Вы находитесь на странице: 1из 1

Company Training

Drill
NFPA Objectives (JPR’s) Job Levels Critical Safety Points
• NFPA 1410 (2005) • All • Lead-outs
A.6.1.1 to A.8.1.1 • Water supply line charging

NFPA 1410 Recommended Evolutions Summary


Evolution Type Activity Description Water Supply Flow Time
GPM
1 Handline Forward lay using one engine and one Forward 300’ from 300 gpm 3 min
supply line. 1 attack, 1 backup hydrant
2 Handline Reverse lay from first engine to second Reverse 300’ between 300 gpm 4 min
engine. 1 attack, 1 backup engines
3 Handline Reverse lay with one engine using a wye; Reverse 300’ to 300 gpm 4 min
300 ft to wye, 150’ from wye to nozzle hydrant
4 Handline 2 Forward lays using two engines, 1 attack Forward 300’ from 300 gpm 3.5 min
line off Eng 1, 1 backup off of Eng 2 each engine
5 Handline Drafting operation using one engine and Engine at water supply 300 gpm 5 min
portable water supply
6 Master Reverse lay from portable monitor nozzle 300’ from monitor to 500 gpm 5 min
Stream using one engine; 1 portable monitor engine at hyd.
7 Master Forward lay with one engine using engine 300’ from hydrant to 500 gpm 3 min
Stream mounted monitor; 1 fixed monitor engine
8 Master Reverse lay from elevated master stream 300’ reverse from 500 gpm 4 min
Stream using one engine and one aerial device with aerial to engine on
elevated master stream hydrant
9 Master Reverse lay from elevated master stream 300’ from aerial to 700 gpm 5.5 min
Stream using one engine and supplying on handline; engine on hydrant,
1 backup line and one elevated stream backup line from
engine
10 Master Forward lay using one engine to supply an 300’ forward from 500 gpm 5 min
Stream elevated master stream with two lines hydrant to eng., 100’
from engine to aerial
with 2 lines
11 Supply to Forward lay to sprinkler connection 300’ from hydrant to 500 gpm 3.5 min
Sprinkler engine, 100 ft from
System engine to Siamese
12 Supply to Reverse lay from the sprinkler connection 300’ reverse from 500 gpm 3.5 min
Sprinkler connection to eng at
System hydrant
13 Supply to Forward lay to sprinkler connection using 300’ forward from 500 gpm 3.5 min
Sprinkler LDH hydrant to eng
System

Use this summary to determine the applicable drills for your department according to your SOG’s.
Each of these drills is available at www.fireengineering.com and can be downloaded for your use.

Drill Assigned to: Local Drill Applications Date of Drill:


SOG #: Reading Assignment: Practical Assignment:

Вам также может понравиться