ACL-4833
INSTRUCTION MANUAL
FOR
132kV SPRING OPERATED
GAS CIRCUIT BREAKER
IMPORTANT:
Read and understand all safety instructions carefully prior to using.
This manual should be considered a permanent part of the equipment and should remained with the
equipment.
Do not use or operate this switchgear in a manner not mentioned in this Instruction Manual. Using
any non-genuine part, remodeling the switchgear, or using/handling it without following this Instruction
Manual. Any such practice may result in a machine failure or personal injury. Japan AE Power Systems
assumes no responsibility for damage caused by such misuse or careless handling.
Only properly trained and qualified personnel should use this manual. This manual is not intended
as a primer. It has been prepared on the understanding that it will be read and used by customer's personnel,
who have received indoctrination in this system operation and maintenance under the technical guidance
and/or training of personnel, and have obtained appropriate qualifications required by law and other
regulations if any.
This manual is not a complete textbook. A manual of this kind cannot contain complete information
regarding all aspects of the equipment and its use. It does not provide instruction or information regarding
every contingency which could arise during installation, operation and maintenance. Any questions which
arise which are not clearly covered by the manual should be referred to Japan AE Power Systems.
This manual is intended only for a specific purpose. The information contained in this manual is
in-tended only for the use of the customer and only in connection with the specific application for which the
customer has advised Japan AE Power Systems Corporation.. that the equipment was purchased. Use by
any other person or for any other purpose is not authorized and as to any such unauthorized use, Japan AE
Power Systems Corporation.. assumes no responsibility and makes no representation whatsoever.
This manual is not a warranty or a contract document. The only undertakings of Japan AE Power
Systems Corporation. with respect to the equipment described or the information contained in this manual
are contained in the sales contract between Japan AE Power Systems Corporation.. and the customer.
Nothing contained in this manual is to be construed as in any way changing or enlarging the undertakings of
Japan AE Power Systems Corporation.
This manual involves PROPRIETARY INFORMATION of Japan AE Power Systems Corporation. and
all rights regarding the same are expressly reserved. It is submitted under a confidential relationship for a
specific purpose, and the recipient, by accepting this manual, assumes custody and control and agrees (a)
that this manual will not be used, copied, or reproduced in whole or in part, nor its contents revealed in any
manner or to any person except to meet the purpose for which it was delivered, and (b) that any information
contained herein will not be incorporated in other documents.
All Rights Reserved, Copyright © 2005, Japan AE Power Systems Corporation Printed in Japan
Address and phone and fax numbers (direct-dial phone and fax numbers)
Before trying to install, run, or service this switchgear, be sure to read through this Instruction Manual and all
other related literature. Then use your switchgear correctly. Use it only after you have learned all there is to
know about this switchgear, safety information, and all precautions.
WARNING Failure to observe any warning may cause a dangerous situation, resulting in
death or serious injury.
CAUTION Failure to observe any caution may cause a dangerous situation, resulting in a
medium degree injury or minor injury or in property damage alone.
Depending on the case, failure to observe a WARNING may lead to a serious situation. Both warnings and
cautions give important precautions. Therefore observe all of them.
* "Serious injury" mentioned above means a loss of sight, injury, burn (hot or cold), shock hazard, fracture,
and poisoning which will cause an aftereffect and which requires hospitalization or prolonged medical
care. "Injury" mentioned above means physical damage, burn, shock hazard, and other injury that do not
require hospitalization or prolonged medical treatment. Property damage means asset damage or loss,
equipment damage, and secondary damage caused by equipment damage.
These safety instructions are Japan AE Power System’s proposal that makes up for even more important
aspects concerning the safety of Japan AE Power System’s Gas-Insulated Switchgear. Users are requested
to establish safety measures according to applicable standards and criteria in order to run and maintain your
equipment and facility safely. Japan AE Power Systems assumes no responsibility for any damage caused
by the instruction failure to take any of these safety instructions.
S-1
SAFETY INSTRUCTIONS (Cont.)
The warnings given below are related to Japan AE Power System’s Gas-Insulated Switchgear. Failure to
observe any of these warnings may result in personal injury or death. The sequence of the items in this list
does not in any way represent the priority of importance. All items are crucial.
WARNING
・ Be sure to operate this circuit breaker in accordance with the operation sequence and method
described in this User's Manual. Failure to use a correct operation sequence may cause a
malfunction or failure
・ Verify the items not described in this User's Manual with the concerned manufacturer prior to
execution.
