PERFIL EXPEDIENTE
COMPONENTE VARIACION
APROBADO TECNICO
8,800,716.00
75,866.00
5,102,550.00
2,587,568.00
22,258.00
623,060.00
194,708.00
194,706.00
8,800,716.00 5491964
#REF!
3525897.31
961475.04
424799.13
421040.98
94117.21
62291.01
1021871.5
343852
6855344.18
PERFIL TECNICO
ITEM DESCRIPCION UND METRADO PRECIO PARCIAL TOTAL ITEM
PAVIMENTO FLEXIBLE
1 OBRAS PROVISIONALES 22,579.00 1
1.05
3 EXPLANACIONES 512,534.55 3
4 PAVIMENTOS
MEJORAMIENTO DE MATERIAL DE
4.01 131,620.00 5
SUBRASANTE
9.01
9.03
9.04
11
11.01
11.02
11.03
DRENAJE 191,235.00 12
13.03
14
14.01
14.02
14.03
15
15.01.01
15.01.03
15.01.04
15.01.05
ENCOFRADO Y DESENCOFRADO DE
M2 482 29 13,978.00 15.03.01
CANALIZACION
TARRAJEO DE INTERIORES C/
M2 458 27 12,366.00 15.05.01
IMPERMEABILIZANTES
15.02
15.04
15.04.01
15.04.02
12.1
12.2
9 JUNTAS 4,548.00 9
12 VARIOS 147,341.00
VEREDAS DE CONCRETO
2.01 EXCAVACION MANUAL PARA SARDINEL EXPUESTO M3 427.5 23.09 9,870.98 2.02
2.02 SARDINEL EXPUESTO CONCRETO FC= 175 KG/CM2 M3 427.5 326.87 139,736.93
5.03
4 RAMPAS 4,730.16
5 JUNTAS 8,930.58 6
5.01 JUNTAS DE DILATACION M3 3558 2.51 8,930.58 6.01
10
11.03
PAVIMENTO FLEXIBLE
OBRAS PROVISIONALES 114,918.00
EXPLANACIONES
MEJORAMIENTO DE SUBRASANTE
251,146.47
CANALIZACION 55,021.27
JUNTAS 7,977.12
VARIOS 154,518.98
VEREDAS DE CONCRETO
RAMPAS 6,671.83
JUNTAS 15,876.25
RELLENO DE JUNTAS CON ASFALTO M 4123.7 3.85 15,876.25
SUPERVISION 2% 74,575.75
276.00
5,800.00
-1,496.00
-96,318.00
-28,754.03
-18,631.67
44,882.35
-101,079.84
-34,148.09
-13,834.73
420.00
-1,646.72
8,188.00
407.76
-1,991.16
723.60
-17,532.04
-134,452.16
-45,713.09
-72,499.63
-47,026.84
35,300.38
-47,026.84
20,828.38
-41,174.94
-22,367.09
725,304.69
-2,524.66
-8,167.16
-315.40
-179.57
-126,244.26
-76,550.97
-10,653.15
-4,258.20
-11,621.38
0.00
-14,793.75
39,477.74
-10,760.12
1,219.41
-691.41
-6,316.96
-90,295.69
-2,131.69
-1,066.20
-1,716.46
-2,830.81
-48.47
-483.62
-8,436.36
6,213.72
-1,284.47
-15,689.14
8,851.54
144.00
600.00
-1,102.68
-162.32
-1,248.78
-124.56
-149.79
0.00
-3,429.12
-9,472.31
-9,200.95
-12,710.86
-749.92
372.00
372.00
372.00
-10,981.32
-25,443.81
-5,839.89
-20,058.78
5,242.82
-16,170.00
17,586.00
23,418.00
4,757.00
7,407.08
-1,949.46
-2,812.00
-9,668.64
-10,488.74
6,056.60
-1,539.79
9,870.98
139,736.93
62,443.50
-14,223.00
-68,419.54
-363,481.65
263,990.51
-1,614.83
-326.83
-6,945.67
-72,693.92
-243,142.20
176,865.23
0.00
0.00
-27,770.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PERFIL VIABLE EXPEDIENTE TÉCNICO
DESCRIPCION UND METRADO DESCRIPCION
JUNTAS JUNTAS
JUNTAS DE DILATACION M 1516 RELLENO JUNTAS DE DILATACION
SEÑALIZACION HORIZONTAL SEÑALIZACION HORIZONTAL
PINTURA EN SARDINEL Y/O BORDE DE VIA M2 14250 PINTURA LINEAL EN SARDINELES
PINTURA ZONAL CRUCE PEATONAL M2 326 PINTURA ZONAL CRUCE PEATONAL
PINTURA INTERMEDIA DISCONTINUA EN CENTRO DE
PINTURA INTERMEDIA DISCONTINUA - CENTRO DE VIA M2 1900
VIA
PINTURADES SIMBOLOS Y FLECHAS M2 81 PINTURA SIMBOLOS Y FLECHAS
SEÑALIZACION VERTICAL
SEÑALES REGLAMENTARIAS UND 2
SEÑALES PREVENTIVA UND 2
SEÑALES INFORMATIVA UND 2
VARIOS VARIOS
SEÑALIZACION VERTICAL
SEÑALIZACION VERTICAL TIPO I
LIMPIEZA DE FONDO DE CANAL
LIMPIEZA FINAL DE OBRA
MES 12 0
UND 2 0
UND 4 0
GBL 1 0
GBL 1 1
M2 22,005.13 2055.13
M2 22,005.13 2055.13
-9980
M3 15,251.67 12258.67
0
M3 1458.19 550.19
M3 366.58 366.58
-21
M3 391.01 -178.99
-356
M3 16.62 -28.38
M3 52.76 52.76
M3 2,856.46 481.46
M3 21,921.04 3331.04
M3 21,921.04 3331.04
M2 21,895.93 1945.93
M3 4379.19 2086.19
M2 21895.93 1945.93
M3 4379.19 -608.81
M2 21895.93 1945.93
M3 4084.38 -903.62
M2 20421.9 471.9
M2 17819.16 -230.84
M2 17819.16 -230.84
M2 82.83 82.83
M3 17.27 17.27
UND 38 38
M2 86.33 86.33
M2 5777.53 5421.53
M3 410.79 -1964.21
M2 237 237
KG 801.92 801.92
M3 29.1 29.1
M3 391.01 11.01
M2 410.31 -1014.69
M3 66.48 21.48
M2 67.01 -38.99
M2 332.41 332.41
M2 204.83 204.83
M3 211.06 211.06
M2 1055.29 1055.29
M3 25.04 25.04
M3 83.46 47.46
M3 139.38 139.38
M 10.7 10.7
M2 33.17 33.17
M3 25.13 18.13
M2 134.82 -347.18
KG 1809.17 232.17
M3 83.46 63.46
M2 84.32 -373.68
-9
-2
M2 32.74 32.74
M 42.16 42.16
M 42.16 42.16
M2 4.26 4.26
M3 0.43 0.43
M 2071.98 555.98
M 4887.67 -9362.33
M2 515.63 189.63
M 2366.13 466.13
M2 60.8 -20.2
-2
-2
-2
UND 231 21
UND 231 21
UND 231 21
UND 231 21
GBL 1 -12
UND 45 -1
-18
-6
-67
M2 22005.13 2055.13
GLB 2 1
GBL 1 0
M2 8068.26 -481.74
M2 8068.26 8068.26
M2 333.33 333.33
M3 1609.95 1609.95
M3 40.8 -386.7
M3 2110.11 2110.11
M3 2110.11 2110.11
M3 2110.11 2110.11
M3 7868.26 7868.26
-427.5
-2850
-7837.5
M3 786.83 3.08
M2 7868.26 30.76
M2 7782.76 6999.01
M2 675.01 -274.99
M2 7782.76 7782.76
M2 163.2 163.2
KG 557.31 557.31
M3 20.16 20.16
M3 14.03 4.3
M2 42.06 10.34
M 4123.7 565.7
M2 280 280
KG 1142.4 1142.4
M3 32.4 32.4
UND 48 48
UND 67 67
0
UND 29 29
M 75 75
M2 8068.26 8068.26
M2 214.21 54.79
M2 1321.69 215.39
-3882.63
M2 400.34 400.34
PERFIL TECNICO
ITEM DESCRIPCION UNIDAD METRADO PRECIO PARCIAL TOTAL
PAVIMENTO FLEXIBLE
OBRAS PROVISINALES 7766.11
ALMACEN Y CASETA DE GUARDIANIA MES 3 500 1500
CARTEL DE IDENTIFICACION DE OBRA UNIDAD 2 1200 2400
SEÑALIZACION DE SEGURIDAD Y DESVIACION VIAL UNIDAD 1 366.11 366.11
MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1 3500 3500
EXPLANACIONES 3808.73
ESCARIFICADO, PERFIL Y COMPACTADO DE NIVEL DE CM2 1133.55 3.36 3808.728
JUNTAS 429.44
RELLENO DE JUNTAS CON ASFALTO M 109.83 3.91 429.4353
SEÑALIZACION VERTICAL
SEÑALES INFORMATIVAS TIPO 01 und 2 264.9 529.8 529.80
VARIOS 8455.06
