How To Build A Railway Track? Rail Fasteners
Rail Fastening System
Feb 10, 2017 (/Rail-Fasteners-
System.Html)

Rail Clip (/Rail-Clip.Html)

Railroad Spike (/Railroad-


Spike.Html)

Rail Bolt (/Rail-Bolt.Html)

Rail Shoulders (/Rail-


Shoulders.Html)

Rail Anchor (/Rail-


Anchor.Html)

Rail Clamp (/Rail-


Clamp.Html)

Tie Plate (/Tie-Plate.Html)

Rail Pad (/Rail-Rubber-


Plate-And-Rail-Pad.Html)

Rail Nylon Insulator (/Rail-


Nylon-Insulator.Html)

Rail Plastic Dowel (/Rail-


Plastic-Dowel.Html)

As the most important part of railway track system, railway track plays a role in giving a Other Rail Fasteners
(/Other-Rail-
reliable surface for train to run. Railway track have other names like railroad track, track
Fasteners.Html)
and permanent way. Since the first track building in the 1825, railway track go through
Rail Track (/Rail-
several reforms. Ballasted track and ballastless track are typical types of railroad track. Track.Html)
In general, railway track consist of ballast bed, steel rail, railway sleeper, railway fish Railway Switch (/Railway-
plate (http://www.railway-fasteners.com/rail-joints.html) , rail clip Switch.Html)

(http://www.railway-fasteners.com/rail-clip.html), railroad tie plate Rail Joints (Fishplate)


(http://www.railway-fasteners.com/tie-plate.html) and other railway fasteners. How to Rail Joints (/Rail-
build a railway track with all these components? Here is the guide to introduce the Joints.Html)

process step by step. Fish Bolt (/Fish-Bolt.Html)

Insulated Rail Joint


(/Insulated-Rail-

Pre-construction activities Joint.Html)

Steel Rail (/steel-rail-and-


There are some preparative works before railway track construction. Among all the sleeper.html)

activities, subgrade drainage and materials preparation are common. Rail Sleeper
Wooden Sleeper
(/Wooden-Sleeper.Html)
The subgrade drainage is a system that is used to prevent he railway from water
logging. The subgrade, road bed and slope of railway track are very easy to be
washed by water. If the subgrade drainage measures are not proper, this will lead HOT SALE PRODUCTS
to the subgrade diseases. It is necessary to install drainage before laying the track.
Specifically, it mainly adopts drainage pipes, carrier drains and attenuation ponds
Rail Fastening System
in some area.

(/rail-fasteners-
system.html)

Rail Clip

The preparation of construction materials is another work before track laying.


Ordinary materials include railway sleepers, steel rail, rail fasteners and some
construction equipment. Preparation works primarily refer to check the
complement and integrity of all materials.
When all preparations are ready, next step is laying the bottom ballast.

Laying bottom ballast (/rail-clip.html)

Rail Joints
(/rail-joints.html)

Rail Track

Ballast bed is the dependable foundation for railway track. According to the construction
procedures, ballast bed construction is divided into two parts: bottom ballast and top
ballast. There are other procedures between bottom ballast and top ballast laying. So,
bottom ballast and top ballast will be separate to introduce.

Set the thickness of bottom ballast by the design. (/rail-track.html)


Track design for main track is double track. Bottom ballast is made up medium- PRODUCT BROCHURE
coarse sand.
Spread the railway sleepers. Put sleepers on the each side of railway track equably.
Laying railway sleeper on the track manually. Keep the central point of railway
sleeper and rail track centerline in alignment.
The bottom ballast is transported to the track and unloaded equably as planned.
The compaction is realized by manual spreading and mini road roller.

Anchorage

AGICO Rail
Like Page 837 likes

Be the first of your friends to like this

AGICO Rail
about 2 months ago

casting production line of AGICO


Rail.
http://www.railway-fasteners.com/
…/casting-production-line-…

Anchorage means the process that fix railroad spike to railway sleeper. This procedure
requires materials as follow: Sulphur, sand, cement, paraffin, screw spike. Learn more
specific process at how to fastener screw spike to railway sleeper (http://www.railway- RAILWAY-FASTENERS.COM

fasteners.com/news/how-to-fasten-railroad-spikes-to-railway-sleepers.html). Foundry Production Line …


AGICO Rail is a railroad fastener…

Laying steel rail

Steel rail laying mainly include rail apolegamy and track laying.