・ Pay due attention to the high voltage applied to the main circuit of the gas circuit breaker.
Touching the active main circuit may cause electrocution.
・ Prior to work on/above the circuit breaker, be sure to open the circuit access cover on the both
sides of the circuit breaker and connect the grounding device to ground each phase.
・ Open the front cover of the operating equipment part only when necessary. In particular, the link
mechanism instantaneously starts to operate during circuit breaker operation so that touching it is
very dangerous.
・ During work with the front cover of the operating equipment part opened, use great care to prevent
the cover from being opened/closed by a gust of window.
・ Do not touch the connection terminals in the operating equipment part, to which a voltage is
constantly applied to operate each device. Prior to work, always verify that the power supply is
securely cut off.
S-2
SAFETY INSTRUCTIONS (Cont.)
WARNING
・ Take the following precautions before operating the circuit breaker using the manual handle:
(a) Verify that no voltage is applied to the main circuit.
(b) Turn off the control power in the operation cubicle.
(c) Discharge the making and breaking springs by opening/closing the circuit using the manual
buttons.
Depress the manual buttons "OFF" and "ON" in this order. The respective springs are
discharged only when they have stored energy. Verify that the indicators show
"Discharged" and "CLOSED."
(d) Upon completion of the above spring discharging operation, return the control power in the
operation cubicle to the original state.
(e) At the end, be sure to verify that the marking line of the gear coupling outer ring matches
that of the inner ring. If they are not aligned, lift the gear coupling outer ring, rotate it to
align the marking lines, and return the outer ring to the original position.
S-3
SAFETY INSTRUCTIONS (Cont.)
WARNING
・ Be sure to withdraw SF6 gas from the sealed chamber using a gas recovery unit during its
discharging for inspection as it will cause an oxygen shortage accident (oxygen density 18% or
less).
The SF6 gas may remain in the basement or pit since it is heavier than air, requiring oxygen
density measurement after ventilation.
・ SF6 gas harmful to personnel can be in inert state after a ground or short-circuit accident.
Be sure to collect the SF6 gas using the gas recovery unit with absorbent.
S-4
SAFETY INSTRUCTIONS (Cont.)
CAUTION
・ Prevent water or foreign material from entering the area charged with sulfur hexafluoride (SF6)
gas.
・ Keep foreign material away from the gas piping. Prevent foreign material from entering the
gas piping.
・ Prevent damage to the packing and packing contact face in the gas sealed airtight sections.
・ Take the following precautions when installing the circuit breaker main unit:
(a) Pay due attention to the location of the ground terminal and the orientation of the operation
box.
(b) Accurately provide a level area.
(c) Verify that the foundation bolts are firmly tightened.
・ Take the following precautions when charging sulfur hexafluoride (SF6) gas:
(a) It is necessary to control the moisture in the SF6 gas of the circuit breaker to 150 ppm (by
volume) or less. Use care to prevent moisture from entering during charge of SF6 gas.
Verify that the locking contact of the gas density detector turns ON at a gas pressure of 0.5
MPa and the warning contact turns ON at 0.55 MPa.
(b) Check for gas leakage from the pipe joint part and flange packing part using the gas leak
detector.
S-5
SAFETY INSTRUCTIONS (Cont.)
CAUTION
・ Be sure to conduct the following before starting the operation of the product:
(a) Verify that the product can be operated without any trouble by repeating the manual
opening/closing operation several times in accordance with Section 7.1.
S-6
PREFACE
This Instruction Manual covers the specifications, construction, installation, operation, and maintenance of
gas circuit breaker. This spring-operated gas circuit breaker (GCB) is an easily-operated GCB using the high
dielectric strength of sulfur hexafluoride (SF6) gas for excellent arc-extinguishing performance. This
Instruction Manual describes the operation method for safely obtaining the optimum functions of the
spring-operated GCB.
For the terms and abbreviations used in this Instruction Manual, see the table below.
Term Meaning
Main circuit All conductive parts of the switchgear constituting wires to be opened and
closed.
Control circuit A circuit that controls energy for operation of the switchgear in response to
signals from outside the GIS.
Operating circuit A circuit used to operate the switchgear.
Auxiliary circuit Generic terms for all circuits except for the main circuit, operation circuit, and
control circuit of the switchgear.
Ambient air temperature The temperature of the air surrounding the switchgear as measured under
certain conditions.
Switch Mechanical switch capable of opening and closing wires under normal
conditions and under specified overload running conditions, of flowing currents,
or of flowing currents in a short-circuit or in a specified abnormal circuit state for
a specified period.
Terminal A conductive part designed to connect the GIS electrically to external circuits.
Earth Terminal A terminal designed to ground part of the switchgear when connected to the
ground in a specified manner.
Contact The conductive portion of the switchgear designed to constitute a conductive
part by getting into contact when closed, and move relatively to open and close
the circuit involved.
Fixed contact A contact mounted in the fixed region of a conductive part constituting a circuit.
Moving contact A contact mounted in the movable region of a conductive part constituting a
circuit.
Main contact Contact provided in the main conductive part to supply current to the main
circuit when the circuit is closed
Arcing contact Contact provided to prevent arcing to the main contact by inducing an arc by
opening or closing
a-contact A contact in an auxiliary switch designed to close when the main contact of the
switchgear closes and opens when the main contact opens.
b-contact A contact in an auxiliary switch designed to close when the main contact of the
GIS closes and open when the main contact opens.
Conductive part The current-conductive portion of the GIS.
Main conductive part The conductive portion where the main circuit current flows.
Arc-control device Device that contains the arc contacts, and restrains the arc in the container to
promote arc extinguishing.
Control device Equipment that receives instructions or signals from outside the switchgear,
selects from among them, and controls the energy level for running the
switchgear.
i
Term Meaning
Control switch A mechanical switch that controls the operation of the switchgear.
Pilot switch A control switch that gets activated automatically when a specified operating
condition is reached.
Pressure switch A detection switch that gets activated when the gas or liquid pressure reaches
a specified level.
Push-button switch A switch that interlocks with the operation of the switchgear and produces
displays.
Auxiliary switch Switch used for interlock indication by linking with the switching equipment
Change-over switch A control switch that switches between two or more circuits.
Contactor A mechanical switch that always returns to a state before operation when a
feed of operation energy is turned off and which is operated by means other
than manual and frequently opens and closes wires in normal state including
overloads.
Control The action of energizing, de-energizing, or locking a solenoid valve, coil, or
other equipment designed to activate the switchgear operator according to the
purpose of operation.
Control voltage Voltage applied to a terminal of the controller.
Operation The action of moving a movable contact of the switchgear from one position to
the one next to it.
Operating voltage Voltage added to a terminal of the solenoid valve, motor, or other equipment on
the operator.
Closing operation The action of closing an open contact.
Opening operation The action of opening a closed contact.
Manual operation An operation conducted by manual means alone without using any other
source of motive power.
Trip free When contact of a contact or an arc between contacts has caused the main
circuit to be active, the tripper can operate to trip the circuit breaker even if the
closing command is being effective. Alternatively, even if a command for the
closing device to conduct closing is still given after completion of tripping, the
closing operation is conducted when the current closing command has been
cancelled and another closing command has been given.
Anti-pumping Preventing re-closing as long as the closing command is continuously effective
upon completion of tripping
Trip/release Control operation for opening the circuit of the switching equipment upon
receiving the command from an external device
Operating current Minimum current for operating the tripper
Interlock Regulating the operation of the switching equipment by relating to the location
or operation of other device
Breaking current Current which flows through each pole during opening operation of the
switching equipment and is indicated by a value at a moment of arcing
Standard operating Operating sequence used as a standard for defining the closing performance
sequence and opening performance of the circuit breaker and switch
ii
CONTENTS
0. INTRODUCTION .......................................................................................................0-1
1. RATINGS AND SPECIFICATIONS...........................................................................1-1
2. CONSTRUCTION AND OPERATION PRINCIPLE...................................................2-1
2.1. Basic construction ...................................................................................................................... 2-1
2.2. Interrupter .................................................................................................................................... 2-1
2.3. Operating part.............................................................................................................................. 2-1
2.4. Operating equipment .................................................................................................................. 2-1
2.5. Operation description ................................................................................................................. 2-2
2.6. SF6 gas system (Fig5-9).............................................................................................................. 2-2
2.7. SF6 gas handling and safety precautions ................................................................................ 2-3
2.8. Manual operation (Fig5-6 & 5-7)................................................................................................. 2-3
