Richa Group of Companies were
incorporated in 1977.
COMPANYCOMPANY

PROJECT I Richa Group has over 22 fully integrated


manufacturing units in
PROJECT II Delhi, Gurgaon, Noida and Bangalore.
SWOT
ANALYSIS Richa Global is one of the new facility
which was set up in Oct 2006 at Gurgaon.

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
COMPANY P R
PROFILE roduct ange:
All Types Of Knitted Garments

The product range covers


COMPANYCOMPANY T-Shirts
Collar-Shirts
PROJECT I
Night Wear
PROJECT II Skirts
SWOT Overcoats
ANALYSIS Jerkins
Jackets
Sports wear

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
COMPANY E
STEEMED CUSTOMERS
PROFILE
GAP
Tommy Hilfiger
COMPANYCOMPANY
WAL-MART
PROJECT I DKNY
Calvin Klein
PROJECT II Liz Claiborne
SWOT American Eagle
ANALYSIS Armani Exchange
IZOD
NAUTICA

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
COMPANY
PROFILE Monthly Production: 2,60,000 Pcs.

COMPANYCOMPANY Worker’s Capacity: 1400 workers

PROJECT I
Factory Floor Space: 97,715 Sq. Feet
In Five Floors Including Basement
PROJECT II

SWOT Total Production Area: 45,074 Sq.Feet


ANALYSIS (Cutting, Sewing, Washing & Finishing

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
ORGANISATIONAL STRUCTURE
DIRECTOR

FACTORY MANAGER
Mr.NAYAN WAGHELA

SENIOR SENIOR SENIOR SENIOR SENIOR FINISHING QUALITY PURCHASE MANAGER ACCOUNTS WASHING & MANAGER TECHNICAL
MERCHANT MERCHANT MERCHANT MERCHANT MERCHANT MANAGER MANAGER Mr.AJEET MANAGER DYEING HR & COMPLIANCES MANAGER
Ms.VINNY Mr.VIPIN Ms.RIDHIMA Ms.MANPREET Ms.PHALGUNI Mr RAJU Mr.AMIT Mr.ASHOK MANAGER
GUPTA Mr.RAKESH

PRODUCTION ASST. INDUSTRIAL


Jr.Merchants Jr.Merchants CO-ORDINATOR ENGINEER
-Mr.TARANDEEP -Mr.PANKAJ Jr.Merchants Mr.DILIP SHARMA Mr.ABHISHEK GOEL
Jr.Merchants Jr.Merchants
-Ms.SAUMYA -Mr.ASHISH -Ms.POONAM -Ms.SONIA --Ms.SONIA
-Ms.DIVYA Ms.ANUBHUTI -Ms.NEHA Mr.DINESH -MrYASH EXECUTIVE
Mr.SUNEET

CUTTING
MACHINE MAINTAINENCE
FLOOR PACKING INCHARGE SAMPLING
INCHARGE
INCHARGE INCHARGE Mr.RAM MASTERS
Mr.SUNIL
Mr.KAMAL BILAS

LINE ELECTRICAL
SUPERVISORS TECHNICIAN
PROJECT 1

COMPANY
WASTAGE: ESTIMATION AND
PROJECT
PROJECT
I I CONTROL MEASURES

PROJECT II Time allotted for project –


SWOT 2 weeks(30th June- 12th July)
ANALYSIS

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1
To define wastage and outline the
challenges to control it
OBJECTIVES
To calculate wastage of each
department through study of
COMPANY styles

PROJECT
PROJECT
I I To identify the stages of wastage

PROJECT II To find waste percentage and the


cost lost in wastage through the
SWOT
costing sheet
ANALYSIS

WASTAGE
To develop formats on wastage for

CONTROL
each department and the costing
sheet

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
PROJECT 1 WHAT IS WASTAGE?

DEFINITION
Waste is purchased raw material
that is subsequently not sold as
COMPANY
product.
PROJECT
PROJECT
I I
Waste costs money. Reducing the
PROJECT II
amount of waste the company
SWOT
ANALYSIS produces will increase profits and

WASTAGE
help the company to remain

CONTROL
competitive.

