Desired Position: Civil Structure & Architect Manager

1. PERSONAL

Full Name: BUI VAN LUONG


Date of Birth : 11 - 07-1969
Gender : Male
Nationality: Viet Nam
Home Address: 35 Street 55A -Quarter 9- Ward TanTao - District Binh Tan - Ho Chi Minh City -Viet
Nam
Home phone : +848 37540901
Mobile phone : +84908 754 714
Email : louisbui2014@gmail.com
Career object: - I always want to develop myself professionally with a managing project (Or a
Finishing Contractor) and learn new skills by meeting new challenges.
- I am looking for an opportunity to utilize all my potential and maximize my
experience of working in the construction industry in the past 25 years.
- In all given assignments, I work very hard with all my enthusiasm, ethic business
and integrity. I am well disciplined and honest.

2. FOREIGN LANGUAGE & COMPUTER SKILLS

English Fluent
Computer Auto CAD, Microsoft offices, Microsoft Project, Etabs…
3. Education – Qualification

1987-1989 College of Construction No.6 TuyHoa Town, Phu yen Province – Civil & Industrial
Technician .

1997-2002 Bach Khoa HCM City University – Civil & Industry Engineer

08/2007 Construction Supervision & Consultant Certificate from VietNam Ministry of Construction
12/2008 Certificate of Construction Project Management from American Society Civil Engineer
12/2009 Certificate of Structure Design from Ho Chi Minh City Construction Department
08/2010 Certificate of Construction Project Management from Open University of Ho Chi Minh
City

11/2010 Certificate of Estimation Engineer from Open University of Ho Chi Minh City

03/2011 Attend the basis training course in Project Management from PMI

Bui Van Luong Resume Page 1 of 10


4. WORKING PROCESS & PROFESSIONAL EXPERIENCES
2014- Now COFICO- 108 Cao Thang Street, Ward 4, Dist 3, Ho Chi Minh City, Viet Nam.

1. Project Manager: Responsible for Contract Appendix No.06


Golden Plaza Project – 922 Nguyen Trai Street, Ward 14, District 5 – Ho Chi Minh City.

- Manage and control all sub-contractor packages following the Cost, Schedule,
Scope of Work and Specification.

- Organize the Project Management Board on site.

- Manage and Control the Project Budget.

- Allocate the project budget to smaller packages and control them.

- Create main milestones Schedule and Master Schedule.

- Monitor, Control Progress and Adjust manpower to meet the Progress.

- Participate the project Coordination meetings between the Sub contractors.

- Organize the HSE and security department control on site.

2. Project Manager: Responsible for Contract of Civil & Structrure Work


SG Sagawa Project – Road no.6, Nhon Trach3 IP – Dong Nai Province.

- Manage and control all sub-contractor packages following the Cost, Schedule,
Scope of Work and Project Specification.

- Organize the Project Management Board on site.

- Manage and Control the Project Budget.

- Allocate the project budget to smaller packages and Control them.

- Compile main milestones Schedule, Master Schedule and Control them.

- Organize to compile Quality project plan and Control Project Quality.

- Create the Project WBS and allocate the Project staff Role & Responsible.

2013- 2014 AA Corporation- 15 Nguyen Duy Hieu, Thao Dien ward, Dist 2, HCMC, Viet Nam.

QA/QC Manager :
Pullman Saigon Centre Project – 148 Tran Hung Dao Street, District 1 – HCMC.

- Create the Project Quality Plan for All Works of Package (BP09 Package),,,

- Create & Control the Communication System of the Package such as Change
management (Change the Specification, Material, BOQ…), Drawing issue from
client.

- Coordinate to QS department for variation Items.

Bui Van Luong Resume Page 2 of 10


- Compile the Method Statement for All Package Activities.

- Control the Setting out method of the Package ( Bench Mark, Gridlines & Levels)

- Submit the Materials Conformance to Specification & Cost requirement

- Internal inspect the all Site Works, Materials prior to submit Client for inspection,,,

- Manage & Control all Process of civil & fit-out works in BOH and FOH area.

- Create the Inspection Record for Site Works, Materials and Method Statement,,,

- Hold the visiting the Contractor’s Factory for inspect the Materials, Process &
procedures of the Furniture Equipment manufacturing.

- Attend the site meetings related the quality issues, etc…Propose the solution deal
with problem.

- Perform Closing out the NCRs from Client CM/PM.

- Warn the technical errors from Subcontractor and Issue the NCR to Subcontractor
if any.

- Find out the Factors cause the Technical Errors and perform the preventives.

- Compile the Punch List & Submit them to CM/PM for addition the Punch List.

- Perform Rectify, Adjust & Complete all the items in the Punch List.

- Handover the Completed Activities to Client.

- Coordinate to Shop Drawing Department for Compete the As-built Documents, The
Operations & Maintenance manual.

Bui Van Luong Resume Page 3 of 10


2010–2012 VMC Project Management- Level 6, Satra Building, 58 Dong Khoi Street, Ben Nghe
ward, Dist 1, Ho Chi Minh City, Viet Nam.

1. Finishing Manager :
Novotel Saigon Centre Project– 63-65 Hai Ba Trung Street, District 3 – Ho Chi Minh
City. This project divide into 24 packages.

- Participate to interview the ID tender packages such as Guestroom package,


Ballroom package, Restaurant package, Swimming pool package,,,

- Manage all finish and fit-out works of all project works including BOH and FOH area.

- Attend the coordinated site meetings between the contractors such as Civil
contractor. Fit-out contractor, MEP contractor, etc…Propose the solution deal with
problem.

- Review and approve the contractor shop drawings combine with specification,
drawing in the contract, and MEP drawing.

- Supervise material sampling, testing compliance with contract.

- Supervise and inspect the site activities according to the approved shop drawing.

- Issue the NCRs when contractor’s failure to comply the contract.

- Compile, control, and close the Punch List

- Track and evaluate each activity in the weekly progress.

- Issue the Site Instruction for the additional work out of the contract.

2010–2011 VinaProjects Management Co.,Ltd. 16-20 Hai Ba Trung Str, Ben Nghe ward, Dist.1, Ho
Chi Minh City, Viet Nam.

1. Assistant Construction Manager :


 Sheraton NhaTrang Project – 26-28 Tran Phu Street – Nha Trang City- Khanh Hoa
Province, Viet Nam.
- Manage all the Works of all contractors and coordinate to all contractor works such
as MEP works, Civil works and fix-out works…
- Compile, control, and close the Defect & Omissions List
- Hold the coordinated site meetings between the contractors such as Civil contractor.
Fit-out contractor, MEP contractor, etc…Propose the solution deal with problem.
- Approve the civil shop drawings such as BOH shop drawing
- Combine with design consultant on order to approve the shop drawing especially fit-
out shop drawings of FOH area.
- Inspect the site activities according to the approved shop drawing.

- Issue the Site Instruction for the additional work out of the contract.
- Check and evaluate each contractor activity in the contractor payment record prior to
transmit CM issue the Payment Certification to contractor.

Bui Van Luong Resume Page 4 of 10


2007–2010
HBP Project Management Co., Ltd.Level 6, Dinh Le building-01 Dinh Le, ward 12, Dist
4, Ho Chi Minh City, Viet Nam
1. Senior Engineer :
+ Sunrise City Project – Plot V Nguyen Huu Tho Boulevard – District. 7 – HCM City:

-Manage the Barrette Pile work, Diaphragm Wall work, Basement work (Use the Top-
Down method statement ):

-Monitor and control the kingpost manufacturing in workshop including the material
sampling, NDT the welds.

-Supervise and Inspect the barrette pile work and the kingpost erection on site.

-Warn the contractor aspect of the factors cause technical errors and propose the
preventives.

-Contribute the expert judgment aspect of the method statement prior CM approve it.

+ Centre Point Project – 106 Nguyen Van Troi – District. Phu Nhuan – HCM City:

-Manage all work of main contractor and nominated sub-contractor such as Bored
Piles, Diaphragm Wall, Basements, Superstructure, STP, Finishing, landscaping work
and coordinate the MEP work with these works.

- Uncover the conflicts of architect design and MEP design and send RFI aspect of
these problems to the design consultant.

- Supervise material sampling, testing compliance with contract.

- Supervise and inspect the site activities according to the approved shop drawing.

- Contribute the expert judgment aspect of the method statement prior CM approve it.

- Compile, control, and close out the Defect & Omissions List.

- Track and evaluate each activity in the weekly progress. Propose Solution Deal the
Progress problem

