial Training.

About Project
C G Edifice

 Globally inspiring venetian Architecture


 Its outdoors with designer landscaping, pathways, water bodies,
shade giving trees and seating areas will fascinate you.
 Climate-friendly strategies for hot and humid environs have been
worked out to give a colorful lifestyle.
 Ramakrishna Venuzia reflects the aspirations of the global citizen
and brings it within every home seeker's reach.
 Standing tall in the scheme of new city Celio is 'the' address to
flaunt.
 Tread the path, work out a Yoga regimen, sit by water pond or talk
to spouse under shaded tree.
 The birds, butterflies, sunshine and the gentle breeze enchant you
at every step.
 Sync and nurture with nature at celio site
 Indulge in life – in the lap of nature

Construction Specialities
 Earth quake resistant monolithic R.C.C framed structure
 Individual Flats
 Zigzag model – Proper ventilation, privacy for sit outs
 All floors are above ground including parking levels (-1 & -2)
 66 feet gap between tower to tower
 10 feet gap between flat to flat
 10 feet gap between slab to slab
 8-10 feet wide corridor
 8 lifts per tower (1:1 ratio) – High speed automatic 10/12
passenger V3F technology lifts with Automatic Rescue
Device.
 Service balcony area for AC compressors
 All materials used – reputed make
 Construction Type/Method – S-FORM

Construction Method
 S-FORM is an aluminium formwork system, which has
proven economical as well as satisfactory for the overall
Indian construction environment.
 In this system of formwork construction, cast–in–situ
concrete wall and floor slabs cast monolithic provides the
structural system in one continuous pour.
 The walls and the floor slabs are casted simultaneously so
there are no weak joints.
 The walls are made of reinforced concrete which provides
much greater stability than columns with brick walls.
 The wall surfaces are made of concrete which do not crack
like plaster and maintains a smooth surface for much longer
time.

FOUNDATION & STRUCTURAL FRAME


Earth quake resistant monolithic R.C.C. framed structure
( 2 basements+ stilt + 22/31 floors)

SUPER STRUCTURE
R.C.C. walls/ Block masonry walls for external and internal walls

1st to 6th Tower Floor Plan


C G Edifice
Celio

ORGANIZATION CHART FOR SITE WORK


Managing Director
(Mr. Ajay Thakur)

General Manager
(Mr. R.R KASHYAP)

Project Manager
(Mr. Kamlesh yadav)

Project Engineer
(Mr. Manower shaikh)

Project Forman Project Supervisor


(Mr. Shahid Bhatti) (Mr. Ashraf
shaikh)

MIVAN SHUTTERING
Mivan is the name of company which invented "Aluminium Formwork". So,

its often called mivan shutterin.


Mivan is an aluminium formwork system developed by a

European construction company. In 1990, the Mivan Company Ltd.

from Malaysia started manufacturing these formwork systems. Today,

more than 30,000sqm of formwork from Mivan Co. Ltd. is used

across the world. There are a number of buildings in Mumbai that are

being constructed with the help of the Mivan system, that has proven

economical as well as satisfactory for the overall Indian construction

environment. One of the architectural examples is XRBIA which uses

MIVAN system to achieve its dream of “A House for Every Indian”

The technology has been used extensively in Europe, Gulf

Countries, Asia and other parts of the world. Mivan technology is

suitable for constructing large number of houses in a short span of

time using room size forms to construct walls and slabs in one

continuous pour on concrete. In this system of formwork

construction, cast–in–situ concrete wall and floor slabs cast

monolithic provides the structural system in one continuous pour. To

facilitate fast construction, early removal of forms can be achieved by


hot air curing / curing compounds. Large room sized forms for walls

and floor slabs are erected at site. These strong and sturdy forms are

fabricated with accuracy and are easy to handle. The concrete is

produced in RMC batching plants under strict quality control and

convey it to site with transit mixers.

The frames for windows, doors and ducts for services are

placed in the form before concreting. Staircase flights, façade panels,

chajjas and jails etc. and other pre-fabricated items are also integrated

into the structure. This proves to be a major advantage as compared

to other modern construction techniques. High quality Mivan


Formwork panels ensure consistency of dimensions. On the removal

of the formwork mould a high quality concrete finish is produced to

accurate tolerances and verticality. The high tolerance of the finish

means that, no further plastering is required.

Uses of Mivan Formwork:

 3S – System of Construction – Speed, Strength, Safety

 Column and beam construction are eliminated

 Walls and slabs are cast in one operation


 Specially designed, easy to handle light weight pre-engineered

aluminium forms

 Fitting and erecting the portion of shuttering

 Carrying out concreting of the walls and slabs together

Advantages:

 Mivan formwork requires relatively less labour

 More seismic resistance

 Increased durability
 Lesser number of joints and reduced leakages

 Higher carpet area

 Smooth finishing of wall and slab

 Uniform quality of construction

 Negligible maintenance

 Faster completion

Limitations:

Even though there are so many advantages of Mivan formwork the

limitations cannot be ignored. However the limitations do not pose

any serious problems. They are as follows: –


 Because of few small sizes finishing lines are seen on the concrete

surfaces

 Services after completing become slightly difficult due to the small

width of components

 It requires uniform planning as well as uniform elevations to be cost

effective

 The formwork requires number of spacer, wall ties etc. which are

placed @ 2ft c/c; these produce problems such as seepage, leakages

during monsoon

 Due to box-type construction, contraction cracks are likely to appear

 Heat of hydration is high due to shear walls

 It is rigid in design once placed, as any alteration becomes tough later

Remedial Measures:

It is possible to minimize contraction cracks by providing

control strips in the structure which could be concreted with a delay

of about 3-7 days after major concreting. The problem of cracking

can be avoided by minimizing the heat of hydration by using flash.


In mivan shuttering we can cast whole slab,beam,column
at one go making the unit a composite structure.

Bottom view of mivan setup;


Top view of mivan slab setup;

Columns are casted first followed by beam and slab,


concreting is done by boom placer or pump.
Advantages;
1. Fast completion of floors
2. Uniformity in structural components.
3. Good finishing can be seen.
4. No need of plastering.
Disadvantages;
1. Expensive, used for typical floors only.
2. Initial setup takes time.
3. Construction joints should be executed properly.
4. Alignment maintainence needs skilled labourers.
5. Holes caused by wall tie should be grouted properly with
GP2 else the will be problem of leakage in columns.

Tools Used in Mivan Shuttering