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
PROJECT 1 To evaluate the amount of
wastage happening at various
stages and its reasons, study was
conducted on 3 styles.
STYLES

BUYER: DKNY
COMPANY STYLE NO. KP-28
GARMENT: HOODIE JACKET
PROJECT
PROJECT
I I

PROJECT II BUYER: NAUTICA


SWOT STYLE NO. 7K3502
ANALYSIS GARMENT: POLO

WASTAGE
CONTROL
BUYER: NAUTICA
STYLE NO. 7K3501
GARMENT: POLO
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
FINDINGS

STYLES STYLE KP28. STYLE 7K3502. STYLE 7K3501.

STAGES WASTAGE WST % WASTAGE WST % WASTAGE WST %


FABRIC 160KG 6.40% 50KG 3.20% 161KG 8.50%
CUTTING 1 0% 0 0% 37 0.83%
BUNDLING 28 1.20% 0 0% 77 1.73%
WASHING / DYIENG
SEWING 13 0.52% 187 5.12% 140 3.21%
WASHING / DYEING 17 0.49%
*Still in
PRINTING 10 0.40% 21 0.61% progress
*Still in
FINISHING 160 6.40% 33 0.96% progress
TOTAL 14.92% 10.38% 14.26%
TOTAL LOSS IN RS. RS.
WASTAGE RS. 99,960. 52,296. 76,041.
WASTE PERCENTAGE AT VARIOUS STAGES

FINISHING 0.96% STYLE 7K3501


6.40% STYLE 7K3502
STYLE KP28
PRINTING 0.61%
0.40%

0
WASHING / DYEING 0.49%
ST AGES

3.21%
SEWING 5.12%
0.52%

1.73%
BUNDLING 0%
1.20%

0.83%
CUTTING 0%
0%

8.50%
FABRIC 3.20%
6.40%

0.00% 1.00% 2.00% 3.00% 4.00% 5.00% 6.00% 7.00% 8.00% 9.00%
WASTE PERCENTAGE
WASTAGE STAGES
FABRIC SOURCED FROM OUTSIDE

FABRIC ISSUED TO CUTTING

PCS.CUT

CUT PCS. ISSUED TO BUNDLING

PCS. ISSUED TO PRINTING

PCS. REC. FROM PRINTING

PCS. ISSUED FROM BUNDLING TO SEWING

PCS. FROM PROD. TO FINISHING

PCS. ISSUED FROM FINISHINGTO WASHING/DYEING

PCS. REC. FROM WASHING/DYEING

PCS. ISSUED TO PRINTING

PCS. REC. FROM PRINTING

PCS. ISSUED TO FINISHING

PCS. ISSUED TO PACKING


PROJECT 1
REASONS
Fabric store
COMPANY Inspection of the incoming fabric is very
important. The fabric which is sourced from
PROJECT
PROJECT
I I
outside into the fabric store should be
PROJECT II inspected for the defects.
SWOT
ANALYSIS

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1
Wastes in the Cutting Room
REASONS

Wastes in the cutting room can come


COMPANY
from several sources including marker
PROJECT
PROJECT
I I
utilization, cutting waste and roll
PROJECT II remnants.
SWOT
ANALYSIS

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1
Bundling Room
REASONS

The inspection is not 100%, some


COMPANY
defective pieces go undetected
PROJECT
PROJECT
I I and reach the stage of production

PROJECT II

SWOT
ANALYSIS

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1
Production floor
REASONS
The loaders load the lines with the
COMPANY bundles which pass on in the line
according to the operation. The
PROJECT
PROJECT
I I
operator may find the piece
PROJECT II
defective at any stage and dispose
SWOT it off there and then only.
ANALYSIS

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1
REASONS Dyeing and Washing:

COMPANY The wastage happens when either


the pieces are lost or misplaced
PROJECT
PROJECT
I I
during the transportation.
PROJECT II

SWOT
ANALYSIS

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1
Printing / Embroidery:
REASONS
The printing on the garment
COMPANY does not match the standard
while in case of embroidery, it
PROJECT
PROJECT
I I
may not be on the correct place
PROJECT II
on the garment or the number of
SWOT threads used are less and
ANALYSIS
desired effect is not obtained.