Bui Van Luong Resume Page 5 of 10


2004–2007 Cotecland Joint Stock Company
1. Site Manager :
+Aview Apartment Project – Phong Phu commune, Binh Chanh Dist., HCM City
- Construct the piling work, Basement work, and superstructure Works such as to
organize all the work on site as per contract: distribute the civil works into the crews,
teams, sub-contractors; organize the crew carry-out the HSE matters and monitoring
& controlling them.
- Plan the Project Materials, Resources, Equipments.
- Organize, Arrange the site construction master plan.
- Create the method statement and submit to CM.
- Track, evaluate, and adjust each activity of the sub-contractor in order to meet the
project master schedule.
- Assign the roles and responsibilities to each site management staff.
- Monitor and Control the changed design and Additional work out of the contract.
- Create and submit the VO, claims to the CM issuing the payment certification.
- Hold the coordinate meetings between the crews, sub-contractors aspect of the site
activities.
- Lead and Assign the site Safety & Security responsibilities to the Safety-Security
Manager.
- Compile and Negotiate the contract with the material suppliers and subcontractors.
2. Vice Site Manager :
+ The Lancaster Project – 22 Le Thanh Ton Street – District. 1 – HCM City:
-Construct the Superstructure Work, Finishing work involve to create, organize the
shop drawings, Method Statements, HSE matters on site .
- Find out the conflicts of the architectural drawing and MEP drawing and send RFI
aspect of such problems to CM.
- Compile contracts of the teams, crews, sub-contractors.
- Manage and Control the teams, crews carrying out works on site.
- Manage and Control the Safety & Security Team on site.
+The Golden Tower Project – Nguyen Binh Khiem & Nguyen Thi Minh Khai corner
- Construct the Basement Work, Superstructure Work, Finishing work involve to create,
organize the shop drawings, Method Statements, HSE matters on site .
- Find out the conflicts of the architectural drawing and MEP drawing and send RFI
aspect of such problems to CM.
- Compile contracts of the teams, crews sub-contractors.
- Manage and Control the teams, crews carrying out works on site.
- Manage and Control the Safety & Security Team on site.
2001–2004 HOA BINH CORPORATION COMPANY
Construct some projects :
+ The Long Thanh Golf Villa: Construct the Structure work, Finishes work and Fit-out
work.
+ The My Khanh Apartment – Phu My Hung New City Park: Construct the structure &
Finishes work
+ Park Hyatt hotel: Construct the finishes work in swimming pool & BOH area (HoaBinh
is China States Construction Engineering Corporation‘s sub-contractor):
- Supervise the brickwork, water proofing work. plastering work, painting work, tiling
work, door work and inspect these work with CM

Bui Van Luong Resume Page 6 of 10


1999–2001 PROTECT-AIM COMPANY (Special to Ironmongeries Door Hardware)

+ Golden Sand Hotel in HoiAn town, QuangNam Province: Supply and Support the
technical aspect of door hardware of all project areas.

+ Park Hyatt Saigon Hotel: Supply, Install, and support technique aspect of door
Hardware such as smartcard lock of all the guest room, and all the hardware of other
areas.

1996–1999
SINHNAM INDUSTRIAL – SinhNam is sub-contractor of the LE glass-door-window
contractor undertaken the installation all doors.
Construct all the Steel, Glass, Aluminium doors and windows of some projects:

+ Sheraton Saigon hotel: Construct the Glass, Aluminum Door & Window especially
canopy area.

+ Sofitel Saigon Plaza – Construct the Aluminum & Door & Window .

1993–1996
A&B ENGINEERING – Specialize to Glass & Aluminium:
Construct some projects such as:

+ Focal Fiber Optic Cable factory– National road #1, Binh An Hamlet, NgaiThang
Commune, DiAn District, BinhDuong Province.

+ SunWah Tower – 115 Nguyen Hue street, Dist 1, HCMC : Construct all aluminum
doors and windows especially the Curtain Wall Façade.

1991–1993 HAI THANH COMPANY- Specialize to pre-engineering


+ Design, Fabricate and construct the pre-engineering projects in HCM city

1989–1991 No.1 Construction Company – A middle-size Construction Company in BinhDinh


Province

+ Phu Phong Unravel Silk Cocoon Factory, Phu Phong Town, Tay Son Dist, Binh Dinh
Province

+ BinhDinh AC-Bagexco Granite Processing Plant – National Road #19 , Nhon Tho
Commune, AnNhon Dist., BinhDinh Province

+ Villa & House Park of foreign expert of Vinh Son Hydroelectricity Plant, Vinh Kim
hamlet, VinhSon commune, VinhThanh Dist, BinhDinh Province

Bui Van Luong Resume Page 7 of 10


5. PROFESSIONAL SKILL
Project Management + Knowledge in respect of building materials for exterior and interior
for all project stages : decoration.
Analysis to structural + Knowledge aspect of Fidic contract especially design by employer form
solutions, Manage the (RedBook 1987, RedBook 1999)
project contracts, + Manage all designers example Architect, Structure and MEP design
perform QA/QC + Divide a large project into the work packages in accordance with each
system, Control cost contractor ability and manage them by the contract.
and schedule, + Estimate cost and control cost in the project execution stage during time
Inspecting Consultant + Prepare tender document and conduct procurement for each work
package
Civil Work and + Carry out procedures of inspecting the construction site
Finished work + Inspecting and checking and taking over the buildings from contractors
4C. PROFESSIONAL + Inspecting and warning the contractor about technical errors/ issues,
safety issues regarding the operation of machines and equipments at
the site, and above all ensuring the labor safety at the site as well as
the their late Schedule.
+ Checking and confirming the interim payment certificate and final
payment certificate as per contract.
+ Working in structure, finishing, and fit out work of the different projects.

+ Managing the HSE matters and warning the factors cause accident on
site.