PRODUCT DATA SHEET

STOPAQ® PASTE CZH


®
Product properties Stopaq Paste CZH
Product Information Colour Green
Density 1.4 – 1.6 g/cm³
®
Product description: Stopaq Paste CZH is a low temperature, cold- Temperature Operational temperatures: - 45°C to + 70°C
applied, non-crosslinked, non-crystalline, monolithic viscous polymer ranges Substrate temperature
based moulding paste with cold flow, self-healing, and visco-elastic during application: - 30°C to + 70°C
properties. Stopaq® Paste CZH is a corrosion preventing, non-toxic Water absorption < 0.03% (ASTM D570)
mouldable material adhering extremely well to steel and factory applied Glass transition ≤ - 65°C (ISO 21809-3/A1)
pipeline coatings like PE, PP and FBE. Stopaq® Paste CZH is viscous at temperature
the indicated operating temperatures and, due to its liquid nature, flows Specific electrical > 108Ω.m² (ISO 21809-3/A1)
into all irregularities of the substrate. The compound does not cure and insulation
is unable to build up internal stress. Stopaq® Paste CZH is fully resistance
resistant to water and has a very low gas- and water vapour
Adhesion test Tested @+23°C and +70°C (ISO 21809-3/A1)
permeability.
on steel (Sa 2½, St 2 and St 3) and plant
coatings (PP, PE and FBE). Results on all
Stopaq® Paste CZH requires an additional flexible mechanical protective
substrates:
layer like Stopaq® Outerwrap. Optionally a rigid mechanical protective
 Cohesive failure, no evidence of adhesive
layer can be applied on top like Stopaq® Polyester or Stopaq®
failure
Outerglass Shield. Stopaq® Outerwrap improves impact and indentation
resistance of the coating system and supports the self-healing ability of  ≥ 99% coverage of surface
small damages like dents and cuts.  ≥ 0.6 mm residual thickness
Thermal ageing Ageing 100 days@+90°C (ISO 21809-3/A1), dry
Features: resistance and hot and hot water immersion: Results of adhesion
 Controlled cold flow providing permanent inflow into the finest pores of water immersion test are identical to results obtained with non-
the substrate. aged material.
 Conforms to irregular shapes Salt spray Tested 720 h, 5% NaCl @ + 85°C (ASTM B117):
resistance No corrosion detected
 Low surface tension; adheres on many types of dry substrates at a
molecular level Note: ISO 21809-3/A1 = ISO 21809-3:2008/Amendment 1:2011
 Surface tolerant: no blasting techniques required, wire brushing is
sufficient (ISO 8501-1: St 2) General order information
 Adhesion based on vanderWaals forces Product: Stopaq® Paste CZH is available in sheets,
 Inert to ageing and weathering packed in siliconized foil in cardboard boxes
 Resistant to many chemicals like water, salts, acids, alkalis, polar Art. Nr. Packing size
solvents, etc. For additional information, please consult Stopaq b.v. 6140 Sheet 2kg, 6 pcs./box, 288 pcs./pallet
Handling Handle with care. Keep boxes upright
Benefits: Storage Store in a cool, dry and clean place, away from
 Environmentally friendly, no health and safety hazards to humans direct sunlight and below +45°C.
 Fast and easy to apply Unlimited shelf life.
 Easy to control application
 Can be moulded onto various types of irregular shaped objects
 No osmosis or underfilm migration of moisture
 No cathodic disbondment
 Cathodic Protection (CP) of steel structures is not affected
 Guaranteed performance

Application examples

Flanges: For protection against external corrosion and shaping of


connection flanges, insulation flanges and blind flanges.
Valves: For protection against external corrosion and shaping of valves.
Irregular shaped parts: For protection against external corrosion and
shaping of manhole covers, bolts & nuts, etc.
Cad-welds: For protection against external corrosion of welded CP-wire
connections on underground pipelines (Pin-brazes) and underground
steel structures protected by CP.
Pipe coating repairs: For protection against external corrosion and as
filler for pipeline coating defects of e.g. 3LPE coated pipelines, prior to
application of consecutive mechanical protective coating.

Ver. 5 / 20120406 (EN) Page 1 / 2


®
PRODUCT DATA SHEET STOPAQ PASTE CZH

Application instruction: Preparation Application instruction: Quality control


Tools, equipment  Temperature probe, Dew point tester, High Visual inspection The appearance of Stopaq® Paste CZH must
and auxiliaries voltage holiday tester look smooth and tight and should cover all
 Scissors, Knife, Putty knife, Measuring tape details with a thickness of at least 20 mm.
 Abrading pads, Wire brushes Holiday detection Immediately after application of Stopaq® Paste
 Isopropyl alcohol, cas. nr. 67-63-0 CZH, a holiday test should be carried out with a
 Heating blanket High voltage holiday tester at ≥15 kV. A brush
 Protective gloves probe is recommended. No further testing is
 Personal protective gear required.
Additional Depending on type of application, various
materials additional materials might be needed: Application instruction: Mechanical protection
 Stopaq® Wrappingband CZH Mechanical Once applied, Stopaq® Paste CZH should be
 Stopaq® Outerwrap PVC / PE / HTPP protection protected against impacts, indentations, soil
 Stopaq® Polyester pressure and other influences by wraps of
 Stopaq® Outerglass Shield Stopaq® Outerwrap, eventually followed by
High humidity Stopaq® Paste CZH can be applied in a humid Stopaq® Polyester or Stopaq® Outerglass Shield.
atmosphere. The substrate should be free from Mechanical protection should overlap the
condensing water which can be reached by boundaries of applied Paste CZH.
keeping the temperature at least 3°C above dew
point. Bringing into service
Work area and The substrate surface should be dry, clean and Exposure to loads Objects coated with Stopaq® Paste CZH should
substrate protected against negative weather influences. not be exposed to loads from supports- or lifting
Product conditions Stopaq® Paste CZH should be dry and the equipment.
temperature should be above +35°C for the ease Immersion or Immersion or burying is possible immediately
of application. To achieve this, the sheets can be burying after completion of the coating application.
heated with the heating blanket. Backfill and compact with clean sand and filling
material without sharp stones or hard lumps of
Application instruction: Surface preparation soil.
General The area to be coated has to be clean, dry, and
free from oil, grease and dust. All contamination
®
including mill-scale has to be removed. Stopaq information and warranty
Degreasing Degrease surfaces with isopropyl alcohol Documentation Extensive information is available on our web-
Salts and bacteria No need for additional cleaning. site. Application instructions, “Stopaq® Technical
Condensation of Prior to and during the application, the Standard” and other documentation can be
water temperature of the substrate(s) must be at least obtained from our head office, from our local
3°C above the dew point. distributor or by email to info@stopaq.com
Substrate Temperature of the substrate should preferably Certified staff The application of Stopaq® coating systems
temperature between +20 and +40°C. Preheating may be should always be carried out by certified
required. personnel.
Steel Minimum requirement for surface preparation is Stopaq ® Extensive laboratory tests and more than 10
St-2 according to ISO 8501-1. Roughness profile performance years of service in extreme wet and chemical
is not essential for adhesion. aggressive environments have proven that
Bitumen Remove loose bitumen. For proper adhesion, corrosion, bacterial growth or stress corrosion
make sure that the surface is clean and dry. cracking cannot develop on substrates coated
Heating up the surface to +60ºC may be with Stopaq® coating systems.
required. Avoid recoating of moist bitumen parts. Long term Stopaq® offers a 30 year guarantee on the
Other substrates De-gloss and degrease the surfaces by using an guarantee material properties of the Stopaq® Paste
abrasive pad and isopropyl alcohol. materials as described in this document.
Final control The substrates prepared for coating, should be
clean, dry and free of dust according to ISO
8502-3, grade 3.

