Профессиональный Документы
Культура Документы
SSG-NG01017365-GEN-CS-8180-00007
Proprietary Information: This document contains proprietary information and may not be partly or wholly reproduced
without prior written permission from Shell Petroleum Development Company
Revision Date Status Originator Checker Approver
Page 1 of 53
Revision Philosophy
Revisions for review will be issued at R01, with subsequent R02, R03, etc. as required for FEED.
Revisions for review will be issued at D01, with subsequent D02, D03, etc. as required for DED
Deliverables
All revisions approved for issue or design will be issued at A01, with subsequent A02, A03, etc as
required.
Documents approved for Construction will be issued at C01, C02, C03, etc as required
Documents or drawings revised as “As built” will be issued as Z01, Z02 Z03 etc as required
Narrative sections revised from previous approved issues are to be noted in the table below and/or
highlighted in the RH margin (using the appropriate revision status) thus: A02
Previous revision highlighting to be removed at subsequent issues.
Drawings/diagrams revised from previous approved issues are highlighted by 'clouding' the affected
areas and by the use of a triangle containing the revision status.
If a document is cancelled the document will be issued at the next sequential number and suffixed with
a X. For example if 02R is the current revision then 03X will be the Cancelled revision.
Revision History
Page 2 of 53
Page 3 of 53
The project scope includes all works necessary for, arising out of and incidental to the
Engineering, Procurement, Installation and Commissioning of 16” x 34km Southern Swamp
Sales Gas Evacuation Pipeline from the Tunu Central Processing Facility (CPF) in Ekeremou
Local Government Area of Bayelsa State to the EA Riser Platform – A (EARP-A) Offshore
Nigeria. This Pipeline provides the only evacuation route for processed Gas from Tunu CPF in
order to meet COMPANY’s domestic gas supply and flares down obligations on the Southern
Swamp Sales Gas Evacuation Pipeline (SSSGEP) Projects.
The Sales Gas Evacuation Pipeline shall convey hydrocarbon and water dew pointed gas from
Tunu CPF to the domestic gas market using existing pipeline infrastructure downstream of
EARP-A and thus the 16” x 34km Sales Gas Evacuation Pipeline must meet stringent export
gas specifications for the Escravos Lagos Pipeline System (ELPS). The offshore section of the
16” x 34km Tunu to EA Riser Platform A is approximately 18.4km of the total pipeline length
inclusive of the shore approach area. The remaining onshore section (swamp and river
crossings) is estimated as 15.6km.
The 16” x 34km Southern Swamp Sales Gas Evacuation Pipeline shall be installed from the pig
launcher platform around 354,367mE 97,144mN at Tunu Central Processing Facilities (CPF) in
Ekeremo Local Government Area of Bayelsa State and will hook up to a pre-installed riser
flange around 325,789.86mE 84,099.51mN at EA Riser Platform - A (EARP-A) Offshore
Nigeria.
Develop a lift model for the Pig Launcher Platform (Module 1, 2) and Hoist Structure
(Module 3).
Ensure that all structural elements satisfy code check requirements in accordance with
Eurocodes, Shell’s DEPs as well international codes and standards and are adequate
for Ultimate Limit State and Serviceability Limit State conditions during lifting.
Page 4 of 53
Lifting analysis was performed using STAAD.pro for each of the modules in line with factors,
loads and parameters defined in the relevant sections of Eurocodes, Shell’s DEP, DNV codes
and Civil/Structural Design Basis.
The resulting sling forces shall be used for the design of lifting pad-eyes and to select
appropriate sling and shackle materials.
SPECIFICATION
DEP 34.00.01.30 Gen-: Structural Design and Engineering of Onshore Structures. Feb 2015.
PROJECT DOCUMENTS
Piping Arrangement Drawing Plan – Tunu CPF Export Gas Pig Launcher (A – 2309) - (SSG-
NG0107365-TUNG1-MP-4018-00001_D02 Sheet 1/1).
Tunu CPF – Pig Launcher Structural Steel Platform (Framing Plan) _ SSG-NG01017365-
GEN-CX-2386-00001_C02.
Page 5 of 53
Page 6 of 53
2.1 General
The pig launcher platform lift models were derived from the platform inplace model. The lift
models for modules 1, 2 & 3 were developed in STAAD.Pro V8i (select series 5) and
configured as a 4-point single hook lift with minimum sling angle of 60 deg to the horizontal.
