Submission time: At least 4 Weeks before piling work.

1. List of Equipment:
1. Cranes
2. Drills
3. Augers
4. Bailing Buckets.
5. Final Cleaning Equipment
6. De-sanding Equipment
7. Slurry Pumps
8. Sampling Equipment
9. Tremies or Concrete Pumps
10. Casing Dimensions, Materials and Splice
2. Construction Sequence
1. Sequence of boring
2. Pile construction sequence in group
3. Boring Methods and final dimensions of the holes
4. Methods of slurry mixing, circulation, De0-sanding and disposal.
5. Reinforcement placement including support and centralization methods
6. Concrete placement, curing and protection
7. Concrete mixes and mitigation of possible slump loss during placement.

Boring log: