PROJECT EXPERIENCES
BRIDGE & HIGHWAY
BRIDGE Experience
MAJOR BRIDGE EXPERIENCE
COMPLETION Total Length
PROJECT NAME LOCATION
DATE (M)
Incheon Grand Bridge approach Road Project Section3 (Sea Link Bridge) Korea 2009 2,180
Young Heung Cable Stayed Bridge & Access Road (Sea Link Bridge) Korea 2001 1,800
Penang Bridge Packages 3,4 & 5 (Cable Stayed Sea Link Bridge) Malaysia 1985 7,600
A. OWNER :
Ministry of Public Works
B. DATE OF COMPLETION :
Sep, 2020
C. WORK DESCRIPTION :
Cable Suspension Bridge
Total L = 2,750m
(216m + 1,055m + 1,155m + 324m)
B = 19.8m ( 4 Lanes )
Approach Road : 1,660 m
Main Cable : PPWS
(127 Wires x 60 Strands)
A. OWNER :
Ministry of Public Works, Kuwait
B. DATE OF COMPLETION :
Nov, 2018
C. WORK DESCRIPTION :
Asymmetry Cable Stayed Bridge : 365 m
PSC Box Girder Bridge : 36km
(Shuwaikh Port ~ Subiyah New Town)
Span Length : 35 ~ 60m, 6 lanes
A. OWNER :
UNRA
(Uganda National Road Authority)
B. DATE OF COMPLETION :
Jun, 2017
C. WORK DESCRIPTION :
Cable Stayed Bridge
L = 525m , B = 22.9m
Height of Pylon : H = 80m
Approach Road : 2,105M
A. OWNER :
Infrastructure Management of Seoul,
KOREA
B. DATE OF COMPLETION :
Apri, 2016
C. WORK DESCRIPTION :
Suspended Steel Arch Bridge
Total L=1,269m, B=34~44m(4~6 lanes)
– Continuous 3spans Steel Arch Bridge: 323m
Approach Bridge: L=810m, B=24~44m /
Steel Orthotropic Box Girder
Pier & Foundation:
– Inclined V gate Type Pier
– Direct In situ Foundation
– Dia.1200: 222nos / Dia.1000: 432nos
A. OWNER :
ICTAS-Astaldi JV(ICA)
B. DATE OF COMPLETION :
Aug, 2016
C. WORK DESCRIPTION :
Cable-stayed-suspension hybrid
Bridge Total L=2.2km
Main Span L=1.4km, Pylon H=322m
Width=54.4m(Road 8 lanes + Railway 2
lanes)
A. OWNER :
Ulsan Harbor Bridge Corporation,
Korea
B. DATE OF COMPLETION :
May, 2015
C. WORK DESCRIPTION
Suspension Bridge
Total Length = 5.615km
Main Bridge : L=1,800m
(The 3rd largest single span
suspension Bridge)
Yeompo Tunnel : 1,555m (3nos)
A. OWNER :
Iksan Regional Construction and
Management Office, Korea
B. DATE OF COMPLETION :
Dec, 2013
C. WORK DESCRIPTION :
Extradosed PSC Bridge
Total L=1,060m, B=20m
Multi Extradosed Bridge: 325m, Main Span:
155m
Steel Caisson: 7 Nos
Steel Tubular Pile (dia. 1500): 780m
A. OWNER :
Iksan Regional Construction and
Management Office, Korea
B. DATE OF COMPLETION :
Feb, 2013
C. WORK DESCRIPTION
Cable Stayed Bridge
Total L=4.2Km, B=20.9-24.5m, 8 Lanes
Main Cable Stayed Bridge: L=900m
Approach Bridge: 2,160m
Foundation
– Caisson: 30m x 22m x 33m(H), 4nos
– Steel Tubular Pile
A. OWNER :
Seoul Regional Construction and
Management Office, Korea
B. DATE OF COMPLETION :