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1
Finishing
REASONS

Measurement / Fit defect


COMPANY
Trims defect
PROJECT
PROJECT
I I
Pressing
PROJECT II

SWOT
ANALYSIS

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1 M AIN CAUSES OF WASTAGE
IDENTIFIED ARE
1.Motion
CAUSES
2.Delay or waiting

COMPANY 3.Conveyance (moving things


around)
PROJECT
PROJECT
I I 4.Correction(defects)

PROJECT II 5.Overprocessing

SWOT 6.Inventory
ANALYSIS
7.Overproduction

WASTAGE 8. Knowledge disconnection

CONTROL
underutilization of resources

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
INFERENCES FROM QUESTIONNAIRE_

High 10 Delay or waiting


Correction (defects)
9
8 Knowledge disconnection or underutilization of resources
7
6 Incorrect method of working
Moderate 5 Inventory
Overprocessing
4 Overproduction
Poor quality check
3
2 Human errors
Low 1
PROJECT 1
WASTE REDUCTION METHODS
METHODS

Wastes in the Cutting Room


COMPANY

PROJECT
PROJECT
I I Care in movement of work-in-
progress
PROJECT II

SWOT
ANALYSIS Quality Control

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1 WASTE STREAM REDUCTION
PRACTICES FOR APPAREL
RECOMMENDATION 1 MANUFACTURERS

COMPANY
TO DEVELOP A COMPREHENSIVE
PROJECT
PROJECT
I I WASTE MANAGEMENT SYSTEM

PROJECT II

SWOT
ANALYSIS

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1 WASTE STREAM REDUCTION
PRACTICES FOR APPAREL
RECOMMENDATION 2 MANUFACTURERS

COMPANY
TECHNIQUES TO REDUCE INDUSTRY
PROJECT
PROJECT
I I SPECIFIC WASTE

PROJECT II

SWOT
ANALYSIS

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1 WASTE STREAM REDUCTION
PRACTICES FOR APPAREL
RECOMMENDATION 3 MANUFACTURERS

COMPANY
TO HANDLE SPECIFIC
PROJECT
PROJECT
I I OPERATIONAL WASTES

PROJECT II

SWOT
ANALYSIS

WASTAGE
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 1 TO CONTROL COST LOST IN
WASTAGE

MEASURES
Finish In Time

COMPANY
Minimum Changes in Original
PROJECT
PROJECT
I I Design

PROJECT II

SWOT Least Make Break/ Rework


ANALYSIS

WASTAGE
Keep Check on Labour and

CONTROL Material Costs

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
PROJECT 1 Avoid Rework due To bad Quality

MEASURES Optimise Usage of Material

COMPANY
Enhance Labour Productivity
PROJECT
PROJECT
I I through Skills Training

PROJECT II
Efficient Management Information
SWOT
ANALYSIS Systems for Timely Decision

WASTAGE
Making

CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
INFERENCES FROM QUESTIONNAIRE

High 10 Finish in time


Least make break/rework
Keep check on labour and material costs
Avoid rework due to bad quality
Enhance Labour Productivity through Skills Training
Efficient Management Information Systems for Timely Decision Making
9
8
7
6 Optimise Usage of Material
Moderate 5 Avoid Lumpsum Contracts
Minimum Changes in Original Design
4
3
2
Low 1
PROJECT 2

COMPANY
To Identify the critical quality
checkpoints in the industry in
PROJECT I Fabric Store
Accessory Store
PROJECT
PROJECTII
II Spreading and Cutting
Department
SWOT Sewing Department
ANALYSIS Finishing Department

QUALITY
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 2
To analyze the existing quality
OBJECTIVE
systems, trends available in the system
and study its utilization for corrective
action.
COMPANY

PROJECT I Propose measures to improvise the


quality system.
PROJECT
PROJECTII
II

SWOT To study the existing quality control


ANALYSIS norms and procedure in various
departments

QUALITY
CONTROL
To make the quality monitoring process
more efficient and reliable

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
PROJECT 2
Time allotted for project –
METHODOLOGY 2 weeks(30th June- 12th July)

COMPANY Step 1 – Study of the system


Step 2 – Review of existing quality system
PROJECT I
Step 3 - Analysis of quality checkpoints
PROJECT
PROJECTII
II followed by Buying House
Step 4 – Analysis of checkpoints in the
SWOT
industry (through flowcharts)
ANALYSIS
Step 5 – Identifying the problem areas

QUALITY Step 6 – Suggesting ways to improve

CONTROL production

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
PROJECT 2
INFERENCES

FROM QUESTIONNAIRE_:
COMPANY
Most of the rejections are followed by
PROJECT I their own QC personnel and QC Head
followed by inspection agencies and
PROJECT
PROJECTII
II buying houses.