For respective modules, the centre of gravity was generated by the software and the hook
point was positioned directly above it. The sling height was computed and the result used to
position the hook point.
The basic material properties used in the structural analysis and design are as follows:
Steel
Steel grade S275
Yield strength 275 N/mm2
Young modulus of steel 210000 N/mm2
Poison ratio 0.3
Steel Density 7850 Kg/m3
Shear Modulus, G 0.81 x 105 N/mm2
Page 7 of 53
The effective length coefficients for STAAD.Pro analysis models are as follows:
Ky Kz
The structural frame for each of the pig launcher platform modules were fixed at the hook
points. At the assumed support points, a restraint in the x and z direction with a spring
constant of 100 N/mm (100 kN/m) was applied.
Also, the module for hoist structure was fixed at the hook point. At the support points, a
restraint in the x and z direction with a spring constant of 100 N/mm (100 kN/m) was applied.
Page 8 of 53
Hook Point
Hook Point
X = 0.00 Hsling
Y = 0.00
Z = 0.00 60 Deg.
9.600
R
CoG
Z
X = 2.684
X Y = 0.00
Z = 4.849
3.555
Page 9 of 53
Hook Point
Hsling
X = 0.00
Y = 0.00 60 Deg.
7.884
Z = 0.00
R
Z CoG
X = 2.698
X
Y = 0.00
Z = 5.108
3.555
Page 10 of 53
Hook Point
Hook Point
Hsling
X = 0.00
Y = 0.00 60 Deg.
2.500
Z = 0.00
R
Z CoG
X X = 2.337
Y = 0.000
Z = 1.208
2.900
Figure 3: Schematic Isometric view of module 3 showing coordinates and dimensions (y = 5.000)
Distance Z = 1.208 - 0.00 = 1.208 m
Distance X = 2.337 - 0.00 = 2.337 m
Diagonal length of the base dimension, R = Sqrt (X2 + Z2) = 2.631 m
The base angle of the sling to the horizontal is 60 degrees.
Sling angle = 60 Deg.
Vertical Height of sling, Hsling = R * Tan 600 = 4.56 m
Page 11 of 53
Lifting Sling
Pig Launcher
Platform (Module 1)
Figure 4: Isometric view of Pig Launcher Platform (Module 1) frame showing boundary
conditions.
Page 12 of 53
Lifting Sling
Restrained
Point (Typical)
Pig Launcher
Platform (Module 2)
Figure 5: Isometric view of Pig Launcher Platform (Module 2) frame showing boundary
conditions.
Page 13 of 53
Lifting Sling
Restrained
Point (Typical)
Figure 6: Isometric view of Hoist Structure (Module 3) frame showing boundary conditions.
Page 14 of 53
Similarly, the applied dead loads for the hoist structure consist of the self-weight of the
structure, grating and drip pan dead loads.
The applied dead loads were derived from the load computaion in the Pig Launcher Platform
Calculation Report SSG-NG01017365-GEN-CS-8180-00001_D02. See table below for load
summary.
Module 2
1 Self-weight SW
2 Grating Dead Load GD
3 Handrail Dead Load HD
4 Stair Dead Load SD
Module 3
1 Self-weight SW
2 Grating/Drip pan Dead Load GD/DP
Page 15 of 53
The basic loads state above were combined in accordance to Design Approach 1 (DA 1)
and DEP 34.00.01.30 clause 2.3.2 – to give the onerous loading combination for the lifting
analysis of each of the models. From the above stated DEP, the impact factor (DAF) for
lifting/ jack lugs/padeye is 2.0 while the impact factor (DAF) for other members is 1.3. See
the table below for combination summary
Module 1
Combination Number Load Combination
SW GD HD
101 1.00 1.00 1.00
201 1.30 1.30 1.30
301 2.00 2.00 2.00
Module 2
Combination Number Load Combination
SW GD HD
101 1.00 1.00 1.00
201 1.30 1.30 1.30
301 2.00 2.00 2.00
Module 3
Combination Number Load Combination
SW GD/DP
101 1.00 1.00
201 1.30 1.30
301 2.00 2.00
Page 16 of 53
The resulting sling forces shall be used for design of pad-eyes and selection of sling material
for respective modules.
