APPENDIX

Record of Foundation Settlement Observations - XXXX U10


Project Name: Hassyan Clean Coal Power
Plant - Phase 1 (4x600 MW Net) Observer: CSCEC Observer: CSCEC Observer: CSCEC Observer: CSCEC Observer: CSCEC Observer: CSCEC Observer: CSCEC Observer: CSCEC Observer: CSCEC Observer: CSCEC Observer: CSCEC Observer: Dzingirai J (HEI) Observer: Yangwei (NEPDI)
Weather Weather Weather Weather Weather Weather Weather Weather Weather Weather Weather Weather Weather
- - - - - - - - - - - Sunny and Hot Sunny and Hot
Client: Hassyan Energy (ACWA, DEWA, HEI) Condition: Condition: Condition: Condition: Condition: Condition: Condition: Condition: Condition: Condition: Condition: Condition: Condition:
o o
Consultant:FICHTNER Temp: - Temp: - Temp: - Temp: - Temp: - Temp: - Temp: - Temp: - Temp: - Temp: - Temp: - Temp: 36 C Temp: 38 C

EPC Contractor: HEI Area Condition: - Area Condition: - Area Condition: - Area Condition: - Area Condition: - Area Condition: - Area Condition:- Area Condition: - Area Condition: - Area Condition: - Area Condition: - Area Condition: All area backfilled Area Condition: All area backfilled
Civil Main Contractor: CSCECME & CSCEC
3B2 Joint Venture

Location:XXXX U10 (0.000m Level)


1st time(June & July) 2nd time (September 7, 2017) 3rd time (September 24, 2017) 4th time(November 17, 2017) 5th time(December 17,2017) 6th time(January 15,2018) 3rd Party (January 22,2018) 7th time(January 22, 2018) 8th time(January 26, 2018) 9th time(February 3, 2018) 3rd Party 2nd time (Feburary 7,2018) 03/07/2018 08/07/2018
distance for Compare
Compare
Settlement baseplate top DMD Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative Compare with Cumulative Cumulative with last Cumulative
Location of column DMD Bottom of Settlement for Settlement for Cumulative Settlement for Settlement for Settlement for Settlement for DMD elevation DMD elevation Settlement for DMD elevation Settlement for DMD elevation Settlement for DMD elevation DMD elevation with last DMD
observation point No. to elevation DMD elevation /m DMD elevation /m Settlement DMD elevation /m Settlement DMD elevation/m Settlement DMD elevation /m Settlement Settlement Settlement Settlement Settlement last 3rd party Settlement Settlement Harbin Settlement
Baseplate (M) this time /mm this time /mm Settlement (mm) this time /mm this time /mm this time /mm this time /mm /m /m this time /mm /m this time /mm /m this time /mm /m /m 3rd party elevation /m
observation /m (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) survey (mm) (mm) Survey (mm)
survey
point (mm)

= No Data
BENCHMARK USED BENCHMARK USED
POINT ELEVATION POINT ELEVATION

EQUIPMENT USED EQUIPMENT USED


Make and Make and
Model Model
Calib CertNo. Calib CertNo.