SWOT The approximate amount of money


ANALYSIS spent as a result of poor quality ranged

QUALITY
from 5%-7% of sales.

CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 2 REASONS FOR REJECTS IN PERCENTAGE
Fab ric shad e variat io ns and
o t her f ab ric d ef ect s

10%
INFERENCES Wo rkmanship
10%

Pro cessing
10% 50%

COMPANY Po o r rub b ing Qualit y

20%
Cut t ing d ef ect s, d amag es
d uring manuf act uring ( w ro ng
PROJECT I b ut t o ning , et c)

CAUSES OF "BULK OF HARM"


PROJECT
PROJECTII
II

SWOT 10%
Wrong Pat t ern
20%
ANALYSIS Sewing Defect s

QUALITY
30% Fabric problems

CONTROL
Improper washing
and dy eing
40%

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
Fabric arrives from textile industry

Inspection for Fabric Defects by checkers

IN-HOUSE QUALITY
Fabric issued for embroidery Fabric issued to cutting department

INSPECTION
Spreading

Under constant supervision by Quality Controllers

Cutting

COMPANY Under constant supervision by Quality Controllers

Bundling

PROJECT I Cutting Audit

Bundles issued for printing Bundles issued to sewing department

PROJECT
PROJECTII
II
Bundles issued to sewing lines

SWOT
ANALYSIS In-line inspection at critical pts(100% or according to criticality of style

QUALITY
End-Line Inspection
NOTE:

CONTROL
QUALITY
Washing B/A, B/H, B/T CHECKERS

QCs
X

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
X

IN-HOUSE QUALITY Finishing

Thread Cutting

INSPECTION General Checking

Measurement Checking
On Iron tables

Thread Cutting
COMPANY
General Checking

PROJECT I Final Checking

Re-Final Checking
PROJECT
PROJECTII
II
Measurement Checking

SWOT
ANALYSIS Balancing

QUALITY
Needle Checking (needle detection)

CONTROL
Packing (Buying House inspection)
NOTE:

QUALITY
Dispatch to Buyer
CHECKERS

QCs
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 2
INFERENCES

COMPANY STAGES AT WHICH QUALITY PROBLEMS ARE FACED


PROJECT I 50%

50%
35%
PROJECT
PROJECTII
II 40%

30%

SWOT 20%
8% 7%
ANALYSIS 10%

QUALITY
0%
M A N UF A C T UR IN G F IN ISH IN G A N D C UT T IN G F A B R IC IN C OM IN G
P A C KA GIN G A N D ST OR A GE

CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 2 R easons for which the quality is not
given stress are:
INFERENCES
Lack of presence of good markers in the
cutting department

COMPANY NO. OF GARM ENTS OUT OF 100

100 95
89
MARKINGS TO BE REMOVED

89
NO. OF GARMENTS WITH

90
PROJECT I 80
79

67
82
72
83
NO. OF
67
GARM ENTS
BY SPOTTING

70 64
WI TH
60
M ARKI NGS TO
PROJECT
PROJECTII
II 50
40
BE REM OVED
BY SPOTTI NG
30

SWOT 20
10
ANALYSIS 0
7/ 1/ 20 07

7/ 2/ 20 07

7/ 3/ 20 07

7/ 4/ 20 07

7/ 5/ 20 07

7/ 6/ 20 07

7/ 7/ 20 07

7/ 8/ 20 07

7/ 9/ 20 07
6/ 30 / 20 07

7/ 10 / 20 07

7/ 11 / 20 07

7/ 12 / 20 07
DAT E

QUALITY
CONTROL APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 2
INFERENCES

Lack of proper formats for tracking the


COMPANY defects in accessory and fabric
department
PROJECT I
Improper fabric inspection
PROJECT
PROJECTII
II Improper ply alignment and varying ply
SWOT tension
ANALYSIS

QUALITY
CONTROL APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 2
INFERENCES Shorter lead time and large orders

The number of alterations in the pieces


COMPANY is high.

LINE AVG :1st week AVG :2nd week TOTAL


PROJECT I NO. 30THJUNE-5THJULY 6TH JULY-12THJULY AVG
1 13.22% 10.71% 11.97%
PROJECT
PROJECTII
II 2 10.85% 9.17% 10.01%
3 16.26% 9.72% 12.99%
SWOT 4 10.46% 9.14% 9.80%
ANALYSIS 5 8.19% 7.37% 7.78%

QUALITY
6 11.26% 7.88% 9.57%
7 14.40% 17.89% 16.15%

CONTROL
8 24.81% 14.75% 19.78%
9 7.43% 21.99% 14.71%

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
There is no proper system for repair
PROJECT 2 control.