Application instruction: Brief version


Boundaries in Apply wraps of Stopaq® Wrappingband CZH
flange application onto the pipe sections underneath and beyond STOPAQ B.V.
the planned boundaries of Stopaq® Paste CZH. Gasselterstraat 20
Application Apply lumps of mouldable paste around the 9503 JB Stadskanaal
shaped objects. Press the paste. Avoid air P.O. Box 285
9500 AG Stadskanaal
entrapment. After shaping, the surface should be
The Netherlands
smooth to enable proper application of additional T: +31 (0) 599 696 170
materials. F: +31 (0) 599 696 177
Reinforcement In case the layer thickness of Stopaq® Paste E: info@stopaq.com
CZH exceeds 20mm, it is recommended to apply I: www.stopaq.com
a reinforcement interlayer web for stabilization of
the moulded paste layer.

DISCLAIMER: To the best of our knowledge, the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. User must contact Stopaq
B.V. to verify correctness before specifying and ordering. No guarantee of accuracy is given or implied. We do not accept any responsibility for coverage, performance or injuries resulting from use.
Liability, if any, is replacement of products. No other warranty or guarantee of any kind is made by Stopaq B.V., express or implied, statutory, by operation of law, or otherwise, including merchantability
and fitness for a particular purpose. Stopaq® is a registered trademark of Stopaq B.V.

Ver. 5 / 20120406 (EN) Page 2 / 2


PRODUCT DATA SHEET

STOPAQ® OUTERWRAP PVC


®
Product properties of Stopaq Outerwrap PVC
Product Information Colours Black or White, both with matt finish and embossed
Stopaq® logo.
®
Product description: Stopaq Outerwrap PVC is a UV-resistant, Thickness Backing: 0.45mm ± 0.045mm
flexible polyvinyl chloride tape, coated with a modified pressure sensitive Total: 0.5mm ± 0.055mm
rubber resin adhesive. Stopaq® Outerwrap PVC is used for the Temperatures Service: - 45 ºC to +70ºC
mechanical protection of corrosion preventing coating systems such as Short term max.: +90 ºC
Stopaq® Wrappingband CZ and CZH. It is well suited for above ground, Peel strength layer Peel strength without heat ageing (P0) *)
underground and submerged applications. The heavy-duty adhesive to layer  @ +23 ºC: ≥ 0.4 N/mm
layer provides good adhesion to the outer surface of the Stopaq®  @ +70 ºC: ≥ 0.04 N/mm
Wrappingband as well as to its own backing. The Outerwrap has good
resistance to impacts, indentations and abrasion, and is also resistant to After thermal ageing for 100 days @ +90 ºC *)
chemicals like alkalis and acids.  P100 / P0 ≥ 0.7
Peel strength to Peel strength without heat ageing (P0) *)
backing of Stopaq®  @ +23 ºC: ≥ 0.4 N/mm
Features:
Wrappingband CZH  @ +70 ºC: ≥ 0.04 N/mm
 Easy to apply
 Cold applied After thermal ageing for 100 days @ +90 ºC *)
 Flexible, good conformability  @ +23 ºC: P100 / P0 ≥ 0.7
 Good adhesion to Stopaq® Wrappingband as well as to its own Elongation at break Elongation without heat ageing (E0)
backing  @ +23 ºC: ≥ 200%
 Excellent impact resistance
 Wide service temperature range After thermal ageing for 100 days @ +90 ºC *)
 @ +23 ºC: E100 / E0 ≥ 0.75
 REACH compliant, does not contain Substances of Very High ®
Concern (SVHC). Properties of coating system comprising Stopaq
®
Wrappingband CZH and Stopaq Outerwrap PVC
Benefits: Total thickness 2.8 – 3.2 mm
 Very well suited for manual application Self-healing test Self-healing of an artificial defect of Ø 6 mm:
 Easy to stretch and to apply  @ -45 ºC: no holiday (≤ 3 months)
 @ +23 ºC: no holiday (≤ 24 hr.)
 Excellent mechanical protection of Stopaq® corrosion prevention
 @ +70 ºC: no holiday (≤ 24 hr.)
products
Impact resistance Tested at 15 J and @ +23 ºC *)
 Resists impacts and indentations which may occur during installation  no holidays
and backfilling Indentation Tested at 10 N/mm² *)
 Supports self-healing of completed coating system resistance  @ +23 ºC: no holiday, residual coating thickness
 Very high resistance to ageing, even when exposed to maximum or ≥ 0.6 mm
minimum temperature for longer periods of time  @ +70 ºC: no holiday, residual coating thickness
 No curing or waiting time, ready for immediate service ≥ 0.6 mm
Cathodic After 28 days *)
disbondment  @ +23 ºC: disbondment 0 mm, no holiday
Application examples resistance  @ +70 ºC: disbondment 0 mm, no holiday
In all cases self-healing completed within 24 hr.
Pipes and Vessels: Mechanical protection of Stopaq® corrosion *) According to ISO 21809-3 Amendment 1 (2011)
preventing coating systems applied on carbon steel pipeline structures
and reservoirs. General order information
Product Stopaq® Outerwrap PVC is available in rolls,
®
Field joints: Mechanical protection of Stopaq corrosion preventing wound on cardboard cores, packed in cardboard
coating systems applied on carbon steel girth-weld joints of on-shore boxes:
pipelines. Art. Nr.: Product dimensions (W x L) and contents:
Black – 1120: 50mm x 10m: 60 pcs/box;1800 pcs/pallet
Pipe fittings: Mechanical protection of Stopaq® corrosion preventing 1122: 50mm x 30m: 18 pcs/box; 630 pcs/pallet
coating systems applied on carbon steel pipe fittings like elbows, bends, 1121: 75mm x 30m: 12 pcs/box; 420 pcs/pallet
tees, reducers and flanges. 1125: 100mm x 30m: 12 pcs/box;336 pcs/pallet
1126: 150mm x 30m: 6 pcs/box; 210 pcs/pallet
1124: 400mm x 40m: 4 pcs/box; 72 pcs/pallet

