This document is a project quality plan (PQP) checklist for waterproofing systems and roof finishes for Project 19. It details 21 points that must be verified for the waterproofing system, including approval of subcontractors and materials, surface preparation, proper waterproofing application techniques, flood testing, insulation and roof tile installation. It also includes 4 points to coordinate with mechanical, electrical and HVAC work. The checklist requires sign off from site staff, engineers and managers to confirm quality requirements have been met.
This document is a project quality plan (PQP) checklist for waterproofing systems and roof finishes for Project 19. It details 21 points that must be verified for the waterproofing system, including approval of subcontractors and materials, surface preparation, proper waterproofing application techniques, flood testing, insulation and roof tile installation. It also includes 4 points to coordinate with mechanical, electrical and HVAC work. The checklist requires sign off from site staff, engineers and managers to confirm quality requirements have been met.
This document is a project quality plan (PQP) checklist for waterproofing systems and roof finishes for Project 19. It details 21 points that must be verified for the waterproofing system, including approval of subcontractors and materials, surface preparation, proper waterproofing application techniques, flood testing, insulation and roof tile installation. It also includes 4 points to coordinate with mechanical, electrical and HVAC work. The checklist requires sign off from site staff, engineers and managers to confirm quality requirements have been met.
Project No. 19 Project Name Project detail/ Location
Check list for Water Proofing System and Roof Finishes
Location: Sheet No.
S. No. Points to be verified Yes No N/A Remarks
1 Approval of Specialized Sub contractor 2 Approval of material and availability at site 3 Internal side plastering of parapet wall is completed 4 Upstands and pedestals etc. are completed along with triangular fillets 5 Surface of screed is smooth / clean and without any pointed 6 Groove on vertical surface for termination of water proofing completed 7 Surface to be waterproofed is fully dry and free from dust / dirt 8 Quality of material is checked like material is not very old etc. 9 Laying of water proofing commenced from the lowest point to ensure weather overlaps 10 Sufficient caps are given and torch is applied to the total surface of the membrane for better adhesion 11 Check for bubbles is made and rectified if any 12 Dressing to gargoyles/rwp is done as per specification 13 Has the check for damages, if any, in water proofing membrane been carried out before flood test 14 Has the flood test been carried out for 24 hours 15 Protection to membrane is provided 16 50mm thick insulation is laid on membrane with proper joints 17 Quality of insulation board is as per specification 18 Geotextile mambrane is as per approval 19 Roof Terrazzo tiles are as per approval 20 Tiles are laid to slope and as per specs. 21 Contraction joints are as per specs.
M&E Co-ordination for Roof water proofing and roof finishes
S. No. Points to be verified Yes No N/A Remarks 1 All mechanical / electrical / ac conduits / ducts are in place 2 AC sub contractor has checked foundation, pedestals and approval obtained 3 Installation of rain water outlet as per drawing & specs. 4 Lightning protection is as per drawing Other special requirements/Remarks: