ABBREVIATIONS :
AF - ABLUTION FAUCET
HB - HOSE BIBB
hwrt - HOT WATER RECOVERY RATE
JS - JANITOR SINK
KS - KITCHEN SINK
LAV - LAVATORY
SHO - SHOWER HEAD
TDH - TOTAL DYNAMIC HEAD
WC - WATER CLOSET
ft - FEET
gals - GALLONS
gph - GALLON PER HOUR
gpm - GALLON PER MINUTE
kg - KILOGRAM
KW - KILOWATT
l/day - LITERS PER DAY
l/min - LITERS PER MINUTE
LPH - LITERS PER HOUR
l/s - LITERS PER SECOND
l/tree/day - LITERS PER TREE PER DAY
l/m2/day - LITERS PER SQUARE METER PER DAY
m - METER
m/s - METER PER SECONDS
m2 - SQUARE METER
m3 - CUBIC METER
m3/day - CUBIC METERS PER DAY
m3/min - CUBIC METERS/MINUTE
3
m /s - CUBIC METERS/SECOND
min - MINUTE
mm - MILLIMETER
pcs - PIECES
psi - POUNDS PER SQUARE INCH
qty - QUANTITY
SEC - SECONDS
WSFU - WATER SUPPLY FIXTURE UNIT
INTERNAL WATER SUPPLY CALCULATIONS
1
INTERNAL WATER SUPPLY CALCULATIONS
2
INTERNAL WATER SUPPLY CALCULATIONS
3
FIXTURE COUNT
1. Fixture Count:
FLOOR NO. /BLDG WC WC-1 WC-6 Laundary LAV-2 KS Shower/Bathtub PS HB (Roof) SUB-TOTAL
GF B06 (PRELIMANARY BOYS SCHOOL)
Public 0 0 0 0 0 0 0 0 2 2
Private 6 0 0 1 8 2 4 6 0 27
TOTAL 6 0 0 1 8 2 4 6 2 29
`
2. Total Water Supply Fixture Unit 3. Total RAW Water Minimum Required Flow Rate:
(Based on NPC 2006 Table 10.14.2A )
FIXTURES NO WSFU TOTAL From demand load chart, for system based on Flush Tank
WC (Western, Flush Tank, Public, Handicap) 6 x 2.5 15 Refer to NPC 2006 Table 10.14.2B
WC-1 (Western, Flush Tank, Public) 0 x 2.5 0
WC-1 (Western, Flush Tank, Private) 0 x 2.5 0
WC-6 (Eastern, Flush Tank, Public) 0 x 2.5 0 Total WSFU = 50.6 wsfu
WC-6 (Eastern, Flush Tank, Private) 0 x 2.5 0
Laundry 1 x 2.0 2
LAV-2 (Private) 8 x 0.7 5.6 Minimum Require Flow Rate = 29.2 gpm
LAV-2(Public) 0 x 1.0 0
KS (Public) 2 x 1.5 3 = 1.84 L/S
Shower 4 x 2.0 8
PS 6 x 2.0 12
HB 2 x 2.5 5
TOTAL 50.6 `
1
PROJECT: MODEL-1 B02b
BOOSTER PUMP WATER PRESSURE CALCULATION
Head loss calculation using ( 2 ) HAZEN-WILLIAMS Formula
Accumulative Pressure
ID Pipe Inner diameter
RE Reynolds number
DN Nominal diameter
V Mean Velocity
GH Static heal
Loss m per m
0.6 Butterfly valve
DH Total loss
L Pipe length
Q Flow rate
2.0 Strainer
0.5 reducer
0.9 tee
no. DN mm m mm L/S l/s 1/1 m m/s 1/1 1/1 m m m m m m
A-B (From Pump) 50 pvc 42.6 0.5 145 1.84 1.84 1 1 2 1 1 4.2 1.2909 54994.384 0.04317 4.317 0.022 0.357 0.378 0.38 0.3783389
B-C 40 pvc 34 3 145 0.82 0.82 1 1 1.2 0.9032 30707.542 0.02898 2.898 0.087 0.05 0.137 0.14 0.136842
C-D 40 pvc 34 6.4 145 0.41 0.41 2 1 1.5 0.4516 15353.771 0.00803 0.803 0.051 0.016 0.067 0.07 0.066975
D-E 32 pvc 27.2 8.2 145 0.41 0.41 1 3 1 3.5 0.7056 19192.214 0.02381 2.381 0.195 0.089 0.284 0.28 0.2840289
E-F 25 pvc 21.2 1.5 145 0.19 0.19 1 2 2 0.5383 11411.109 0.01929 1.929 0.029 0.03 0.058 0.06 0.0584649
F-G 25 pvc 21.2 1.5 145 0.13 0.13 2 2 1 2.9 0.3683 7807.601 0.00955 0.955 0.014 0.02 0.034 0.03 0.0343741
G-H 20 pvc 17 0.9 145 0.06 0.06 1 1 1 1.4 0.2776 4718.476 0.00732 0.732 0.007 0.005 0.012 0.01 0.0120845
Static head = m
total friction loss = 0.97 m
total dynamic head = 0.97 m
KI
TC
HE
ILET N
TO
MATERIAL SPECIFICATION
TO
ILE COLD WATER PIPES uPVC PIPES CLASS-5
T
TO HOT WATER PIPES CPVC PIPES CLASS5
ILE
T
LA
UN
DR
Y
TO
ILE
T
CLIENT :
MINISTRY OF INTERIOR
KINGDOM OF SAUDI ARABIA
Planing & Development
Modernization Program
CONSULTANT :
TO
ILE
T
1 LAVATORY 1.0
4 SHOWER 4.0
DESIGNER :
PO Box 8089 Riyadh 11482
WATER SUPPLY PIPES ARE UPVC CLASS 5
COLD & HOT WATER PLUMBING SERVICES ISOMETRIC DIAGRAM B02b-VILLA TYPE-A
MODEL - 1
WATER SERVICES
ISOMETRIC DIAGRAM
BOOSTER WATER PUMP SIZING
a. System Capacity
c. System Requirement
1.84
CAPACITY FOR EACH BOOSTER PUMP = 1.84 l/s Vs 22.00 m
P= 0.72 kW