3. INSTALLATION ........................................................................................................3-1
3.1. Installing the GCB Main Unit...................................................................................................... 3-1
3.2. Filling with SF6 gas..................................................................................................................... 3-1
4. TEST RUN.................................................................................................................4-1
4.1. Test Operation by Charging Manually ...................................................................................... 4-1
4.2. Opening/Closing Operation with Manual Handle..................................................................... 4-2
4.3. Dismounting operating mechanism .......................................................................................... 4-5
7. TROUBLESHOOTING ..............................................................................................7-1
iv
LIST OF ILLUSTRATIONS
LIST OF TABLES
Table 1-1 Typical ratings and specifications of Gas Circuit Breaker ........................................................... 1-1
Table 5-1 Maintenance inspection standard ................................................................................................ 5-2
Table 5-2 Maintenance inspection standard ................................................................................................ 5-2
Table 5-3 Daily Inspection Procedure.......................................................................................................... 5-4
Table 5-4 Regular Inspection Procedure ..................................................................................................... 5-5
Table 5-5 Regular Inspection Procedure ..................................................................................................... 5-8
Table 5-6 Regular Inspection Procedure ................................................................................................... 5-10
Table 6-1 Regular Inspection Procedure ..................................................................................................... 6-1
v
Introduction
0. Introduction
WARNING
・ Be sure to operate this circuit breaker in accordance with the operation sequence and method
described in this User's Manual. Failure to use a correct operation sequence may cause a
malfunction or failure.
・ Verify the items not described in this User's Manual with the concerned manufacturer prior to
execution.
・ Pay due attention to the high voltage applied to the main circuit of the gas circuit breaker.
Touching the active main circuit may cause electrocution.
・ Do not work on/above the circuit breaker in an active state.
Prior to work on/above the circuit breaker, be sure to open the circuit access cover on the both
sides of the circuit breaker and connect the grounding device to ground each phase.
This Japan AE Power Systems CFPT mid-capacity gas circuit breaker (GCB) is a compact grounded tank
type circuit breaker that takes advantage of the excellent arc-extinguishing performance and high dielectric
strength of sulfur hexafluoride (SF6) gas. This circuit breaker is easily operated due to use of an
arc-extinguishing, single-pressure puffer system having a simple structure and operation principle.
This User's Manual describes the handling of the CFPT circuit breaker. Carefully read this manual to
properly operate the circuit breaker and maintain its features for a long period of time. Table 1 shows the
specification to which this User's Manual applies. Take the following precautions when handling the circuit
breaker:
WARNING
・ Take the following precautions before operating the circuit breaker using the manual handle:
(a) Verify that no voltage is applied to the main circuit.
(b) Turn off the control power in the operation cubicle.
(c) Discharge the making and breaking springs by opening/closing the circuit using the manual
buttons. Depress the manual buttons "OFF" and "ON" in this order. The respective
springs are discharged only when they have stored energy. Verify that the indicators show
"Discharged" and "CLOSED."
(d) Upon completion of the above spring discharging operation, return the control power in the
operation cubicle to the original state.
(e) At the end, be sure to verify that the marking line of the gear coupling outer ring matches that
of the inner ring. If they are not aligned, lift the gear coupling outer ring, rotate it to align the
marking lines, and return the outer ring to the original position.
CAUTION
0-1
Ratings and specifications
No Item Rating
1 Model CFPTB-120-40L, FAR3
(Incase of rated braking current 40kA)
2 Rated voltage (kV) 132
3 Rated current (A) 1500 / 2000
4 Rated frequency (Hz) 50 / 60
5 Rated breaking current (kA) 40
6 Rated making current (kAP) 100
7 Rated short-time withstand current (kA) 40
8 Rated opening time (s) 0.036
9 Rated breaking time (cycle) 3
10 Rated closing time (s) 0.1
11 Standard operating sequence O-0.3s-CO-3min-CO
12 Power-frequency withstand voltage (kV) 275
13 Lightning impulse withstand voltage (kV) 650
14 Rated closing operation voltage (V) DC 110
15 Rated closing control voltage (V) DC 110
16 Rated opening control voltage (V) DC 110
17 Rated closing control current (A) 5.0
18 Rated opening control current (A) 5.0
19 Rated SF6 gas pressure (bar) 6.0 bar・G (at 20°C)
20 SF6 gas mass (kg) Approx. 100
21 Total mass (kg) 4000
22 Applicable standard IEC 62271-100
23 Motor operating voltage (V) DC 110
24 Rated motor current (A) 15
25 Operation method Powered-spring operation
1-1
Construction and Operation Principle
2.2. Interrupter
The puffer type interrupter is housed in the grounded tank where SF6 gas at 0.6 MPa is sealed. In the
lower part of the tank, the link mechanism is also housed to operate the interrupter. (Figure 5.2)
WARNING
・ Open the front cover of the operating equipment part only when necessary. In particular, the link
mechanism instantaneously starts to operate during circuit breaker operation so that touching it is
very dangerous.