White – 1164: 50mm x 30m: 18 pcs/box; 630 pcs/pallet


1165: 75mm x 30m: 12 pcs/box; 420 pcs/pallet
1166: 100mm x 30m: 12 pcs/box; 336 pcs/pallet
1167: 150mm x 30m: 6 pcs/box; 210 pcs/pallet
Handling Handle with care. Keep boxes upright.
Storage Store indoor, clean and dry, away from direct
sunlight in a cool place below +40°C.

V 9 / 20151005 (EN) Page 1 / 2


®
PRODUCT DATA SHEET STOPAQ OUTERWRAP PVC

Application instruction - Job preparation Example - After application of the circumferential wraps,
Tools, equipment Scissors, knife and measuring tape Pipe wrapping consecutive spiral wraps should have an overlap
and auxiliaries (continued) of ≥ 50%.
Additional coating Stopaq® Outerwrap PVC is applied on Stopaq® Avoid air inclusions. Avoid tenting and bridging
materials corrosion preventing coating materials, such as: Continue spiral wrapping until reaching the
 Stopaq® Wrappingband CZ or CZH boundary of the area to be coated, leaving 3 mm
 Stopaq® Paste CZ or CZH of the previously applied Stopaq® Wrappingband
Optionally, additional mechanical protective visible at the boundary.
materials may be applied over the Outerwrap,
e.g.: When more than one roll of Outerwrap PVC is
 Stopaq® Polyester needed to continue wrapping, an overlap on the
 Stopaq® Outerglass Shield XT end of the previously applied Outerwrap PVC
High humidity Stopaq® Outerwrap PVC can be applied in a should be created of at least 100 mm.
humid atmosphere. The substrate should be End wrapping with two full circumferential wraps
free from condensing water which can be perpendicular to the pipe. End with a quarter
reached by keeping the temperature at least 3°C circumferential wrap of Outerwrap PVC without
above dew point. tension. In case of wrapping on horizontal pipes,
Work area and The substrate should be dry, clean and the tape end should face downwards ending at 3
substrate protected against negative weather influences. o’clock position. Cut off in a tie-form.
Temperature of the substrate should preferably The applied Outerwrap PVC must look smooth
be between +10°C and +70°C. and tight and should be shaped around all
Product conditions Stopaq® Outerwrap PVC should be dry and the details and into corners..
temperature should preferably be between
+10°C and +30°C for the ease of application.
Handling and commissioning
Exposure to loads Objects coated with Stopaq® PVC should not be
Application instruction - Brief version exposed to loads e.g. from supports- or lifting
General Specific application instructions are available at equipment.
Seal For Life Industries, e.g. for wrapping of Immersion or Immersion or burying is possible immediately
pipes, field joints, fittings, etc. burying after completion of the coating application.
Example - Horizontal pipelines should be spirally wrapped Consult data sheets for specific instructions of
Pipe wrapping from left-to-right or from right-to-left. Pipelines additional materials used. Backfill and compact
positioned with an angle deviating from with clean sand and filling material without sharp
horizontal should be wrapped from bottom to top stones or hard lumps of soil.
(e.g. risers).
In general Stopaq® Outerwrap PVC should be Information
applied with tension by gently pulling the roll of Documentation Extensive information is available on our web-
material, unless stated otherwise in specific site. Application instructions and other
application instructions. documentation can be obtained by contacting
Start wrapping Outerwrap PVC with two full our head office, from our local distributor or by
circumferential wraps perpendicular to the pipe, sending email to info@stopaq.com
leaving 3 mm of the previously applied Stopaq® Certified staff Application of the described coating system
Wrappingband visible at the boundary. should be carried out by certified personnel.

Seal For Life Industries LLC Seal For Life Industries Mexico Seal For Life Industries Seal For Life Industries BVBA Seal For Life India Private Ltd.
Franklin, MA, USA S de R.L. de C.V. Stopaq B.V. Westerlo, Belgium Baroda, India
Tel: +1 508 918 1600 Tijuana, Mexico Stadskanaal, the Netherlands Tel: +32 14 722 500 Tel: +91 2667 264 721
Toll Free: +1 800 248 7659 Tel USA: +1 858 633 9797 Tel: +31 599 696 170 Fax: +32 14 722 570 Fax: +91 2667 264 724
Fax:+1 508 918 1905 Fax USA: +1 858 633 9740 Fax: +31 599 696 177 belgium@sealforlife.com india@sealforlife.com
franklin@sealforlife.com Tel Mx: +52 664 647 4397 info@sealforlife.com
Fax Mx: +52 664 607 9105
mexico@sealforlife.com

Anodeflex® - Stopaq® - Polyken® - Covalence® - Powercrete® - Sealtaq® - Blockr® - Easy.Qote® - SynergyQ®


DISCLAIMER: Seal For Life Industries warrants that the product(s) represented within conform(s) to its/their chemical and physical description and is appropriate for the use as stated on the respective technical data sheet when used in
compliance with Seal For Life Industries written instructions. Since many installation factors are beyond the control of Seal For Life Industries, the user is obligated to determine the suitability of the products for the intended use and assume all
risks and liabilities in connection herewith. Seal For Life Industries liability is stated in the standard terms and conditions of sale. Seal For Life Industries makes no other warranty either expressed or implied. All information contained in the
respective technical data sheet(s) should be used as a guide and is subject to change without notice. This document supersedes all previous revisions. Please see revision date on the left. Stopaq® is a registered trademark of Seal For Life
Industries.

V 9 / 20151005 (EN) Page 2 / 2


(FOTO) (FOTO)

1 2

(FOTO) (FOTO)

3 4

(FOTO) (FOTO)

5 6
(FOTO) (FOTO)

7 8

(FOTO) (FOTO)

9 10

(FOTO) (FOTO)

11 12
(FOTO) (FOTO)

13 14

(FOTO) (FOTO)

15 16

(FOTO) (FOTO)

17 18
Year Country Client Contractor Project name Description Stopaq system Reason; new or existing infra Location
2000 USA Valero refinery - Coating of fieldjoints on 24" pipeline Stopaq CZH / Outerwrap PVC New pipeline Onshore
2001 Saudi Arabia Saudi Aramco Al Hajri & Al Bargash - Rehabilitation of 16"-56" pipelines, 40 km/yr Stopaq CZH / Outerwrap PVC/Polyester Existing Onshore

2001 The Netherlands Gasunie A. Hak Ravenstein pipeline Fieldjoint coating on 36" 80bar pipeline Stopaq CZH / Outerwrap PVC New pipeline Onshore
2001 The Netherlands Shell/Total/BP A. Hak, Visser & Smit From 2001 to 20004 different small Stopaq CZH / Outerwrap PVC New pipeline Onshore
pipelines,risers and fittings at fuelstations
2002 Belgium Exxon Flour Daniel - Wrapping of 12" pipeline sections Stopaq CZH / Outerwrap PVC Existing Onshore
2002 USA City of Houston Corrpro - Wrapping of underground installations, pipes, Stopaq CZH / Outerwrap PVC Existing Onshore
fittings, valves
2002 Saudi Arabia Saudi Aramco Al Robaya Qurayya Seawater injection From 2002 to 2004 wrapping of a 56" pipeline Stopaq CZH / Outerwrap PVC New pipeline Onshore

2002 The Netherlands Essent A.Hak, Bruins, Visser & Smit - 2002 - ongoing, New pipelines & general Stopaq CZH / Outerwrap PVC New pipelines & rehabilitation Onshore
Hanab maintenance of pipes, bends, valves, fittings
etc.
2002 Saudi Arabia Saudi Aramco Al Robaya Qurayah - Northern Area Producing 2002 - 2004 rehabilitation of 56" main Stopaq CZH / Outerwrap PVC Existing Onshore
waterline >206Km
2003 Saudi Arabia Saudi Aramco - QU1 & QU2 Sabkha From 2003 and ongoing to date, 40" pipeline Stopaq CZH / Outerwrap PVC Existing Onshore
rehabilitation, 30Km/yr
2003 USA shell Shell USA Wilmington - Wrapping of 32" pipeline sections and Stopaq CZH / Outerwrap PVC Existing Onshore
fieldjoints
2003 Belgium BASF vanden Heuvel Chemical plant From 2003 to 2007 the coating of Stopaq CZH / Outerwrap PVC / FN 4100 Existing Onshore
underground objects / Polyester
2003 USA Boston City Bechtel Big Dig Tunnel Project Protection of underground installation Stopaq CZH / Outerwrap PVC / FN 2100 New construction Onshore

2003 Saudi Arabia Saudi Aramco - Khurasanya Wrapping of new plant piping and off-plot Stopaq CZH / Outerwrap PVC New pipeline Onshore
piping >500Km
2003 France Gaz de France Road crossing Stopaq casing filler Onshore
2003 Gulf of Mexico Shell Protection of flanges at the flange faces Stopaq FN4200 / Flange Filler Offshore
2003 The Netherlands Akzo Nobel Pipelines, roadcrossings Stopaq wrappingband CZH / Stopaq Existing Onshore
FN2100
2004 Canada Exxon Mobil High temperature risers, offshore platforms EZ wrap / composite system Existing Offshore

2004 The Netherlands Nerefco refinery Hertel - Wrapping of 24" pipeline section and Stopaq CZH / Outerwrap PVC Existing Onshore
fieldjoints
2004 Belgium Fluxys Flanges Stopaq FN4100 / Stopaq Paste CZ Existing Onshore
2005 The Netherlands Gasunie Frycap - Wrapping of fieldjoints & bend sections of 40" Stopaq CZH / Outerwrap PVC New construction Onshore
pipeline. And 3 compressorstations GasUnie

2005 Russia Sakhalin Energy Startstroi/Saipem SA Sak.2 Coating of Fieldjoints & tie-in's of 34" pipeline Stopaq CZH / Outerwrap PVC / Casing New construction Ofshore
filler
2005 Saudi Arabia Royal commission Al Quarni - Coating of parallel pipelines 16-46" Stopaq CZH / Outerwrap PVC Existing Onshore
Jubail & Yanbu
2005 The Netherlands Eneco Electrical Pipelines, roadcrossings, wall inlets Stopaq wrappingband CZH / Stopaq Existing Onshore
company FN2100
2005 Oman PDO Oman GPS Murayrat Wadi Jizzi Gas Pipeline Rehabilitation of 16" gas pipeline stopaq CZH / Vinylester Existing Onshore