Dec, 2013
C. WORK DESCRIPTION :
L=6.296Km (B=27.0m)
Bridge: 17 Nos (3,596m)
Kyunganchun Bridge: 1,349m
(Extradosed + PC Box Girder)
Tunnel: 1 No (2,340m) (NATM)
Bored Piles: 52 Nos, 15m dia, 26mL
A. OWNER
Jeolla-namdo Office, Korea
B. DATE OF COMPLETION
Dec, 2012
C. WORK DESCRIPTION
Suspened Bridge: L=2260m
Total L=2.26Km, B=25.7m, 4 Lanes
Foundation :
– Steel Tubular Pile - Dia 3m x 30m(H), 84nos
Pylon :
– Concrete - 47694m3,
– Steel Rebar - 8672 ton
Main cable : Dia 5.35mm x 12800EA
A. OWNER :
Iksan Regional Construction and
Management Office, Korea
B. DATE OF COMPLETION :
Dec, 2012
C. WORK DESCRIPTION :
Total L=7.2Km, B=20-23.4m, 8 Lanes
Mooyoung Grand Bridge:
– Multi Span Extradozed Bridge
– L=860m, W=26.6m
Haksan 1st Bridge: PSC BEAM Bridge
– L=319m, W=24.3m
Mangwol Cheon Bridge : Steel Box Girder
Bridge
– L=295m, W=20.88m
A. OWNER :
Iksan Regional Construction and
Management Office, Korea
B. DATE OF COMPLETION :
Apr, 2012
C. WORK DESCRIPTION :
Cable Stayed Bridge: 1,116m
Total Length: 2,298m
Approach Bridge: 912m(72+7@120)
Sorok Bridge: 270m(V type PSC Slab)
Sorok Tunnel: L=415m
Keumjin Tunnel: L=255m
A. OWNER :
Busan City , Korea
B. DATE OF COMPLETION :
Dec, 2011
C. WORK DESCRIPTION :
Cable Stayed Bridge
Total L=1.544Km, B=27.85m, 4~6 Lanes
Hwa-Myung Bridge: Cable Stayed Bridge
– Main Cable Stayed Bridge: L=500m
– Approach Bridge: 1,044m
Foundation
– Drilled shaft Pile(Φ1200~2500)
A. OWNER :
Korea Highway Corp. Korea
B. DATE OF COMPLETION :
October, 2009
C. WORK DESCRIPTION :
Length : 2.18km, Width : 24.3m(4Lane)
PSC(MSS) type Bridge
In situ Concrete Pile Foundation
(D2,500~D1,000 254Nos)
A. OWNER :
Machang Bridge Company , Korea
B. DATE OF COMPLETION :
Jun, 2008
C. WORK DESCRIPTION :
Cable Stayed Bridge: 740mL
1,700m Length, 21m Width, 4 Lanes
Approach Bridge (Composite Steel Box
Bridge) : 960m
Superstructure : Composit Steel Box :
1700m
A. OWNER :
Municipality of Seoul
B. DATE OF COMPLETION :
December, 2005
C. WORK DESCRIPTION :
Expansion of existing bridge & Construction
Steel Box structure
L=1,389m, B=27.75m
A. OWNER :
Municipality of Seoul
B. DATE OF COMPLETION :
November, 2005
C. WORK DESCRIPTION :
Steel Box structure
New Bridge: B=25.5 m, L=916 m
Interchange: 7 nos, 4,945m
Well foundation: New 30 nos, Fix 19 nos
A. OWNER :
Korea High Speed Rail Construction
Authority
B. DATE OF COMPLETION :
December, 2001
C. WORK DESCRIPTION :
Concrete Girder Bridge
L = 7,685m
Superstructure
– PSM=214 Spans / MSS=34 Spans / FSM=48
Spans
Substructure
– Caisson Pile : 29 Nos. / Steel Pile : 181 Nos
– Mat Foundation : 49 Nos
A. OWNER :
Korea Electric Power Corp.