・ During work with the front cover of the operating equipment part opened, use great care to prevent
the cover from being opened/closed by a gust of window.
・ Do not touch the connection terminals in the operating equipment part, to which a voltage is
constantly applied to operate each device. Prior to work, always verify that the power supply is
securely cut off.
・ When you operate CB very frequently for testing purpose (more than 10 times with frequency once
3-minutes or more), open the front cover for radiation of motor.
The operating equipment uses the powered spring operation method for both making and tripping. The
making spring is immediately energized by the motor upon completion of the making operation. The
breaking spring is energized by the energy of the making spring at the same time as the making operation.
The operating equipment (Figure 5.5) contains the making spring (405), breaking spring (406), making hook
(420), tripping hook (423).
On the surface of the front cover are installed the "OPEN"/"CLOSED" indicator, making spring
"Charged"/"Discharged" indicator, operation counter, and the making button (436) and tripping button (435)
for manual operation.
2-1
Construction and Operation Principle
2-2
Construction and Operation Principle
WARNING
・ Discharging SF6 gas inside a closed room for servicing or other purposes would cause an oxygen
deficiency (with an oxygen concentration of no more than 18%). Therefore be sure to collect all such
gas in a gas handling equipment. Heavier than air, this gas may accumulate underground or in a pit.
Therefore ventilate the room well and measure its oxygen concentration.
・ If SF6 gas (which is active and harmful to the human body) is to be recovered after a ground fault or a
short, be sure to recover it in a gas handling equipment charged with adsorbent.
(1) (A) The various experiments conducted by the company on the toxicity of SF6 gas by using white
rabbits and mice reveal that SF6 gas is normally inactive and physiologically harmless, thus being
considered nontoxic. Regulations regarding toxicity tests require that test mice withstand a mixture
of 75% SF6 gas and 25% oxygen for 14 to 16 hours without adverse effect.
(B) Products of decomposition (such as HF, SF4, CuF2, and WF6) resulting from an arc discharge are
harmful. To minimize these products, Japan AE Power Systems keeps the water content of the
circuit breakers at no more than 150vol ppm (and the water content of the atmosphere at about
2,000vol ppm ) so that the products of decomposition can be adsorbed by adsorbents (active
alumina and synthetic zeolite). (Keep the water content of the GIS except GCB at no more than 500
vol ppm .)
After a large-current shutdown, the container in the tank is found to contain small quantities of
sulfides and fluorides. But no reports have so far been issued to indicate that these pulverized
substances caused any harm to the human body. However, just in case, workers are recommended
to wear masks and gloves in conducting a minute check or change contacts. It is also
recommended to change adsorbent cartridges when conducting any check.
(2) SF6 gas is about 5.5 times as heavy as air and colorless, odorless, and inactive. When handling it,
therefore, ventilate the room well and avoid as far as possible handling it in a closed room or pit. Should
much SF6 gas flow out, it might accumulate in the bottom layer, which might decline greatly in oxygen
content. Discharging much SF6 gas in a small room or poorly-ventilated place for servicing or other
purposes might cause an oxygen deficiency. Take enough care in handling it.
2-3
Construction and Operation Principle
2-4
Construction and Operation Principle
2-5
1. Tripping solenoid excited
2. Opening trigger lever released
423
402 3. Opening spring discharged
406 4. Circuit breaker opening
406 415
423
422
402 * Arrow mark in the diagram
indicates the direction of the
403 opening operation.
422 421
425
427
403
421
410
412
420
419
Produ Produ Produ Product Name
Product Name Product Name
ct No. ct No. ct No. (b) Open State
401 Closing electromagnetic 411 Reducing gear 421 Opening lever 404 (Closing spring: Charged,
solenoid Opening spring: Discharged)
402 Tripping electromagnetic 412 Motor control cam 422 Opening lever 1. Motor started
solenoid 405
2. Closing spring energized
403 Main lever 413 Closing link 423 Opening trigger lever 404
404 Cam 414 Closing spring bearing 424 Closing latch roller * Arrow mark in the diagram indicates
405 Closing sprig 415 Opening spring bearing 425 Opening latch roller the direction of the closing spring
406 Opening spring 416 Oil dash pot connecting link 426 Motor charging operation.
407 Main shaft 417 Oil dash pot connecting 427 Interrupter
hinge
426
408 Cam shaft 418 Cam roller 428
409 Oil dash pot connecting lever 419 Closing lever 429
410 Oil dash pot 420 Closing trigger lever 430
Operating Equipment Configuration
(c) Closing spring charging
(Closing spring: Discharged,
Fig. 2-3 Operation of operating equipment 411 Opening spring: Charged)
2-6
Construction and Operation Principle
2-7
406 415
423
402
403
422
425
421
410
412
401
413
420
419 414
424
404
418 411 408 407 409 416 417 405
2-8
Construction and Operation Principle
(Bottom View)
2-9
Construction and Operation Principle
(Bottom View)
2-10
Construction and Operation Principle
(at 20°C)
Item Pressure (MPa)
Rated pressure 0.6
Warming pressure 0.55
Locking pressure 0.5
2-12
Construction and Operation Principle
1. When installing this circuit breaker, fill with SF6 gas of a pressure (SF6 gas pressure in
the gas tank of the interrupter when the circuit breaker is filled with the SF6 gas) within
the range of 0.58 to 0.62 MPa when converted at 20 deg.C as shown by the shaded
portion in Figure 5.10. For temperature and pressure conversion, see Figure 5.10.
2. For gas temperature measurement, apply putty to the shaded side of the tank in the
interrupter and read the temperature of the putty.
2-13
Construction and Operation Principle
The SF6 gas pressure of gas tank is conducted into tubular measuring element, and the
element deforms in proportion to the pressure. The deformation transmits to transmission rod,
which is connected to both extreme point of tubular measuring element and pointer, and pointer
indicates gas pressure.
Along with transmission rod, a bimetal is installed, so that to indicate 20 °C converted pressure.
This pressure gauge is equipped with alarm contact which is linked with pointer. Once
pressure decline is occurred, the contact will emit low pressure alarm.
2-14
Installation
3. Installation
3.1. Installing the GCB Main Unit
CAUTION
・ Take the following precautions when installing the circuit breaker main unit:
(a) Pay due attention to the location of the ground terminal and the orientation of the operation
box.
(b) Accurately provide a level area.
(c) Verify that the foundation bolts are firmly tightened.
CAUTION
・ Take the following precautions when charging sulfur hexafluoride (SF6) gas:
(a) It is necessary to control the moisture in the SF6 gas of the circuit breaker to 150 ppm (by
volume) or less. Use care to prevent moisture from entering during charge of SF6 gas.
Verify that the locking contact of the gas density detector turns ON at a gas pressure of 0.5
MPa and the warning contact turns ON at 0.55 MPa.
(b) Check for gas leakage from the pipe joint part and flange packing part using the gas leak
detector.
Upon completion of initial inspection, fill the circuit breaker with the SF6 gas using the procedure in Figure 6.1
3-1
Installation
CAUTION
3-2
Test Run
4. Test Run
CAUTION
・ Be sure to conduct the following before starting the operation of the product:
(a) Verify that the product can be operated without any trouble by repeating the manual
opening/closing operation several times in accordance with the following description.
This circuit breaker is delivered with the interrupter in the open state, the closing and opening springs in the
discharged state. Verify the following conditions prior to start the test run:
(1) The "OPEN"/"CLOSED" indicator shows "CLOSED."
(2) The closing spring "Charged"/"Discharged" indicator shows "Discharged."
Verify that the circuit breaker can be operated without trouble by repeating the above operation several
times.
4-1
Test Run
CAUTION
・ This operation shall be performed only for maintenance purpose like stroke adjustment. DO NOT
operate when the main circuit is energized, since this operation cannot break the load current and
fault current.
4.2.2. Operation
CAUTION
・ The stroke is approx. 100mm. If you doubt that the hook mechanism does not operate completely,
stop manual handle rotation. Too much rotation may break the operating mechanism.