SLING FORCE SUMMARY (MODULE 1)
Maximum Axial Force
S/No. Description Load Cases
(kN)
1 Sling 1 (Beam 357) 301 64.098
2 Sling 2 (Beam 358) 301 70.315
3 Sling 3 (Beam 359) 301 64.974
4 Sling 4 (Beam 360) 301 74.744
Page 17 of 53
MODULE 1
PRIMARY BEAMS
SECONDARY BEAMS
PIPE SUPPORTS
MODULE 2
PRIMARY BEAMS
SECONDARY BEAMS
PIPE SUPPORTS
Page 18 of 53
COLUMNS
BEAMS
Page 19 of 53
9.60 m
Figure 7: Isometric view showing four (4) lifting positions and sling vertical height of Module 1
Table 8-1, DNV 2.7-1 Minimum working Load Limit, WLLmin = 13.07 Tons
Required norminal shackles working load limit at a single point, = WLLmin 13.070 Tons
where
R
S
F
6
0
°
F
x
T
o
p
o
f
P
l
a
t
f
o
r
m
Page 20 of 53
Page 21 of 53
Design resistance of weld per unit length, F w,Rd = F ww.d*a = 981.36 N/mm
Page 22 of 53
Shackles
Page 23 of 53
Table 8-1, DNV 2.7-1 Minimum working Load Limit, WLLmin = 13.07 Tons
Required norminal shackles working load limit at a single point, = WLLmin = 13.070 Tons
where
0.45*RSF = 3.43
The details of the adopted shackle are as highlighted in red colour above.
Sling
For the above stated WLL, the require sling diamter is 24 mm as highlighted above for four leg sling.
Page 24 of 53
10.01 m
Figure 9: Isometric view showing four (4) lifting positions and sling vertical height of Module 2
Table 8-1, DNV 2.7-1 Minimum working Load Limit, WLLmin = 13.07 Tons
Required norminal shackles working load limit at a single point, = WLLmin 13.070 Tons
where
R
S
F
6
0
°
F
x
T
o
p
o
f
P
l
a
t
f
o
r
m
Page 25 of 53
Page 26 of 53
Design resistance of weld per unit length, F w,Rd = F ww.d*a = 981.36 N/mm
Page 27 of 53
Shackles
Page 28 of 53
Table 8-1, DNV 2.7-1 Minimum working Load Limit, WLLmin = 13.07 Tons
Required norminal shackles working load limit at a single point, = WLLmin = 13.070 Tons
where
0.45*RSF = 3.41
The details of the adopted shackle are as highlighted in red colour above.
Sling
For the above stated WLL, the require sling diamter is 24 mm as highlighted above for four leg sling.
Page 29 of 53
4.63 m
Figure 11: Isometric view showing four (4) lifting positions and sling vertical height of Module 3
Table 8-1, DNV 2.7-1 Minimum working Load Limit, WLLmin = 8.41 Tons
Required norminal shackles working load limit at a single point, = WLLmin 8.41 Tons
where
R
S
F
6
0
°
F
x
T
o
p
o
f
P
l
a
t
f
o
r
m
Page 30 of 53
Page 31 of 53
Design resistance of weld per unit length, F w,Rd = F ww.d*a = 981.36 N/mm
Page 32 of 53
Shackles
Page 33 of 53
Table 8-1, DNV 2.7-1 Minimum working Load Limit, WLLmin = 8.41 Tons
Required norminal shackles working load limit at a single point, = WLLmin = 8.410 Tons
where
0.45*RSF = 1.46
The details of the adopted shackle are as highlighted in red colour above.
Sling
For the above stated WLL, the require sling diamter is 20 mm as highlighted above for four leg sling.
6.0 CONCLUSION.
The lifting analysis results for modules 1, 2, 3 show that the general lifting configuration
satisfy code check requirement and are therefore adequate to withstand the lifting stresses
Also, appropriate lifting-eyes, shackles and slings were selected in accordance with reference
Eurocode, DNV codes and DEP standards.
Page 34 of 53
Page 35 of 53
Page 36 of 53
Page 37 of 53
Page 38 of 53
Page 39 of 53
Page 40 of 53
Page 41 of 53
Page 42 of 53
Page 43 of 53
Page 44 of 53
Page 45 of 53
Page 46 of 53
Page 47 of 53
Page 48 of 53
Page 49 of 53
Page 50 of 53
Page 51 of 53
Page 52 of 53
Page 53 of 53