B. DATE OF COMPLETION :
December 2001
C. WORK DESCRIPTION :
Total 1,800m
Yundo Bridge ; 1,250m (9,691Tons)
– Steel Cable Stayed Bridge : 460m (3,978Tons)
– Steel Box Girder Bridge : 790m (3,573Tons)
– Pylon (2Nos) : 40m high from Bridge Surface
Yunyuk Bridge ; 550m (2,262Tons) Steel Box
Girder
A. OWNER :
Municipality of Seoul
B. DATE OF COMPLETION :
December, 2001
C. WORK DESCRIPTION :
Steel Plate Girder Bridge
Main Bridge ; 1,602m Length (4~6 Lanes)
Superstructure
– Steel Plate Girder : 25,780 Tons
Substructure
– Caisson Pile : 42 Nos.
– Steel Pile : 604 Nos.
– In-Situ-Concrete Pile : 64 Nos.
A. OWNER :
Jamuna Multipurpose Bridge Authority
B. DATE OF COMPLETION :
June 1998
C. WORK DESCRIPTION
Precast Segment Bridge
Main Bridge : 18.5m (W), 4,800m (L)
Approach Viaduct : 18.5m (W), 128m (L)
Superstructure ;
– Precast Segment (W=18.5m, L=4.0m) ; 1,214 ea
Substructure
– Steel Pile : 121 Piece (23,756 Ton)
– 3 Pile Pier (63 Nos.) : Dia. 2.50m, Length 82m
– 2 Pile Pier (58 Nos.) : Dia. 3.15m, Length 82m
A. OWNER :
Malaysia Highway Authority, Ministry
of Public Works & Utilities
B. DATE OF COMPLETION :
September 1985
C. WORK DESCRIPTION :
Cable Stayed Bridge
Main Span : 440m (6 Lane)
Approach Span : 7.6Km (4 Lane)
Superstructure ;
– Prestressed Concrete Bridge : 1.8Km + 3.9Km
– Concrete Cable Stayed Bridge : 440m
– P.C.Beam : 1,950 Nos. (1.98m x 40m)
Substructure ;
Precast Concrete Pile : 6,218 Nos. (Dia.
0.4~1.0m)
HIGHWAY Experience
MAJOR HIGHWAY EXPERIENCE (OVERSEAS)
PROJECT
PROJECT NAME LOCATION Length (Km)
COMPLETION
Link Roads to the Pearl - Qatar (Lusail Expressway Package 1) Qatar 2015 5.8
First Ring Road-Istiqlal Interchange & Mirqab Approach Road Kuwait 1994 28.3
Expressway No.1 Between Rutba & Jordan Border & Syrian Border Iraq 1987 132.0
Sixth Ring Motorway – Central & Western Section Kuwait 1984 53.0
A. OWNER :
CHEC+GDC+GALFAR JV
DATE OF DESCRIPTION :
Nov. 2014
C. WORK DESCRIPTION :
Ground Fill-up: 9,300,000 m3
(Road and Railway)
Ground Improvement and Slope Protection
HIGHWAY
A. OWNER :
Public Works Authority (ASHGHAL)
DATE OF DESCRIPTION :
Sep. 2015
C. WORK DESCRIPTION :
Road : 5.8 Km
– Tunnel : 7 units (6.1km)
– Underpass / Flyover : 3 units
– Bridge : 4 units
Pumping Station : 2 Nos
Electrical substation : 2 Nos
Utilities / Artscape
HIGHWAY
DATE OF DESCRIPTION :
Oct. 1994
C. WORK DESCRIPTION :
First Ring Road : 12.8 Km
– Over/Foot Bridge : 2/2 units
– Underpass : 2 units
Mirqab Road : 16.5 Km
– Pedestrian Subway : 2 units
– Over/Foot Bridge : 4/3 units
HIGHWAY
B. DATE OF COMPLETION :
Jul. 1993
C. WORK DESCRIPTION :
Sungai Petani - Sungai Dua
– 22.2km, 26.5km Width (4 Lanes)
– Interchange : 1 unit
Pagoh - Yongpeng
– 20km (4 Lanes)
– Bridge : 12 units(1,034m)
HIGHWAY
A. OWNER :
Ministry of Public Works