A lot of time is spent in material handling


INFERENCES
Piling up of huge WIP in the lines

COMPANY WIP AS ON 5TH JULY, 2007

8000 7680

PROJECT I 7000
6000
5000
PROJECT
PROJECTII
II 4000
WIP AS
ON 5TH
3000 2400 2502 2500 JULY,
2007
SWOT 2000 809 1111 616

ANALYSIS 1000 452

0
7K3000

7K3000

7K3000

7K3000

7K3000

7K3000
MG37U07
CK#007(39000)

QUALITY
CONTROL 1 3 5 6 7 8 9 10

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
PROJECT 2
INFERENCES Lack of proper thread cutting machines

THREAD CUTTING OBSERVATION STYLE NO 7590


COMPANY
400 356
350 326
NO. OF THREADS
bot t om
PROJECT I 300
neck
250 212
underarm
200
sleeve hem
PROJECT
PROJECTII
II 150 105
139
placket
100 56 67 63
side seam
SWOT 50 5
21 19 18 28 29
label
0
ANALYSIS upt o 3mm 3mm t o 1cm above 1cm

QUALITY
SIZE OF THREAD

CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 2
RECOMMENDATION I
Proper Training

COMPANY Supervisors
PROJECT I Operators
PROJECT
PROJECTII
II Quality checkers
SWOT
ANALYSIS

QUALITY
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 2 To keep a check on repairs
Designate a special person (helper) as
RECOMMENDATION II a repair person and a special rack at
each examination point (in-line and
final examination)
COMPANY Examiner must mark the faults

PROJECT I Put the complete faulty bundle in the repair rack

PROJECT
PROJECTII
II Collection of the faulty bundles in the repair rack and record
them on the repair list
SWOT
ANALYSIS Give the bundle to the appropriate operator

QUALITY Bundle should be returned back to the QC within 1 hour of

CONTROL
its collection by the repair person

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS


PVT.LTD.,GURGAON
PROJECT 2 Random inspection by
Roaming QC
RECOMMENDATION III

Use of Random Number Table


COMPANY
Use of Red and Yellow Card System
PROJECT I
Use of Uncleared Operators Recording
PROJECT
PROJECTII
II
format_
SWOT
ANALYSIS

QUALITY
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
PROJECT 2
RECOMMENDATION IV Use of formats

COMPANY
Use of formats for tracking of defects in
accessory (accessory audit report) and
PROJECT I
washing department(after and before wash
report) for proper tracking of defects
PROJECT
PROJECTII
II

SWOT
ANALYSIS

QUALITY
CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
STRENGTHS
COMPANY In-House Facility

PROJECT I Good Working Relationship

PROJECT II Capacity expansion

SWOT SWOT
ANALYSIS
ANALYSIS

SWOT
ANALYSIS
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
WEAKNESSES
Due to shorter lead times, the quality is not
upto the mark.
COMPANY
Competition from other domestic knit
industries.
PROJECT I
No T&A charts
PROJECT II
Data is stored in files instead of computers
SWOT SWOT
in many departments
ANALYSIS
ANALYSIS

SWOT
Absence of production Planning Department

ANALYSIS
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
OPPORTUNITIES
Export income from garments made from
COMPANY knit fabrics increased by 64%

Quotas are gone now for 31 months, and


PROJECT I India has the opportunity to derive the
maximum gains as a garment exporter.
PROJECT II
Consolidation of global retail industry.
SWOT SWOT
ANALYSIS
ANALYSIS

SWOT
ANALYSIS
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
THREATS
Richa Global Exports Pvt. Ltd. will have to
gear up to global standards and
COMPANY expectations of quality, delivery schedules
and still remains sharply cost competitive.
PROJECT I
Indian Export house faces competition from
PROJECT II Bangladesh, Indonesia, etc. as they are the
SWOT SWOT lowest cost supplier in almost all categories
ANALYSIS
ANALYSIS

SWOT
ANALYSIS
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS
PVT.LTD.,GURGAON
Thank You

Вам также может понравиться