Function & Interlock Test Record For CPH Recirculation Pump
System & Location : CPH System
S.N System & Function Description Checked Result

CPH Recirculation Pump System equipment operation Manual & Auto Mode
from CCR. Local
1 Ok[ ]
1. CPH Recirculation Pump 1 (10FEU001PO) Operation
2. CPH Recirculation Pump 2 (10FEU002PO)
CPH Recirculation Pump Operation:
CPH Recirculation pump “A” & “B” is able to start from Control Room Local,
Remote
2 Remote (auto or manual) mode with start permissive. Ok[ ]
Operation
Start permissive conditions:
1.CPH Outlet Water Pressure is Not <4bar.
CPH Recirculation Pump
Manual starts AS Below If Any One Condition Satisfied
1.CCROperator Select From HMI Local & Field Operator Lcp Side push start
Push Button Without any Start permissive.
2. CCR Operator Select Remote, Manual & all start permissive condition satisfied
& Click Start Push Button From HMI.
Manual stops, AS Below If Any One Condition Satisfied Manual /
3 1.CCR Operator Select From HMI Local & Field Operator Lcp Side push stop Auto Start & Ok[ ]
Push Button. Stop
2. CCR Operator Select Remote, Manual & Click Stop Push Button From HMI.
Auto starts, AS Below Condition Satisfied
1.CCR Operator Select From HMI Auto & HRSG Start Up Command with Start
Permissive.
Auto stop, AS Below Condition Satisfied
1.CCR Operator Select From HMI Auto & HRSG Shutdown Command.

Pump Lead/Lag Operation:


Pump Change
4 - Lead/Lag selection (1Pump Lead-2 Pump Lag) Ok[ ]
Over
1.Stand by pump start if lead pump override tripped or MCC breaker trip.

CPH Recirculation Pump group Control:


1. CCR Operator Select From HMI Group Auto. Group start
5 CPH Recirculation Pump group start Command /Stop OK [ ]
1. CCR Operator Select From HMI Group Start command. sequence
2.According to the CCR Operator Pump Leag-lag Pre selection after that CPH
Function
No. of
& Interlock Pages
Test Record
2 of 2

CIPREL IV Volet B Project, Cote D’Ivoire 41A15


Project Plant Code Reg. No.

Componen
t: Pump &
Control Valve
Pump & Control Valve
Recirculation Lead pump will be start.
CPH Pump Group Stop Command
1.CCR Operator Select From HMI Group Stop command.

Function & Interlock Test Record For Control Valve

System & Location : CPH system

S.N System & Function Description Checked Result

Tag-10 CHP 100% & 20% Inlet Water Temperature Control Valve (10AHPTCV571&572)
1.1.This Control Valve is able to open/close from remote with satisfied
precondition.
Remote Ok[ ]
1.2.All operating & Control Function same for both 100% & 20% Control valve only the Major
Difference is PID Controller Output Fx(23y) For 20% Control Valve & PID Controller Output
Fx(21y) For 100% Control Valve
2. Set Point
Control valve will modulate as per Set point.
2.1. Remote Set Point
1
2.1.1.Remote Set point Temp 54 (°C) During NG Firing Case.
2.1.2.Remote Set point Temp 127 (°C) During HVO Firing Case. Set Point Ok[ ]
2.1.3.Remote Set point Temp 129.5 (°C) During DDO Firing Case.
2.2.Manual Set Point
2.2.1.CCR Operator Select From HMI auto & As per Field Requirement CCR Operator Click
from HMI Set point Local Push Button & Enter the value.
3. Process Value
Process
3.1.CPH Inlet Water Temp Transmitter 10AHPTT102A & B All two transmitter Average Value is Ok[ ]
Value
called Process value.