RECONEXION DE INSTALACIONES DE DESAGUE UND 25 75.41 1885.25
RECONEXION DE INSTALACIONES DE AGUA POTABLE UND 25 66.21 1655.25
ENCIMADO DE BUZONES UND 4 800.4 3201.6
LIMPIEZA FINAL DE OBRA M2 1244.96 0.45 560.232
PLACA RECORDATORIA GLB 1 1152.73 1152.73
MITIGACION AMBIENTAL
COSTOS AMBIENTALES GLB 1 2000 2000 2000.00
VEREDAS DE CONCRETO
ACERA PEATONAL
TRABAJOS PRELIMINARES 8129.64
TRAZO Y REPLANTEO PRELIMINAR M2 564.33 1.16 654.62
TRAZO Y REPLANTEO DURANTE LA EJECUCION M2 564.33 1.16 654.62
DEMOICIN DE VEREDAS EXISTENTES M3 15.36 145.09 2228.58
DEMOLICION DE MURO DE ADOBE M3 38.17 45.57 1739.41
REPOSICION DE MUROS M2 95.43 29.89 2852.40
RAMPAS 508.94
ENCOFRADO Y DESENCOFRADO NORMAL EN RAMPAS M2 2.64 29.4 77.62
CONCRETO EN RAMPAS F´C=175 KG/CM2 (INC. ACABAM3 1.09 395.71 431.32
JUNTAS 712.79
RELLENO DE JUNTAS CON ASFALT M 182.3 3.91 712.79
4,141.19
TRAZO Y REPLANTEO m2 1,386.65 1.01 1,400.52 -192.91
TRAZO Y REPLANTEO DURANTE LA OBRA m2 1,386.65 1.34 1,858.11 -650.50
CARTEL DE SEÑALIZACION PARA DESVIO DE TRANSIu 2.00 441.28 882.56 -882.56
MOVIMIENTO DE TIERRA 7,064.34
CORTE DE TERRENO CON MAQUINARIA A NIVEL D m3 576.98 8.15 4,702.39 378.28
CORTE DE TERRENO CON MAQUINARIA P/MEJ. DE m3 138.66 7.53 1,044.11 -912.59
CORTE DE TERRENO MANUAL R=2 m3/día m3 28.85 42.86 1,236.51 2,052.53
1,062.00
1,132.95
EXCAVACION MANUAL PARA BADEN m3 2.20 36.97 81.33 -18.68
ELIMINACION DE MATERIAL EXCEDENTE 14,665.93
ACARREO MATERIAL PARA ELIMINACIÓN m3 37.25 57.71 2,149.70 -48.14
CARGUIO DE MATERIAL PARA ELIMINACIÓN m3 896.03 3.62 3,243.63 2,672.67
(TRANSPORTE) ELIMINACION DE MATERIAL EXCE m3 896.03 6.28 5,627.07 365.73
PERFILADO Y COMPACTADO A NIVEL DE CORTE m2 1,375.67 2.65 3,645.53 -3,645.53
3,808.73
9,918.56
3,774.72
DRENAJE 14,664.57
ENCOFRADO Y DESENCOFRADO NORMAL EN CUNETm2 78.87 36.20 2,855.09 -1,977.94
CONCRETO f'c=210 kg/cm2 PARA CUNETA m3 31.55 374.31 11,809.48 -765.63
BADEN
CONCRETO f'c=210 kg/cm2 PARA BADEN m3 2.20 379.72 835.38 1,111.61 -578.48
ENCOFRADO Y DESENCOFRADO NORMAL EN BADENm2 6.46 42.76 276.23 1,071.67
32.27
JUNTAS 5,561.36
RELLENO DE JUNTAS ASFALTO m 1,094.42 3.14 3,436.48 -3,007.04
JUNTA DE CONSTRUCCION CON TEKNOPORT m2 180.38 11.78 2,124.88 -2,124.88
SEÑALIZACION HORIZONTAL 3,000.68
5,102.86
PINTURA ZONAL (CRUCE PEATONAL) m2 54.30 30.12 1,635.52 1,005.78
PINTURA LINEAL DISCONTINUA EN EJE DE VIA m 183.50 5.17 948.70 648.23
PINTURA DE SIMBOLOS - FLECHA m2 21.85 19.06 416.46 -291.81
529.80
VARIOS 1,311.71
1,885.25
1,655.25
3,201.60
LIMPIEZA FINAL DE LA OBRA m2 1,386.65 0.68 942.92 -382.69
PLACA RECORDATORIA u 1.00 368.79 368.79 783.94
MITIGACION AMBIENTAL 2,000.00
IMPACTO AMBIENTAL GLB 1.00 2,000.00 2,000.00 0.00
VEREDAS 42,437.55
1,835.31