・ Check there is no gap between spring cover and spindle before press "OPEN" push button. If there
is a gap between them, operating mechanism may be broken.
<Closing Operation>
1. Turn manual handle clockwise and operate until opening trigger lever latches with "click sound", and
check the indicator shows "CLOSED".
2. Stop turning the manual handle immediately when opening trigger lever latches. If you doubt to miss
the sound, turn handle counterclockwise and repeat No.1 operation.
<Opening Operation>
1. Turn manual handle counterclockwise about 30mm and turn it clockwise until its edge touches to the
cover.
2. 2. Push "OPEN" push button and release the opening trigger lever.
3. Turn handle counterclockwise until the spring cover touches the holder. Check the indicator shows
"OPEN". If the indicator does not show "OPEN", repeat No.1 operation until the opening trigger lever
releases.
4.2.3. Operation
Perform the above installation method in the reversed order for restoration.
4-2
Test Run
4-3
Test Run
OPERATING BOX
CAUTION
NAMEPLATE
4-4
4.3. Dismounting operating mechanism
Connector for
t l
Rear view
(1) Remove front cover of operating box and (4) Open rear cover and remove cable connections
from connectors.
attach maintenance base.
Operating Mechanism
Gear coupling Clamp ring Mounting bolts
(5)
Mounting bolts
Roller for pull out the
h i
Pull out
Operating Mechanism
4-5
Maintenance Inspection
5. Maintenance Inspection
WARNING
(a) Maintenance inspection is classified according to the operating condition of the circuit breaker;
infrequent switching or frequent switching.
(b) The in-gas part is subject to constant gas pressure control and periodic disassembly inspection
once every 12 years or 2000 operation count.
(c) Regular inspection is conducted primarily by an operation check once every 6 years or 500
operation count.
(d) Detail inspection of the operation mechanism is carried out once every 12 years or 2000
operation count.
(e) Occasional inspection is carried out when trouble is recognized.
5-1
5.2. Maintenance Inspection Standard
For a maintenance inspection standard, see Table 8.1.
For the contact inspection, see Table 8.2.
5-2
Maintenance Inspection
CAUTION
・ Don’t use any lubricant other than specified below.
・ Don’t apply too much lubricant especially for inside of enclosure, since it may flow out and
contaminate insulation material.
・ Don’t apply solvent or thinner other than isopropyl alcohol especially for polymeric material, since it
may be deteriorated.
Dash pot:
“SHELL FLUID SPECIAL” oil
In-tank components
(in-gas components):
"Hitalubu #280" grease
Operating mechanism
(operating equipment components):
" Gleitmo 805K” grease
5-3
5.3. Maintenance Inspection Procedure
5.3.1. Daily Inspection
Visually check for abnormality with the circuit breaker being operated using the inspection procedure shown
in Table 8.3. In particular, use care for gas pressure.
Inspection Inspection
No. Description Criteria
Item Cycle
1 Gas Daily (1) Read the pressure value on the Within the specified
pressure pressure gauge and compare it with pressure range
gauge the normal pressure obtained from the
SF6 gas pressure/temperature
characteristic curves.
(2) When the gauge pressure is lower
than the normal pressure, supply SF6
gas prior to low pressure warning
using the charging/replenishing
procedure in Figure 6.1.
2 Operation Daily Check the operation count.
counter
3 Oil dash Daily Check for no oil leakage. No oil leakage
pot
4 General Daily (1) Noise, odor (1) Noise, odor
exterior (2) Overheat, discoloration (2) Overheat,
(3) Check for moisture leaks discoloration
(3) Check for moisture
leaks
5-4
Maintenance Inspection
WARNING
・ Take the following precautions for regular inspection:
(a) Be sure to turn off the power to the control circuit of the circuit breaker and to the motor circuit
prior to inspection.
(b) Be sure to discharge the making and breaking springs to secure safety prior to inspection except
for operating the circuit breaker. Verify that the making spring of the circuit breaker and the
indicator show "Discharged" and "CLOSED," respectively.Don’t use any lubricant other than
specified below.
Carry out the inspection without degassing during power failure. Prior to the inspection, conduct the
operation test to verify the characteristics. Use the regular inspection procedure in table below.
Classifi-
cation
No. Item Inspection Procedure Work/Test Procedure Tools
1 Tank 1. Check for loose bolts 1. Completely tighten the bolts. M20 spanner
in the tank connection 2. Apply repair paint. * Repair paint
part.
Interrupter
cover.
4 Dash pot 1. Check the oil level. JIS-C2320-2 insulating
oil
5 Auxiliary switch 1. Check the contact 1. Check the contact state from Tester
state. the terminals of the control
circuit terminal part.
6 Wiring 1. Check for loose bolts 1. Completely tighten the bolts M4, M5, and M6
in the terminal part. in the wiring connection part. spanners
Screwdrivers
5-5
Maintenance Inspection
Classifi-
cation
No. Item Inspection Procedure Work/Test Procedure Tools
7 Manual 1. Manually conduct test 1. Operate the making spring * Making spring
Measurement/Test
Switching Test
run according to charging handle to verify the charging handle
Section 7 in this making spring is energized.
manual. 2. Verify the indicator shows
"Charged."
3. Press the making button
(436) to verify the circuit
breaker is turned on and the
indicators show "OPEN" and
"Discharged," respectively.
4. Press the tripping button
(435) to very the circuit
breaker is tripped, the
indicator shows "CLOSED,"
and the operation counter is
incremented.
Powered 1. Conduct test run 1. Verify the motor rotates Test terminal
according to Section immediately after voltage is
5.5 in this manual. applied to the motor power
source, and the making
spring charging operation is
complete in 15 sec.
2. Verify (2) in Section 7.1 (test
run) of this manual.
3. Verify (3) in Section 7.1 (test
run) of this manual.
4. Verify the motor rotates
immediately after the
making operation is
complete, and the making
spring charging operation is
complete in 15 sec.
8 Transfer link 1. Measure all strokes 1. Verify each transfer link * Making spring
stroke of the transfer links. stroke is 98±2 mm by charging handle,
measurement manual ON/OFF scale
operation.
5-6
Maintenance Inspection
WARNING
・ Take the following precautions prior to detail inspection:
(b) Turn off the operation power and control power using the molded case circuit breaker (MCB) or
knife switch.
Operation test
Operation test
CAUTION
・Take the following precautions during the detail inspection:
(c) Upon completion of disassembly inspection, conduct the operation test and compare the test
result with the factory test data and pre-inspection test data.
5-7
Maintenance Inspection
5-8
Maintenance Inspection
WARNING
・Take the following precautions prior to detail inspection:
(a) Verify that no voltage is applied to the main circuit.
(b) Turn off the operation power using the MCB.
(c) Be sure to reduce the sulfur hexafluoride (SF6) gas pressure to "0 MPa."
(d) Prevent water or foreign material from entering the interrupter.
(e) Protect the flange and packing from any damage or foreign material.
(f) Do not disassemble the shaft seal.
(g) Do not disassemble the gas density detector.
(h) Be sure to create a vacuum prior to gas charging.
(i) Use only the grease specified.
(j) Upon completion of disassembly inspection, conduct the operation test and compare the test
result with the factory test data and pre-inspection test data.
(k) Be sure to blow air inside the tank prior to in-tank inspection.
Operation test
Operation test
5-9
Maintenance Inspection
Movable arcing Dismount the fixed arcing Remove the movable arcing
contact contact, and then visually contact through the
check the movable arcing inspection door using the
contact. If the contact face is moving jig.
uneven, make it flat using a Movable arcing contact 2 persons
fine file. Replace with new measurement position
one if abrasion increases the 3.5 hours
diameter by 0.5mm or more, (including SF6
lopsided abrasion or cavities on degassing,
the surface. Apply grease to vacuum, and
the contact face. (HitaLoop SF6 gas
#280) charging)
Insulated Clean both interior and exterior Remove including the
nozzle of the insulated nozzle using a movable arcing contact.
wiper. Replace with new one Nozzle measurement
if the nozzle diameter is position
increased by 1 mm or more.
5-10
Maintenance Inspection
5-11
Inspection/Test Result Recording Sheet
6-1
Inspection/Test Result Recording Sheet
1. Switching Test
1.1 Switching characteristics test
a) Closing operation test
Control Voltage (V) Making time (S) Contact difference (S)
6-2
Troubleshooting
7. Troubleshooting
Note on installation
Careful maintenance inspection will help to eliminate possibility of an accident during normal operation.
Use the following as the reference for abnormal phenomena.
7-1
Troubleshooting
7-2