2005 Thailand Chevron Flange preservation Stopaq FN4200 Existing Onshore


2005 Saudi Arabia Saudi Aramco - Khurais Wrapping of new plant piping and off-plot Stopaq CZH / Outerwrap PVC New pipeline Onshore
piping >500Km
2005 USA Shell Rehabilitate existing buried coating in Stopaq wrappingband CZH Existing Onshore
California
2005 The Netherlands Gasunie Zeetech bv Bacton-Balgzand Coating of underground piping of compressor Stopaq CZH / Outerwrap PVC New pipeline Onshore
station
2006 Belgium Wintershall Subsea 7 - Coating of fieldjoints of 24" pipeline Stopaq CZH / Polyester New pipeline Offshore
2006 The Netherlands Gasunie Visser & Smit Hanab Julianadorp-Callantsoog Coating of fieldjoints of 48" -80bar- PU Stopaq CZH / Outerwrap PVC New pipeline Onshore
insulated pipeline
2006 The Netherlands Nuon nv A.Hak Gas storage EPE Coating of underground objects, risers, fittings, Stopaq CZH / Outerwrap PVC / FN4100 / New construction Onshore
pipes & fieldjoints FN 4200
2006 Oman PDO Oman Al Turki PO Birba 9 gas flowline Linepipecoating & fieldjoints Stopaq CZH / Outerwrap PVC New pipeline Onshore
2006 USA ARC-Chevron/Shell CBI 32" jetty piles. Splash zone to head stock Subsea Existing Offshore
protection
2006 Thailand PTT Thailand 8km of 22" pipeline - Field Joints Wrappingband CZH/Outerwrap New pipeline Onshore
2006 Russia Shell Saipem Molikpaq 25.000 liter filling of J-tube after installation Stopaq J-tube filler Casing filler Offshore
failure
2006 Italy ATC Foster Wheeler All transmission lines, Field Joints New pipeline Onshore
2006 Oman PDO Oman GPS Budour pipeline 10 6" full wrap Wrappingband CZH/Outerwrap New pipeline Onshore
2006 Malaysia Fuel Pipeline Chor Kan Chang 14"underground pipeline. Pipe sections and Existing Onshore
Company field joints
2007 Brunei Brunei LNG In-house Entire pipeline protection DN150, 200 & 300 Underground New construction Onshore
firewater pipeline
2007 Brunei Brunei LNG In-house Various Ground to air interfaces & above Wrappingband CZH/Outerwrap Existing Onshore
ground flanges
2007 Sudan GNPOC CPP Replacement of HSS after failure Stopaq CZHT / Vinylester Fieldjoint coating Onshore
2007 Thailand JST Thailand Laem Chabang Terminal 30"jetty piles Wrappingband CZH/Outerwrap
2007 Thailand RAPP Pulp and JST Various small pipelines in highly concentrated Wrappingband CZH/Outerwrap Existing Onshore
paper Mill sulphuric acidic environment

2007 Norway Exxon Mobil KCA Deautag Ringhorne Drilling module, valves and flanges Existing Onshore
2007 Norway StatoilHydro D&F Group Statfjord B Platform legs, tank top Subsea Existing Offshore
2007 Norway StatoilHydro BIS Industrier Sleipner Process module, valves and flanges Existing Onshore
2007 Norway Total Aker Offshore partner Frigg Platform legs Subsea Existing Offshore
2008 Libya Wintershall Wintershall - Coating of wellheads Stopqa CZH / PVC Existing Onshore
2008 The Netherlands MOT - Pilot project Jetty Pile protection Case stude Jetty Pile rehab system Stopaq Subsea System Existing Offshore

2008 France Gaz de France GRT Gas 60 meter casing, 56" Stopaq casing filler Existing Onshore
2008 Sudan GNPOC Field Joint Rehabilitation & new Onshore
construction
2008 Azerbeidzjan BP MST WREP Rehabilitation of 24" pipeline Stopaq CZH / Outerwrap PVC Existing Onshore
2008 Nigeria TOTAL Saipem AKPO project Coating of Risers STOPAQ CZHT / CZHT Paste / Outerglass New and Old risers Offshore
Shield XT
2008 Thailand HESS JST Underground 16" pipeline repair. Tank - chime FN4200, CZH wrappingband, polyester New construction Onshore
and wall protection
2008 Norway Exxon Mobil 100 flanges FN4200 Wrappingband outerwrap Existing Onshore
2009 China Petrochina CPP Moda Pipeline Fieldjoint coating and insulation on 900km, Stopaq CZH / High Impact Shield and Fieldjoint coating Onshore
30", 80833 fieldjoints of insulated gas pipeline insulation

2009 Saudi Arabia SWCC Femco / Mapa 100km 60" pipeline rehabilitation Stopaq CZH / Outerwrap PVC Existing Onshore
2009 The Netherlands MOT Ballast Nedam Jetty pile project Rotterdam Rehabilitation of 132, 36" Jetty piles Stopaq Subsea System Existing Offshore
harbour
2009 Kroatia Janaf Janaf - T-jonts / elbows Stopaq CZH / PVC New piping for tank farm Onshore
2009 The Netherlands Gasunie A.HAK / NACAP / VisserSmit North-South gaspipeline 2009 - 2010 22.500 fieldjoints 48" Stopaq CZH / High Impact Shield Fieldjoint coating Onshore
Hanab / Schelde

2009 Australia Jemena Waterpipeline 2009 - 2010 Rehabilitation of waterpipeline Stopaq CZH / Outerwrap PVC Existing Onshore

2009 Sudan PetroEnergy CPP - Fieldjoint coating on 10,000 fieldjoints of gas


pipeline
2010 Saudi Arabia Saudi Aramco J Ray McDermott Karan project Protection of 10.000 fieldjoints Stopaq CZH / Outerwrap PVC / High New pipeline Offshore
Impact Shield
2010 Sudan GNPOC CPP Replacement of HSS after failure Outerglass shield HT / Stopaq CZH / Fieldjoint coating Onshore
Outerglass shield XT
2010 Kroatia Crodux Orometal - LNG storage tank coating (4,5*37mtr) Stopaq CZH / PVC New storage tanks Onshore
2010 The Netherlands Wintershall Wintershall K13 Offshore platform Coating of braces of K13 platform Stopaq Subsea System / Stopaq CZH / Replacement of braces Offshore
PVC / Outerglass Shield XT
2010 Saudi Arabia Saudi Aramco Valentine Marine Manifa Field Joint Coating system Stopaq CZH / PVC / High impact Shield New pipeline offshore

2010 Saudi Arabia Saudi Aramco Saipem Safaniyah Field Joint Coating system 2500 offshore Stopaq CZH / PVC / High impact Shield New pipeline Offshore
fieldjoints
2010 Saudi Arabia SWCC Qatif Junction Complete rehabilitation of 48" pipeline, 70Km Stopaq CZH / Outerwrap PVC Existing Onshore

