Вы находитесь на странице: 1из 1

Items Descriptions Hauko Construction Network Service (CNS) Action

1 Latest Dwgs Provide with 1st Floor 053018 R04 Attached CNS to Revise Quotation and Dwgs
2nd Floor 053018 R04 Attached CNS to Revise Quotation and Dwgs

2 Structural Opening for Stairs Provide on R02 Structural Opening Not Provided CNS to Revise Quotation and Dwgs

3 Notes On Dwgs To Be Updated As Per Attached Dwgs Haruko to Action as required

4 Number of Bays Provided by CNS as 7 bays As per Attached PDF's May 30 2018 CNS to Indicate Center Lines of walls
(relative) since they are no longer the

Вам также может понравиться