Appendix 1

Graph of Foundation Settlement Observations - XXX U10


Project Name: Hassyan Clean Coal Power Plant - Phase 1 (4x600 MW Net)
Client: Hassyan Energy (ACWA, DEWA, HEI)
Consultant:FICHTNER
EPC Contractor: HEI
XX1/Load-Settlement Curve XX2/Load-Settlement Curve XX3/Load-Settlement Curve
7358.00 7471.00 7471.00 7471.00 7471.00 7358.007471.007471.007471.007471.00
BL-B7/Load-Settlement Curve
Civil Main Contractor: CSCECME & CSCEC 3B2 Joint Venture 8000.00 8000.00 7358.007471.007471.007471.007471.00
8000.00 7358.007471.007471.007471.007471.00
7000.00 8000.00
7000.00
Location:Boiler U10 (0.000m Level) 6000.00
5600.00 5600.00 7000.00 5600.00 7000.00 5600.00
6000.00 6000.00
Date 2017.6 2017.9.7 2017.9.24 2017.11.17 2017.12.17 2018.1.15 2018.1.22 2018.7.03 2018.7.08 6000.00
5000.00 5000.00 5000.00
3642.00 3642.00 3642.00 5000.00 3642.00
Load/MT 1182.00 3000.00 3642.00 5600.00 7358.00 7471.00 7471.00 7471.00 7471.00 4000.00 3000.00 4000.00 3000.00 4000.00 3000.00 4000.00 3000.00
1-G-1 BL-B1 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3000.00 3000.00 3000.00 3000.00
2000.00 1182.00 2000.00 1182.00 2000.00 1182.00 1182.00
1-G-1 BL-B1 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2000.00
1000.00 1000.00 1000.00 1000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-2 BL-B2.9 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
1-G-2 BL-B2.9 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-3 BL-B5.1 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-3 BL-B5.1 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-4 BL-B7 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Load/MT Settlement*500/mm Load/MT Settlement*500/mm Load/MT Settlement*500/mm Load/MT Settlement*500/mm
1-G-4 BL-B7 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-5 BK-B7 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-5 BK-B7 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-6 BK-B4 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 XX4/Load-Settlement Curve XX5/Load-Settlement Curve XX6/Load-Settlement Curve BH-B1/Load-Settlement Curve
1-G-6 BK-B4 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8000.00 7358.00 7471.00 7471.00 7471.00 7471.00 8000.00 7358.007471.007471.007471.007471.00 8000.00 7358.007471.007471.007471.007471.00 8000.00 7358.007471.007471.007471.007471.00
1-G-7 BK-B1 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7000.00 7000.00 7000.00 7000.00
1-G-7 BK-B1 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5600.00 5600.00 5600.00 5600.00
6000.00 6000.00 6000.00 6000.00
1-G-8 BH-B1 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5000.00 5000.00 5000.00 5000.00
1-G-8 BH-B1 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3642.00 3642.00 3642.00 3642.00
4000.00 4000.00 3000.00 4000.00 4000.00
3000.00 3000.00 3000.00
1-G-9 BH-B4 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3000.00
3000.00 3000.00 3000.00
1-G-9 BH-B4 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2000.00 1182.00 2000.00 1182.00 2000.00 1182.00 2000.00 1182.00
1-G-10 BH-B7 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1000.00 1000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1000.00 1000.00
1-G-10 BH-B7 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
1-G-11 BG-B7 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-11 BG-B7 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-12 BF-B2 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-12 BF-B2 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Load/MT Settlement*500/mm Load/MT Settlement*500/mm Load/MT Settlement*500/mm Load/MT Settlement*500/mm
1-G-13 BD-B2 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-13 BD-B2 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-14 BF-B6 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-14 BF-B6 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 XX7/Load-Settlement Curve XX8/Load-Settlement Curve XX9/Load-Settlement Curve BF-B2/Load-Settlement Curve
1-G-15 BD-B6 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8000.00 7358.00 7471.00 7471.00 7471.00 7471.00 8000.00 7358.007471.007471.007471.007471.00 7358.007471.007471.007471.007471.00 7358.007471.007471.007471.007471.00
1-G-15 BD-B6 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8000.00 8000.00
7000.00 7000.00
1-G-16 BD-B7 Settlement 0.00 0.00 0-8 0.00 0.00 0.00 0.00 0.00 0.00 7000.00 7000.00
5600.00 5600.00
1-G-16 BD-B7 Settlement*500/mm 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 6000.00 6000.00 5600.00 5600.00
6000.00 6000.00
1-G-17 BB-B6 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5000.00 5000.00
5000.00 5000.00
1-G-17 BB-B6 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3642.00 3642.00
4000.00 4000.00 3642.00 3642.00
3000.00 3000.00 4000.00 4000.00
1-G-18 BB-B2 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3000.00 3000.00 3000.00 3000.00
1-G-18 BB-B2 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3000.00 3000.00
2000.00 1182.00 2000.00 1182.00
1-G-19 BA-B1 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2000.00 1182.00 2000.00 1182.00
1000.00 1000.00
1-G-19 BA-B1 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1000.00 1000.00
0.00 0.00
1-G-20 BA-B3 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-20 BA-B3 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-21 BA-B5 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1-G-21 BA-B5 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Load/MT Settlement*500/mm Load/MT Settlement*500/mm
1-G-22 BA-B7 Settlement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Load/MT Settlement*500/mm Load/MT Settlement*500/mm
1-G-22 BA-B7 Settlement*500/mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BD-B2/Load-Settlement Curve BD-B6/Load-Settlement Curve BD-B7/Load-Setttlement Curve


BF-B6/Load-Settlement Curve

Appendix 2
8000.00 7358.00 7471.00 7471.00 7471.00 7471.00 8000.00 7358.007471.007471.007471.007471.00 8000.00 7358.007471.007471.007471.007471.00
8000.00 7358.007471.007471.007471.007471.00
7000.00 7000.00 7000.00
7000.00 5600.00
5600.00 5600.00 6000.00
6000.00 5600.00 6000.00
6000.00
5000.00 5000.00 5000.00
5000.00
3642.00 3642.00 3642.00
4000.00 3642.00 4000.00
3000.00 4000.00 4000.00 3000.00
3000.00 3000.00
3000.00 3000.00 3000.00
3000.00
2000.00 2000.00 2000.00 1182.00
1182.00 1182.00 2000.00 1182.00
1000.00 1000.00 1000.00
1000.00
0.00 0.00 0.00
0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

Load/MT Settlement*500/mm Load/MT Settlement*500/mm Load/MT Settlement*500/mm


Load/MT Settlement*500/mm

BB-B6/Load-Settlement Curve BB-B2/Load-Settlement Curve BA-B1/Load-Settlement Curve


8000.00 7358.00 7471.00 7471.00 7471.00 7471.00 8000.00 7358.007471.007471.007471.007471.00 8000.00 7358.007471.007471.007471.007471.00 BA-B3/Load-Settlement Curve
7000.00 7000.00 8000.00 7358.007471.007471.007471.00
7000.00
5600.00 5600.00
5600.00 6000.00 6000.00 7000.00
6000.00
5600.00
5000.00 5000.00 6000.00
5000.00
3642.00 3642.00
3642.00 4000.00 4000.00 5000.00
4000.00 3000.00 3000.00
3000.00 3642.00
3000.00 3000.00 4000.00 3000.00
3000.00
2000.00 1182.00 2000.00 1182.00 3000.00
2000.00 1182.00
1000.00 1000.00 2000.00 1182.00
1000.00
0.00 0.00 1000.00
0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Load/MT Settlement*500/mm Load/MT Settlement*500/mm


Load/MT Settlement*500/mm
Load/MT Settlement*500/mm

BA-B5/Load-Settlement Curve BA-B7/Load-Settlement Curve


8000.00 7358.00 7471.00 7471.00 7471.00 7471.00
8000.00 7358.007471.007471.007471.007471.00
7000.00
7000.00
5600.00
6000.00 5600.00
6000.00
5000.00
5000.00
3642.00
4000.00 3642.00
3000.00 4000.00
3000.00 3000.00
3000.00
2000.00 1182.00
2000.00 1182.00
1000.00
1000.00
0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Load/MT Settlement*500/mm
Load/MT Settlement*500/mm