2010 Sudan SPPC Field joint Rehabilitation & new Onshore


construction
2010 Saudi Arabia SWCC Qatif Junction Complete rehabilitation of 42" pipeline, 70Km Stopaq CZH / Outerwrap PVC Existing Onshore

2010 Saudi Arabia KJO PMS Al- Kafji Y2B platform Coating platfor Jackets 48-62" STOPAQ Subsea System New piles Offshore
2010 The Netherlands BP/Shell/MOT SMIT Europe Jetty pile repairs Rehabilitation of 5, 36" Jetty piles Stopaq Subsea System Existing Offshore
2010 Mexico PEMEX GES - Rehabiltation of 250Km 24" pipeline in Swamp Stopaq CZH / Outerwrap PVC Existing Onshore
area
2010 Brasil Petrobras Started in 2010 and ongoing, Repair Subsea Stopaq Subsea Existing Offshore
pipelines (flexible)
2010 Trinidad - CCS - Coating off plot 50" pipeline Stopaq CZH / PVC / Outer glass shield XT New pipeline Onshore and
Offshore
2011 The Netherlands VOPAK SMIT Europe VOPAK Terminal II Rehabilitation of 125 Jetty Piles, >40" Stopaq Subsea System Existing Offshore
2011 Saudi Arabia SWCC Qatif Complete rehabilitation of 60" pipeline, 60Km Stopaq CZH / Outerwrap PVC Existing Onshore

2011 The Netherlands DOW Chemicals SMIT Europe Remmingwerk I Rehabilitation of Jettty piles, >40 Stopaq Subsea / Stopaq CZ/ PVC / OGS Existing Offshore
XT / OGS XT24
2011 Mexico PEMEX SIGMA 38,000m2 rehabilitation 20-24"pipeline Stopaq CZH / Outerwrap PVC Existing Onshore /
Swamp
2011 Sudan GNPOC Rehabilitation & reinforcing of 25,000 Stopaq / Pipewrap reinforcement system Existing Onshore /
fieldjoints / STOPAQ CZHT / HTPP / OGS HT / OGS Swamp
XT
2011 UK Shell UK Woodside Mossmorran Rehabilitation LNG Plant Stopaq Wrappingband CZH / PVC White Existing Onshore
Chem. plant
2011 Kroatia Janaf Fieldjoint / T-joint Coating 36" Stopaq Wrappingband CZH/ PVC / OGS New pipeline Onshore
XT
2011 Mexico Pemex 3150 Rehabilitation of 20-24"pipeline Stopaq wrappinband CZH / PVC Existing Onshore /
Swamp
2011 Antartica Kaefer Neumayer Neumayer research station Sealing of the seams Stopaq Wrappingband CZ / Outerwrap New Onshore
PVC white
2011 The Netherlands Shell EHRI New 4"Plantpiping Stopaq FAST / GRE New pipeline Onshore
2011 Mexico Pemex BMGP Rehabilitation riser coating Stopaq Subsea system Existing Offshore
2011 China PetroChina West-East Gas pipeline Rehabilitation fieldjoint coating Stopaq CZH / GRE Existing Onshore
2011 Nigeria Shell NESTOIL Ltd Two 8" replacement pipeline with induction Stopaq Wrappingband CZH / Stopaq Existing Offshore
bend/risers tie-in to the existing 8" line at Sego Outerwrap PVC / Stopaq Outer glass
manifold (19.07m length of pipe) and Belema shield XT
flow station (15m length of pipe) in the swamp
environment.
2012 UAE Dolphin Energy Robt stone ME LLC Rehabilitation of a 30" bitumen coated pipeline Stopaq CZH / Stopaq outerwrap PVC Existing Onshore
in Abu Dhabi. Total length is 105 km. Project is
in 4 phases beginning the 1st phase Q4 2012
en ongoing in 2013 and 2014

2012 Sudan SPPC Rehabilitation project Stopaq Wrappingband CZHT / Stopaq New pipeline Onshore
Outerwrap HTPP

2012 Pakistan SNGPL Sui Northern Gas pipelines Ltd New pipeline, field joints Stopaq Wrappingband CZH / Stopaq New pipeline Onshore
outerwrap PVC
2012 Pakistan Mari Gas Company Rehabilitation of pipeline, risers & canal Stopaq Wrappingband CZH / Stopaq Existing Onshore
Limited crossings outerwrap PVC
2012 Slovakia Areko MSP DN 300 Field joint coating on a new 16,4km pipeline Stopaq Wrappingband CZH / Outerwrap New pipeline Onshore
PVC / High Impact Shield and Stopaq
CZH Paste
2012 Italy SIOT trieste Subsea Loperfido Rehabilitation of jetty piles Stopaq Wrappingband SZ / Stopaq Existing Offshore
wrappingband CZH / Intermediate Wrap
PVC / Sealing Tape / Outer glass Shield
XT 24
2012 Russia Shell Sakhalin 48" PPL repair and 24" tie-in Stopaq Wrappingband CZH / Outerwrap Existing Onshore
PVC / Stopaq CZH Paste
2012 The Netherlands Akzo Nobel A.Hak Rehabilitation of high quality stainless steel Stopaq Wrappingband and Stopaq Paste Existing Onshore

