Lokoja road Mountain Slope data.

Hill Name Constructed Cut Cut Slope New design Foot benching
s/n Chainage Length Height
by (Asbuilt) cut slope clearance width
1 CH4+300 - CH4+700 Jamata Hill Gitto 11m 1.15:1 5.5m None
2 CH9+475 - CH10+850 Ohono Hill Gitto 1375m 42m 1.75:1 6.5m 3m
3 CH24+925 - CH25+175 Okumi Hill1 Chineese 250m 55m 1.5:1 1.33:1 <1m 3.5m
4 CH25+500 - CH25+750 Okumi Hill2 Chineese 250m 52.5m 1.5:1 1.33:1 <1m 3.5m
5 CH26+400 - CH26+900 Mast Hill Gitto 500m <30m 4.5m 3m
Technical Department Duty Schedules

S/N Staf Current Duties New Duty to be assigned


Site Materials and Budget Preparation Monthly Progress report
Engineering Designs and Drafting
1 Suleiman
Daily Production Monitoring
Documents and progrm of work & Charts preparation
Rate Analysis and B.O.Q Preparation Daily Production Monitoring
2 Clement Valuation of Certificates
Bidding
Road Designs and drafting Dail equipment Production vs Diesel consumption Monitoring
3 Augustine
Bidding Packaging, submission and Opening attendance
Documents Archiving Daily Production Monitoring
Site material supply tracking
4 Isah
Bidding - Packaging
Stationeries inventry, Scanning, photocopies and binding
CAD Drafting
5 Azeez (Corp Menber)
photocopies and binding
Technical Office: Schedule of Responsibilities

A General Project Planning and Management Reporting (Monthly Basis) Remarks


1 Compilation of Progress reports and Photographs
2 Compilation of Production reports
3 Proparation of Progrm of Work
4 Proparation of graphical Progress Charts
5 Preparation of mock Certificaltion
6 Preparation of matrials budget for procurement
7 Preparation of reports on materials supply to site
8 Site Visits

B Technical and Engineering Services


1 Engineering Designs and Drafting
2 Provide Technical Solutions
3 Preparation of B.O.Q & BEME
4 Rate Analysis
5 Valuation of Certificates
6 Review of Designs
7 Asbuilt drawings

C Cost Control and Project Monitoring Services


1 Daily Production Monitoring
2 Materials procurement and supply to site report
3 Manpower Reports
4 Equipments working hours and Diesel Consumption Reports
5 Equipments performance reports
6 Summary of Cost and Actual Production Reports
7 Site Visits

D Tendering and Procurements


1 Compilation and updating tender Documents and company profile
2 Bidding Packaging, submission and Opening attendance
3 Stationeries inventry, Scanning, photocopies and binding
4 Documents Archive

E Sub-Contracting
1 Evaluation of proposals
2 Preparation of Valuation Certificates