100

240Sq.mm STRANDED COMMERCIAL


HARD DRAWN TINNED COPPER WIRE

70Sq.mm Cu. BARE CONDUCTOR FOR


CABLE LADDER EARTHING
20mm. DIA COPPER CLAD STEEL EARTH
Millimetres

ROD (FOR GENERAL EARTHING)


20mm. DIA EARTH ROD WITH INSPECTION
CHAMBER (FOR NEUTRAL EARTHING OF
TRANSFORMER.)
20mm. DIA EARTH ROD WITH INSPECTION
CHAMBER (FOR CORNER OF THE
BUILDING)
20mm. DIA EARTH ROD WITH INSPECTION
CHAMBER (FOR EQUIPMENT PANEL
EARTHING)
10

LUG CONNECTION
KEY PLAN
0
DO NOT SCALE

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE


NOTED.
2. ALL DOWN CONDUCTORS ARE DIRECTLY CONNECTED TO
THE EARTH ELECTRODE.
3. THE LOCATION OF EARTH ELECTRODES & EARTHING
CONDUCTORS ARE INDICATIVE ONLY. IF IT INTERFERES WITH
THE FOUNDATION/STRUCTURE THE SAME SHALL BE
REROUTED IN CONSULTATION WITH THE SITE ENGINEER.
4. EITHER SPECIFICALLY SHOWN IN THIS DRAWING OR NOT, ALL
MOTORS, CABLE TERMINAL BOX, SWITCH, CONTROL PANELS,
HANDRAILS, LIGHT FIXTURES, LIGHTING PANELS,
RECEPTACLES, CABLE TRAYS, STEEL STRUCTURES SHALL BE
EARTHED,AT MINIMUM TWO LOCATIONS.

ASSOCIATED & REFERENCE DRAWINGS:

CPCDP - ATK - HEL - SS - DR - E - 1000 - 220/33kV


SUBSTATION - R1
PHASE - 1 LAYOUT
SITE LAYOUT
CPCDP - ATK - HEL - SS - DR - E - 1001 - 220/33kV
SUBSTATION - R1
PHASE - 1
BASEMENT LAYOUT

CABLE BASEMENT - 1 CABLE BASEMENT - 1

R0 30-11-17 CEB SUBMISSION BK KS SP

Rev. Date Description By Chk'd App'd

Drawing Status Suitability

Project Title
COLOMBO PORT CITY
BASEMENT FLOOR PLAN DEVELOPMENT PROJECT
Client
CHEC PORT CITY COLOMBO (PVT) LTD.
No.54,4th & 5th Floors,
Central Point Building,
Chatham Street,
Colombo 01
Tel:+94 112 335 141 / 42 / 43
Fax:+94 112 335 140
Design Consultant
Woodcote Grove
Ashley Road
Epsom
Surrey
KT18 5BW
Tel: +44 (0)1372 726140
Fax: +44 (0)1372 740055
Copyright C Atkins Limited 2017 www.atkinsglobal.com
Drawing Title

220/33kV SUBSTATION - R1 PHASE - 1


BASEMENT EARTHING LAYOUT
( SHEET 1 OF 6)
Scale Designed / Drawn Checked Approved Authorised
1:125 BK SP RK MB
Original Size Date Date Date Date
A1 30-11-17 30-11-17 30-11-17 30-11-17
Drawing Number Project Ref. No.
Project Originator Volume

CPCDP - ATK - HEL - Revision

SS - DR - E - 1005 R0
Location Type Role Number

Plotted by: basa2017 Date: Feb 01, 2018 - 8:10pm