Rail apolegamy is a necessary process in the track laying. Measure the length of
each rail and rail apolegamy can be based on it. It is suitable to use rails with same
length deviation. What’s more, length deviation is less than 3mm, and cumulative
deviation is less than 15mm.
Rail laying start from the rear end of turnout. The length of non-standard rails can
be determined by the location of insulation joints. Convey steel rails by the
monorail vehicle, then lift them to rail ditch manually.
When steel rails are placed, connect them and railway sleepers by the rail fastening
system and rail components like rail joint.

Top ballast

Top ballast laying means laying ballast on the track and renovate the track to expect
result. Top ballast lying has a certain order: transport ballast- spread ballast-track
lifting- track lining- filling ballast- tamping- finishing track bed.

The first top ballast laying


Spread ballast to the track.
Track lifting. Lifting each rail up to right place and padded with ballast. Maintain
every point of steel rail at same level.
Track lining. Switch road to the centerline, make straight line and curve smooth.
Tamping. Once the top ballast is ready, the tamping machine starts to work. The
tamping is continues tree or four times.
Filling ballast. Filling crib with ballast.

The second top ballast laying


The second top ballast laying start after some trains pass. Compared to the first top
ballast laying, most procedures are same except renovate track.

Rail anchor and rail brace

Rail anchor (http://www.railway-fasteners.com/rail-anchor.html) is used to prevent


track from crawling. Rail brace is connected with steel rail through rail bolt and nuts.
Both rail anchor and rail brace are designed to keep steel rail in place and ensure the rail
safety.

You may also like:

More about Crane Rail Fastening System (/news/about-crane-rail-fastening-


system.html)
What Is Crane Rail? (/news/what-is-crane-rail.html)
Chinese Steel Rails Overview (/news/steel-rails-overview.html)
Comparison of Ballasted Track and Non-Ballasted Track (/news/ballasted-track-
non-ballasted-track-comparison.html)
A guide to railroad track (/news/railway-track-parts.html)

GET IN TOUCH

Your Name

Email
I`m interested in this product, send me the price.

GET THE LATEST PRICE NOW!

CATEGORIES AGICO RAIL USEFUL LINKS CALL US NOW

Rail Fastener Home (Http://Www.Railway- Hot-Sale Railway Fish Plate Direct Line:
Fasteners.Com) (/News/Hot-Sale-Railway-Fish-
Rail Fastening System (/Rail- +86 372 5081 703 (tel:+86
About Us (/About-Agico-Rail.Html) Plates.Html)
Fasteners-System.Html)
Rail Tracks For Sale (/News/Buy- 372 5081 703)
Rail Clip (/Rail-Clip.Html) Projects (/Railway-Projects/)
Rail-Track.Html)
Railroad Spike (/Railroad- Posts (/News/)
AREMA Standard Rail Products Email:
Spike.Html) Contact (/Contact-Us.Html)
(/News/American-Standard-
Rail Bolt (/Rail-Bolt.Html) Privacy Policy (/Privacy- Railway-Products-Overview.Html) info@railway-fasteners.com
Rail Shoulders (/Rail- Policy.Html) (mailto:info@railway-
Where To Buy Railroad Spike
Shoulders.Html) Wind Turbine Tower (/News/Where-To-Find-Railroad- fasteners.com)
Rail Anchor (/Rail-Anchor.Html) (Http://Www.Steelwindtower.Com) Spikes.Html)
Rail Clamp (/Rail-Clamp.Html) Track Bolts And Nuts For Sale
Rail Joint (News/Track-Bolts-And-Nuts-For- Address
Tie Plate (/Tie-Plate.Html)
Rail Joints (/Rail-Joints.Html) Sale.Html) Room 705, Building 2, Huaqiang
Rail Pad (/Rail-Rubber-Plate-And-
Rail-Pad.Html) Fish Bolt (/Fish-Bolt.Html) Compromise Joint Bars For Sale New Times, Xian'ge Avenue, Hi-
(News/Compromise-Joint-Bars-
Rail Nylon Insulator (/Rail-Nylon- Insulated Rail Joint (/Insulated- Tech Industry Development Zone,
For-Sale.Html)
Insulator.Html) Rail-Joint.Html)
Rail Products (/Rail-Products.Html) Anyang, Henan, China
Rail Plastic Dowel (/Rail-Plastic-
Dowel.Html)
Other Rail Fasteners (/Other-Rail-
Fasteners.Html)
Rail Track (/Rail-Track.Html)
Railway Switch (/Railway-
Switch.Html)

Вам также может понравиться