REFINE Y NIVELACION EN VEREDAS m2 796.04 2.45 1,950.30 2,882.69
RELLENO Y COMPACTACION DE BASE DE VEREDA m2 796.04 8.01 6,376.28 -6,376.28
RAMPAS 512.69
ENCOFRADO Y DESENCOFRADO NORMAL EN RAMm2 3.08 37.46 115.38 -37.76
CONCRETO f'c=175 kg/cm2 PARA RAMPA m3 1.04 382.03 397.31 34.01
JUNTAS 450.28
RELLENO DE JUNTAS ASFALTO m 143.40 3.14 450.28 262.51
PERFIL TECNICO
ITEM DESCRIPCION UND METRADO PRECIO PARCIAL TOTAL ITEM
PAVIMENTO RIGIDO
01 OBRAS PROVISIONALES 7,770.00 01
01.01.00 ALMACEN Y CASETA DE GUARDIANIA mes 3.00 500.00 1,500.00 01.01
01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 2.00 1,200.00 2,400.00 01.02
01.03.00 SEÑALIZACION DE SEGURIDAD Y DESVIACION VIAL und 1.00 370.00 370.00 01.03
01.04.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.00 3,500.00 3,500.00
02.02.00 TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA m2 1,244.96 0.97 1,207.61 02.03
04 EXPLANACIONES 3,808.73 04
ESCARIFICADO, PERFIL Y COMPACTADO DE NIVEL DE
04.01 m2 1,133.55 3.36 3,808.73 04.01
CORTE
05.00.00 MEJORAMIENTO
MEJORAMIENTODEDE
SUELOS
SUELOS 9,431.14
PREPARACION Y MEJORAMIENTO DE CAPA DE
05.01.00 m2 1,133.55 8.32 9,431.14
SUBRASANTE
07
07.03.00 JUNTA TRANSVERSAL DE EXPANSION kg 670.46 7.54 5,055.27 5,055.27 07.01
04
09.00.00 SARDINEL EXPUESTO 19,780.16 04.01
09.01.00 SARDINEL EXPUESTO ENCOFRADO Y DESENCOFRADO m2 236.29 28.15 6,651.56 04.01.01
08
10.00.00 DRENAJE CUNETAS 13,505.29 08.01
10.01.00 ENCOFRADO Y DESENCOFRADO EN CUNETAS m2 87.44 28.15 2,461.44 08.01.01
10.02.00 CONCRETO F`C =210 KG/M2 PARA CUNETAS+ACABADO m3 27.77 397.69 11,043.85 08.01.02
08.01.03
08.01.04
11
13.00.00 SEÑALIZACION HORIZONTAL 8,576.32 11.01
13.01.00 PINTURA LINEAL EN SARDINEL m 375.21 13.60 5,102.86 11.01.01
13.02.00 PINTURA ZONAL CRUCE PEATONAL m2 52.00 33.69 1,751.88 11.01.04
13.03.00 PINTURA INTERM. DISCONT. CENTRO DE VIA m 185.69 8.60 1,596.93 11.01.02
13.04.00 PINTURA DE SIMBOLOS FLECHAS m2 3.70 33.69 124.65 11.01.03
12.02
ACERA PEATONAL
02
02.00.00 MOVIMIENTO DE TIERRAS 1,583.19 02.01
02.01.00 EXCAVACION MANUAL DE VEREDAS m3 41.95 37.74 1,583.19 02.01.01
02.01.02
04.02.00 VEREDA CONCRETO F`C=175 KG/CM2(INC. ACABADO) m3 42.74 397.91 17,006.67 04.02.02
05.02.00 CONCRETO EN RAMPAS F´C=175 KG/CM2 (INC. ACABADO) m3 1.09 395.71 431.32 04.03.02
04.03.03
04.03.04
06 JUNTAS 712.79 05
06.01.00 RELLENO DE JUNTAS CON ASFALTO m 182.30 3.91 712.79 05.01
07
07.01
07.02
07.03
ARIACIONES
FELIPE - AV. SAN CARLOS) Y JR. SAN FELIPE (TRAMO: JR. SANTA BEATRIZ - PSJE SAN JORGE) EN LA URBANIZACION SANTA BEATRIZ, DISTRITO DE
EXPEDIENTE TECNICO
VARIACION
DESCRIPCION UND METRADO PRECIO PARCIAL TOTAL
PAVIMENTO RIGIDO
OBRAS PROVISIONALES 5,585.69
ALMACEN Y CASETA DE GUARDIANIA mes 3.00 450.00 1,350.00 150.00
CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 5.40 m und 1.00 1,200.00 1,200.00 1,200.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 3,035.69 3,035.69 -2,665.69
3,500.00
-
TRABAJOS PRELIMINARES 6,877.79 -
LIMPIEZA DEL TERRENO MANUAL m2 1,386.65 0.46 637.86 -637.86
TRAZO Y REPLANTEO PRELIMINAR m2 1,386.65 2.10 2,911.97 -1,704.36
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA
m2 1,386.65 2.40 3,327.96 -2,120.35
OBRA
-
MOVIMIENTO DE TIERRAS -
CORTE DE TERRENO 8,982.78 -
CORTE DE TERRENO CON MAQUINARIA A NIVEL DE
m3 576.98 6.83 3,940.77 1,551.79
SUB RASANTE
131.52
CORTE DE TERRENO MANUAL m3 28.85 38.76 1,118.23 2,437.26
EXCAVACION MANUAL DE SARDINEL m3 31.55 38.76 1,222.88 -160.88
EXCAVACION MANUAL DE CUNETA m3 31.55 77.50 2,445.13 -1,312.18
EXCAVACION MANUAL DE BADENES m3 2.20 116.26 255.77 -193.12
-
ELIMINACION DE MATERIAL EXCEDENTE 20,327.46 -
ACARREO MANUAL DE MATERIAL DE CORTE m3 75.11 19.37 1,454.88 771.62
CARGUIO DE MATERIAL PARA ELIMINACION m3 767.49 6.22 4,773.79 1,609.71
TRANSPORTE DE MATERIAL PARA ELIMINACION m3 767.49 18.37 14,098.79 -8,073.62
-
EXPLANACIONES 4,814.85 -
ESCARIFICADO, PERFILADO Y COMPACTADO DE SUB
m2 1,375.67 3.50 4,814.85 -1,006.12
RASANTE
-
-
9,431.14
-
BASE GRANULAR 12,929.90 -
9,918.56
EXT. RIEGO Y COMPACTADO DE BASE GRANULAR E=0.20
m2 943.10 13.71 12,929.90 -9,155.18
M
-
PAVIMENTO RIGIDO 208,044.83 -
ENCOFRADO Y DESENCOFRADO DE PAVIMENTO m2 1,594.55 43.00 68,565.65 -62,855.15
CONCRETO f'c=210 kg/cm2 E=0.20 M m2 1,375.67 95.29 131,087.59 -37,193.38
ACABADO DE LOSA m2 1,375.67 5.77 7,937.62 -7,937.62
CURADO DE LOSA m2 1,375.67 0.33 453.97 -453.97
-
JUNTAS 7,266.16 -
ACERO LISO DE 3/4" EN LOSA kg 1,223.26 5.94 7,266.16 -2,210.89
-
OBRAS DE CONCRETO -
SARDINELES 24,177.90 -
ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 197.18 48.64 9,590.84 -2,939.28
2,525.75
-
-
3,138.12
253.95
-
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE VEREDAS M3 41.95 37.74 1583.193
VEREDA PEATONAL
VEREDA ENCOFRADO Y DESENCOFRADO M2 18.23 42.2 769.306
VEREDA CONCRETO F`C=175 KG/CM2(INC. ACABADO) M3 42.74 397.91 17006.6734
CURADO CON ARROCERAS EN VEREDAS M2 419.53 1.85 776.1305
RAMPAS
ENCOFRADO Y DESENCOFRADO NORMAL EN RAMPAS M2
CONCRETO EN RAMPAS F´C=175 KG/CM2 (INC. ACABADO) M3 2.64 29.4 77.616
1.09 395.71 431.3239
JUNTAS
RELLENO DE JUNTAS CON ASFALT M 182.3 3.91 712.793
MOBILIARIO URBANO
INSTALACION DE MOBILIARIO URBANO UND 2 442.79 885.58
VARIOS
RECONEXION DE CAJAS DOMICILIARIAS DE AGUA POTABLE UND 25 79.53 1988.25
RECONEXION DE CAJAS DOMICILIARIAS DE DESAGUE UND 25 101.03 2525.75
REUBICACION DE POSTES UND 4 784.53 3138.12
LIMPIEZA FINAL DE OBRA M2 564.33 0.45 253.9485
TOTAL
8129.64
1583.19
9399.99
6668.30
18552.11
508.94
712.79
885.58
7906.07
54346.6095