2012 Nigeria Shell Nigeria Jaybee Rehabilitation of swamp pipeline, risers Stopaq Wrappingband SZ / Stopaq Existing Swamp
wrappingband CZH / Intermediate Wrap
PVC / Sealing Tape / Outer glass Shield
XT 24
2012 United Kingdom BP Stopaq North Sea BP Forties pipeline Cruden Bay Below ground Flanges and 2" pipe work Stopaq Wrappingband CZ / Stopaq Paste Existing Onshore
CZ / Stopaq Outerwrap PVC
2013 Saudi Arabia KJO McDermott KJO Hout offshore gas facilities Field joint coating on 16 onshore fieldjoints Stopaq Wrappingband CZH / Stopaq New pipeline Offshore
and on 3500 offshore fieldjoints High Impact Shield
2013 Sudan GNPOC Ongoing untill 2023 Field joint coating on 125.000 joints Stopaq Wrappingband CZH (80%) and New pipeline Onshore
CZHT (20%) / Stopaq Outerwrap PE
2013 South Korea Samsung Group Shell FLNG Samsung shipyard is building 11 FLNG tankers Sealing and corrosion prevention New shipbuidling Onshore/offs
for Shell and uses Stopaq products in the hore
process
2013 Algeria Sonatrach 40km. 24" pipeline complete rehab = just 5% Stopaq Wrappingband CZH / Stopaq Existing Onshore
of total project Outerwrap PE
2013 UAE Saudi Aramco Snamprogetti/Star Long Term Agreement Maintanence 4000 of 16" en 1100 24" offshore fieldjoints Stopaq CZHT / Outerwrap HTPE / HIS HT New pipeline Offshore
consortium / Rockshield
2013 Brunei SHELL / BLNG Sahid Sendirian Berhad Rehabilitation of jetty piles Stopaq Wrappingband SZ / Stopaq Jetty piles Offshore
wrappingband CZH / Intermediate Wrap
PVC / Sealing Tape / Outer glass Shield
XT 24
2013 Saudi Arabia Saudi Aramco Al-Bargash 15km of rehabilitation of water pipelines Stopaq Wrappingband CZH / Stopaq Existing Onshore
Outerwrap PVC
2013 UAE GASCO 5500 fieldjoints consisting out of 4" to 24" Stopaq Wrappingband CZH / Stopaq New pipeline Onshore
pipelines Outerwrap PVC
2013 Colombia Repsol CB&I Cartagena Refinery expansion New structures, pipelines Stopaq Wrappingband CZH / Stopaq Existing Onshore
project Outerwrap PVC
2013 Mexico PEMEX Factory Applied Stopaq Technology on 10 km STOPAQ FAST New pipeline Onshore
of new pipeline
2013 Sudan PDOC Ongoing untill 2014 IP of the 1400Km 32” pipeline from PDOC has Stopaq Wrappingband CZH / Stopaq Existing Onshore
shown defects on more than 100.000 points Wrappingband PE

2013 Saudi Arabia Saudi Aramco Saipem Wasit New offshore pipeline structures. 42500 field Stopaq Wrappingband CZHT / Stopaq New pipeline Offshore
joints Outerwrap HTPE / Stopaq High Impact
Shield HT / Stopaq Rockshield

2013 Saudi Arabia Saudi Aramco McDermott Safaniya Phase II New offshore pipeline structures. 7200 field Stopaq Wrappingband CZHT / Stopaq New pipeline Offshore
joints High Impact Shield HT
2013 The Netherlands Gasunie A. Hak / VisserSmit Hanab Beverwijk Stopaq Wrappingband CZH / Stopaq
Field joint coating on a 50km, 48 inch pipeline New pipeline Onshore
High Impact Shield
2013 United Kingdom Exxon Mobil - Mossmorran Fife 33m diameter liquid ethylene tank chime area Stopaq Paste CZ / Stopaq Wrappingband Existing Onshore
EZ / Stopaq 4200 filler
2013 Saudi Arabia Saudi Aramco McDermott Karan K-45 project Field joint coating a new20" pipeline Stopaq Wrappingband CZHT / Stopaq New pipeline Offshore
High Impact Shield HT
2013 Ireland Shell - Corrib Field joint coating on the new offshore to Stopaq Wrappingband CZH / Stopaq New pipeline Onshore
onshore pipeline High Impact Shield
2013 The Netherlands Nuon A. Hak Ijmeer project Subsea coating repair work on a 28" pipeline Stopaq Wrappingband SZ / Stopaq Existing Onshore
Intermediate Wrap PVC / Stopaq
Outerglass Shield XT
2013 United Kingdom Shell Unique Martime Group Riser leg in UKCS North Sea 8" riser leg in 100m water depth Stopaq Wrappingband SZ / Stopaq Paste Existing Offshore
SZ / Stopaq Intermediate Wrap PVC /
Stopaq Outerglass Shield XT
2013 Saudi Arabia SWCC Various Rehabilitation of 39000 field joints on a 60" Stopaq Wrappingband CZH / Stopaq Existing Onshore
pipeline Outerwrap PVC
2013 Mexico Comision Estatal de Consorcio de Gestillo Water pipeline Factory Applied Stopaq Technology on 2.5 km Stopaq FAST New pipeline Onshore
Aguas of new pipeline
2013 United Kingdom Shell Stopaq North Sea Coating reinstatement pipeline Coating reinstatement pipeline spool UKCS Stopaq Wrappingband SZ / Stopaq Existing Offshore
spool UKCS North Sea North Sea Intermediate Wrap PVC / Stopaq
Outerglass Shield XT24
2013 United Kingdom TAQA Stopaq North Sea UKCS North Sea 16" riser leg coating repair work Stopaq Wrappingband CZH / Stopaq Existing Offshore
Paste CZH / Stopaq Outerwrap
2013 The Netherlands Shell A.Hak/VSH Norgron Field joint coating a new 48" diameter pipeline, Stopaq Wrappingband CZH / Stopaq New pipeline Onshore
70km High Impact Shield
2014 Saudi Arabia Saudi Aramco McDermott Manifa Phase II Offshore laybarge field joint application Stopaq Wrappingband / Stopaq High New pipeline Offshore
Impact Shield
2014 Saudi Arabia Saudi Aramco Punj Lloyd KJO Hout offshore gas facilities Offshore laybarge field joint application Stopaq Wrappingband / Stopaq New pipeline Offshore
Outerwrap HTPE + infill
2014 The Netherlands Gasunie A. Hak Westerschelde West - Cambron New 14km x 48" pipeline Stopaq Wrappingband CZH / Stopaq New pipeline Onshore
High Impact Shield
2014 Saudi Arabia Saudi Aramco McDermott Karan 45 project Offshore laybarge field joint application Stopaq Wrappingband / Stopaq High New pipeline Offshore
Impact Shield
2014 The Netherlands VOPAK Boskalis Jetty pile repair Rehabilitation of 60 x 16 inch jetty piles Stopaq Wrappingband SZ / Stopaq Existing Inshore
wrappingband CZH / Intermediate Wrap
PVC / Sealing Tape / Outer glass Shield
XT
2014 Saudi Arabia Saudi Aramco Bonatti HDD Stopaq FAST factory applied for horizontal Stopaq basecoat + Stopaq GRE New pipeline Onshore
drilling
2014 Saudi Arabia Saudi Aramco Snamprogetti/Star LTA Phase II Offshore laybarge field joint application Stopaq Wrappingband / Stopaq High New pipeline Offshore
consortium Impact Shield
2014 The Netherlands Gasunie A-Hak / Boskalis Starkeborgkanaal Subsea coating repair work Stopaq Wrappingband SZ / Stopaq
Intermediate Wrap PVC / Stopaq
Outerglass Shield XT24
2014 Indonesia Bluewater Local contractor + SFL tech Yokohama floating hose. Repair of 60 flanges Stopaq Wrappingband SZ+CZ / Stopaq Existing Offshore
and Falck on 20 inch hose connected to FPSO in Timor Paste CZ / Stopaq Wrappingband HSPE /
Sea Stopaq Outerglass Shield XT

2014 Algeria Sonelgaz Exen Rehabilitation of a 20 inch sweating pipeline Stopaq Wrappingband CL / Stopaq Existing Onshore
Outerwrap
2014 Slovakia Transpetrol Areko 9,2 kilometres of 18 inch pipeline Stopaq Wrappingband / Stopaq New pipeline Onshore
Outerwrap
2015 Norway Statoil 1 km rehabilitation Stopaq Wrappingband / Stopaq New pipeline Offshore
Outerwrap + Other suitable mechanical
protection
2015 Norway ConocoPhilips 3 km rehabilitation Stopaq Wrappingband / Stopaq New pipeline Onshore
Outerwrap + Other suitable mechanical
protection
2015 Pakistan SNGPL SND1709 Supply of rehabilitation works - 150.000 rolls Stopaq Wrappingband / Stopaq New pipeline and existing Onshore
Outerwrap
2015 Algeria Sonatrach JGC Application of flanges and risers Stopaq Wrappingband / Stopaq New pipeline Onshore
Outerwrap / Stopaq Paste / Stopaq
Vinylester
2014 - United Arab Emirats
GASCO EPS Supply of material for ongoing rehabilitation of Stopaq Wrappingband / Stopaq New and existing Onshore
ongoing pipelines and infrastructure Wrappingband

2015 Gabon Shell A.Hak Gamba Expor sealine replacement Field joint coating Stopaq Wrappingband / Stopaq New pipeline Onshore
Wrappingband
2015 Ghana Vulcan FAST Stopaq FAST New pipeline Onshore
2015 Australia Woodside Local contractor + SFL tech Stopaq corrosion prevention solution for Stopaq Wrappingband / Stopaq New Offshore
and Falck offshore and partly onshore applications Outerwrap + Other suitable mechanical
protection
2015 Mexico PEMEX Consorcio de Gestillo Ongoing rehabilitation works Stopaq Wrappingband / Stopaq Existing Onshore
Outerwrap
2015 United Kingdom Shell UK Cape Mossmorran Phase II Ongoing rehabilitation works Stopaq Wrappingband / Stopaq Existing Onshore
Outerwrap
2016 Sudan PDOC CPP Rehabilition of 6000 points on a 32inch Stopaq Wrappingband / Stopaq Existing Onshore
pipeline Outerwrap
2016 Dominican Punta Catalina Odebrecht Central Termoelectrica - Proyecto New power plant - all pipe work coated with Stopaq Wrappingband / Stopaq New Onshore
Republic Punta Catalina Stopaq Outerwrap
2016 The Netherlands VOPAK Hakkers & DCN Diving Rehabilition of jetty piles Stopaq Wrappingband SZ / Stopaq Existing Onshore/offs
wrappingband CZH / Intermediate Wrap hore
PVC / Sealing Tape / Outer glass Shield
XT
2016 Russia Yuzhno-Sakhalinsk Fluor Daniel Eurasia Coating under Insulation Stopaq Wrappingband / Stopaq New Onshore
Outerwrap
2016 Saudi Arabia Saudi Aramco McDermott Zuluf & Marjan field development Offshore laybarge field joint application Stopaq Wrappinband / Stopaq High New Offshore
Impact Shield
2016 South Africa Saldahana Stopaq Southern Africa Bullet tank application Easy-Qote (Basecoat VE + PU topcoat) New Onshore

2016 Saudi Arabia Saudi Aramco McDermott Al- Khafji Offshore laybarge field joint application Stopaq Wrappinband / Stopaq High New Offshore
Impact Shield
2016 South Africa Eskom Stopaq Southern Africa Kusile power plant application Easy-Qote Basecoat VE + High New Onshore
performance UV & Chemically resistant
topcoat
2016 Slovakia Areko Pipeline coating
2016 Lithuania Amber Grid Pipeline coating rehabilitation Stopaq Wrappingband / Stopaq Existing Onshore
Outerwrap
2016 The Netherlands Shell Van de Ende Pernis Various pipeline coating rehab works at the Stopaq Wrappingband / Stopaq Existing Onshore
Pernis refinery Outerwrap
2016 Canada DNow Pipeline coating rehabilitation Stopaq Wrappingband / Stopaq Existing Onshore
Outerwrap
2016 Mexico PEMEX GES Various pipeline coating rehab works and Stopaq Wrappingband / Stopaq Existing Onshore
flange and valve applications Outerwrap / 4200 Putty
2016 Australia INPEX Various local contractors Ichthys onshore refinery Various pipeline coating (rehab) works and Stopaq Wrappingband / Stopaq New + Existing Onshore
flange, valve applications and H-Beam Outerwrap / 4200 Putty
2016 Pakistan SNGPL New and rehabiliation works on gas network Stopaq Wrappingband / Stopaq New + Existing Onshore
Outerwrap
2016 Pakistan SSGC New and rehabiliation works on gas network Stopaq Wrappingband / Stopaq New + Existing Onshore
Outerwrap
2016 Australia Jemena ACT + other local Pipeline field joint coating + various rehab Stopaq Wrappingband / Stopaq New + Existing Onshore
works on pipe work Outerwrap
2016 Malaysia / Brunei BLNG PTT Engineering Refinery, jetty piles and pipe work Stopaq Wrappingband / Stopaq Existing Onshore
Outerwrap / Stopaq Wrappingband EZ

2016 Oman PDO Oman Al Ghalbi Full rehabilition works on 26km of a 36inch Stopaq Wrappingband / Stopaq Existing Onshore
pipeline Outerwrap

Вам также может понравиться