B. DATE OF COMPLETION :
Mar. 1988
C. WORK DESCRIPTION :
21Km, 9 Crossroads
Bridge: 9 Nos
Fly Overs: 6 Nos
HIGHWAY
B. DATE OF COMPLETION :
Oct. 1987
C. WORK DESCRIPTION :
132 Km, 27.3~42.5m Width
Interchange : 2 units
Bridge : 22 units (1.78km)
Runway : 1 unit
Rest House : 3 units
HIGHWAY
B. DATE OF COMPLETION :
Jun. 1984
C. WORK DESCRIPTION :
8 Lane Carriage Way : 3,720m
6 Lane Carriage Way : 36 Km
4 Lane Carriage Way : 1,850m
3 Lane Carriage Way : 420m
1, 2 Lane Carriage Way : 11,000m
Bridge : 21 units
HIGHWAY
B. DATE OF COMPLETION :
Aug. 1980
C. WORK DESCRIPTION :
17 Km
Unclassified Excavation:7,253,600m3
MAJOR HIGHWAY EXPERIENCE (DOMESTIC)
PROJECT
PROJECT NAME LOCATION Length (Km)
COMPLETION
The 3rd KyungIn Express way Section 4 Project Korea 2010 4.5
Expressway Between Seoul & Chuncheon, Section 3 Project Korea 2009 6.8
Road Project Between Dong Eup & Hanrim Korea 2009 12.0
Expansion to 4 lane Road project between Seonsan & Dogae Korea 2009 4.6
Expressway between Seoul and Chuncheon, Section2 Project Korea 2009 9.2
Expressway between Seoul and Chuncheon, Section5 Project Korea 2009 7.3
PROJECT
PROJECT NAME LOCATION Length (Km)
COMPLETION
Exprssway Between Gochang and Damyang Section 1 Project Korea 2006 10.2
1st Express way Expansion Section 6 Between Dongdaegu and Kumi Project Korea 2003 9.8
A. OWNER :
Seoul Regional Construction and
Management Office
B. DATE OF COMPLETION :
Mar, 2012
C. WORK DESCRIPTION :
L=6.296Km (B=27.0m)
Bridge: 17 Nos (3,596m)
Tunnel :NATM, L= 2,340m
HIGHWAY
A. OWNER :
Public Procurement Service, Korea
B. DATE OF COMPLETION :
Oct, 2012
C. WORK DESCRIPTION :
L=9.1Km (B=20.0m, 4 lanes)
Bridge: 806m
Tunnel :NATM, L= 1,412m(2 nos)
Earth Work: 2,437,986m2
Drainage Work: 2,768m(10 nos)
Culvert: 1,145m (28 nos)
HIGHWAY
A. OWNER :
The 3rd KyungIn Expressway co.
B. DATE OF COMPLETION :
Aug. 2010
C. WORK DESCRIPTION :
Total Length : 4.482km, Width : 23.4~30.6m
Bridge : 537
Pavement
a) Asphalt Pavement : 131,000ton
b) Concreate Pavement : 26,000m3
Tunnel : 405m (NATM)
HIGHWAY
A. OWNER :
Incheon Metro Politan City
B. DATE OF COMPLETION :
Mar. 2010
C. WORK DESCRIPTION :
Total Length:5.92km, Width:25.1m(6 Lanes)
Bridge (Length : 190m, Width:31.5m)
HIGHWAY
A. OWNER :
Seoul-chuncheon Expressway Co.
B. DATE OF COMPLETION :
Aug. 2009
C. WORK DESCRIPTION :
Length : 6.8km, Width : 23.5m
Bridge: 10 Nos.
Tunnel : NATM, 680m × 2 Line
HIGHWAY
A. OWNER :
Public Procurement Service
B. DATE OF COMPLETION :
Dec, 2009
C. WORK DESCRIPTION :
Length : 12.03Km, Width : 20m (4Lane)
Intersection: 6 nos.
Bridge: 9 nos.
Soil Improvement: 3.2km
HIGHWAY
A. OWNER :
Pusan Regional Construction
Management Office
B. DATE OF COMPLETION :
Dec, 2009
C. WORK DESCRIPTION :
Length : 4.641km (Including Bridge 971m),
Width : 18.5m
Intersection: 2 nos.
