Work in Progress
Description of Work Done Today
-Pouring of concrete at foundation footing slabs
-Curing of concrete covering with heisian cloth
-QP permit signing
Obstruction None
(存在问题)
Summary of Resources (资源汇总)
No of labor(工人人数) 1-project engineer,1-site supervisor,1 - Driver
Worker : 1.Dev Narayan 2.Sat Nerayan 3.Kishori Yadav 4.Ram Kumar
5.Kahmud Mandal 6.BJ Mochi
List of Tools (工具清单) 1 unit- Plate compactor ,1 unit- Bar cutter machine, 1 unit- wood cutter
machine, 4- knipex, 2- shovel , 1- wheel borrow, 1 –Fabricated wooden
box, 1 roll- extension wire, 1 unit – concrete vibrator, 1- water tank , 1
roll – hessian cloth
Material / Consumable Petrol ,plywood, wooden, re- bars
Work in detailed Progress -Pouring of concrete at foundation footing slabs –completed poured 16
units footing slabs
-Curing of concrete covering with heisian cloth