HIGHWAY
A. OWNER :
Seoul-chuncheon Expressway Co.
B. DATE OF COMPLETION :
Aug. 2009
C. WORK DESCRIPTION :
Total Length : 9.16km
Bridge : 921m
Tunnel : NATM
a) Length : 4,511m (Tunnel : 3Nos.)
Pavement (T=1.04m, SMA Pavement)
a) Concrete : 70.851m2(6Line)
b) Ascon : 2.361a
HIGHWAY
A. OWNER :
Seoul-Chuncheon Expressway Co.
B. DATE OF COMPLETION :
Aug. 2009
C. WORK DESCRIPTION :
Total Length : 7.26km, Width : 23.4m
Bridge : 675m
Tunnel : 3.322Km (NATM)
Pavement : 101,835 Ton
HIGHWAY
A. OWNER :
Kyungsangnamdo.
B. DATE OF COMPLETION :
May. 2008
C. WORK DESCRIPTION :
Total Length : 5.58km, Width : 20m
Bridge : 4Nos (3,287m)
Tunnel (H=7.78m, W=12.582m)
Pavement :
a) Concrete : 8,370 m3
b) Asphalt Con'c : 81,847 ton
HIGHWAY
A. OWNER :
Ministry of Construction &
Transportation
B. DATE OF COMPLETION :
Feb. 2006
C. WORK DESCRIPTION :
7.393Km (8 Lanes)
Bridge: 6 Nos
Tunnel Works: 2,177m + 995m
HIGHWAY
A. OWNER :
Korea Highway Corp. Korea
B. DATE OF COMPLETION :
Dec. 2006
C. WORK DESCRIPTION :
Length : 10.2Km
Bridge : 1.167Km
Tunnel : 5.843Km (NATM)
HIGHWAY
A. OWNER :
Korea Highway Corp. Korea
B. DATE OF COMPLETION :
Dec. 2005
C. WORK DESCRIPTION :
Total Length : 10.645KM, B=23.4M
Pavement Works
a) Concrete : 53,887 M3
b) Ascon : 24,715 Ton
Bridge Works : 1.142Km
HIGHWAY
A. OWNER :
Korea Highway Corp. Korea
B. DATE OF COMPLETION :
Dec. 2004
C. WORK DESCRIPTION :
Total Length : 4.9KM, B = 30.6M
Pavement Works
a) Concrete : 29,442 M3
b) Ascon : 156a
Bridge : 1.27 KM
Tunneling Works : 1.69Km(NATM)
HIGHWAY
B. DATE OF COMPLETION :
Dec. 2003
C. WORK DESCRIPTION :
Total Length : 9.76km,
Bridge : 937m
Pavement
a) Concrete Pavement : 76,760 m3
b) Asphalt Concrete Pavement : 1,301a
HIGHWAY
A. OWNER :
Korea Highway Corp
B. DATE OF COMPLETION :
Dec. 2002
C. WORK DESCRIPTION :
5.04Km x 23.4m Width (4 Lanes)
Bridge: 350m x 4 Nos
Tunnel Work: 855m x 1 Nos
Pavement Works
HIGHWAY
Cheonan-Nonsan Highway
A. OWNER :
Seoul Regional Construction and
Management Administration
B. DATE OF COMPLETION :
Dec. 2002
C. WORK DESCRIPTION :
Double way 4 line : (W=23.4m, L=80.96km)
Bridge : 6 Nos. ( Total : 115 Nos.)
Tunnel : 2 Nos. ( Total : 4 Nos.)
Con'c Pavement : 61,000 m3
HIGHWAY
A. OWNER :
Korea Highway Corp.
B. DATE OF COMPLETION :
Dec. 1999
C. WORK DESCRIPTION :
4.6Km, 23.4mWidth (4 Lanes)
Bridge Works: 150m x 13.7m Width
Tunnel Works: 3.3Km x 7.5mWidth
(2 Lanes)